Council archive · source document
00156B56.001
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
° TOWN PLANNING REPORT Ab .
ken nicks
The proposal meets the earthworks requirements prescribed in the earthworks code, and
otherwise will meet all other specific solutions of the code as outlined in Operational Works
documentation (attached).
Erosion and sediment control code
The overall outcomes sought for the Erosion and Sediment Control Code are the following-
a} there is no significant environmental harm caused by the effects of erosion and sediment .
transport associated with development:
b} disturbed areas are stabilised and restored promptly and effectively; and
c) disturbance of land is minimised.
The proposal meets all the requirements prescribed in the Erosion and Sediment Control code,
and otherwise will meet all other specific solutions of the code as outlined in Operational Works
documentation (attached).
@ Existing Services Code
The overall outcomes sought for the Existing Services Code are the following—
a) Existing Council owned underground infrastructure is protected from potential or actual
damage caused by development:
b}) Underground infrastructure is accessible for maintenance purposes; and
c) Existing services are identified and methods of protection and access are implemented in
the design of the development.
The proposal meets all the requirements prescribed in the Existing Services code, and otherwise
will meet all other specific solutions of the code as outlined in Operational Works
documentation (attached).
Water Supply and Sewerage Reticulation Code
The overall outcomes sought for the Water Supply & Sewerage Reticulation Code are the
following—
_ a) To provide water supply and sewerage reticulation infrastructure that is designed and
© constructed in a cost-effective, coordinated and efficient manner that supports ecologically
XQ sustainable development practices;
b) To ensure that, where sites have access to Council's reticulated sewerage system alll
associated infrastructure and connections are designed and constructed in accordance with
acceptable engineering design standards; and
c) All water supply and sewerage reticulation infrastructure designed and constructed by
private contractors utilise systems, processes and materials that are able to be fully integrated
into Council's existing infrastructure.
The proposal meets all the requirements prescribed in the Water supply and sewerage
reticulation code, and otherwise will meet all other specific solutions of the code as outlined in
Operational Works documentation (attached). : ,
June 2007 Material Change of Use for Retaii Business Type 2 Shop & Salon and Page 32 of 33
Visitor Accommodation Type 4 Conventional
33 Hastings Street, Noosa Heads .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156B56.001.pdfRelated documentPublic source context ↗
07/1181 - MCU - Retail Business Type 2 and Visitor Acommodation Type 4 & Demolition - Robert Selkirk [As Published]Related documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.