Council archive · source document
00156B56.001
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
j
Wececne ro ewreesseneeerecece. wee ceeeee aaae ener neenn ener enna n natn eennnnnnn ranean
Provide the new stormwater infrastructure froen ence anew ecw cee enn pew ensensen nn mnn ae enn eee rn rn nnn rane cenaewnen heres ewe an epee anne errr Flow direction
which connects to the stormwater system of ~ 2 5, ' F een
the local Authority prior to any further activity
on site. Ole. o.°0
the new stormwater infrastructure refer to oo
oo
drawing 1703-O-2 IA Ao o Od
xu
oo
o.9 iY
o'°o
iD oo
. @l=
a a Ka Ox 1
filters into
m_— dia) Flow direction
ir Flow direction
inemneedsccbuecesdcscccesescscbcneracéeseseesdssewesonsesesce SemnerEETeRes:
a ea eocceeceeee- aaa Pine x ~=oere =
9
wees cake
Construction site ‘emporary con Provide sedimentation basin during construction oo 500-500mm
Runoff to silt trap sediment our ucve entry/exit The sedimentation basin may be adjusted in °° i= Sp —~ Flow direction
wae accordance with the construction progress. However Geotextile oo \y/ ~—«
ao always ensure a minimum of 150mm freeboard to filter fabric
om the overflow weir. o (Oo j
o The overflow discharging from the sedimentation oo
basin shall be by means of gravity. However a pump oo
sump as shown in the detail shall be provided to a
Geofobric fabric, ensure heavy rainfall events can be dealt with. 50 -— 75mm —
Bidurn_U34 or similor Ensure no scouring occurs. Provide Resa sistance
such as large rocks or straw bales. i)
The sedimentation basin shall catch 100% of the
surface runoff from the site hence provide barriers
and dam walls as temporary measure to direct the
Lege clr athaen flow through the sedimentation basin.
F42 Fabric to AS15304 1
Oesturded crea
Geotextile fabric
Ss rf Fix to top of stoke with
fastener or
tie to steel! picket
Posts or steel pickets
Prior to the commencment of any construction activities the following measures driven 600mm into ground Geotextile Fabric
and F42
shall be incorporated:
00min vertical overiop of fabric Overiond flow 00min. 50xSO HW stake or stesi
Provide education of site personnel picket 1
Set up action plans as a precaution in case of disturbances occuring
especially after an unexpected strong rainfall event
Provide regular inspection and maintenance of all structures including the Undisturbed oreo fama] (scription | te
temporary structures. Perimeter sediment fence
refer detoil i a a a eT
ore bt
‘Obie 4 of OT bt
|
GENERAL NOTES LEGEND ree ee
These Drawings ore ere. inqremenatia. aoly and hell be read bp. conan een
Ne SS ae es auimn te casa at Oe written 2
Architectural and
meine Peerree: officer for decision before cos. Cieanout to surfoce
stares fff cer
sr, Veiuy on fixture locations, invert levels, surface levels, Existing storm woter Eccentric of Kore
cover to pipes are cores and ob prior commencement _ the work. Storm Water Droinoge = Kb ‘or Development Approval
existing, and
location of services, Gully Mon Hole
reievont Authority, or other trades os
the reievont
STORMWATER DRAINAGE Se TE chen AE: che ERS LOO INO. a9 Agi Oroin K&C Kerb & Channel p
rrr
Be 100 Dla PVC Pionter outiet niet bose ety for Construction | fT
COVE oe & FRAMES Real Property Boundary qo SS
vehicular traffic to be 535 dio, cast iron, medium Real Property description
app nt nape ehala be 535 dio. cost concrete in! light. duty, —— een Eccentric eniorger Roin woter 14 ae
areos be 600 aq. infill to match pavi
oan s roe ve ceitee bross edging. ° Fw tke
Spe 'SWO or “SEW as oppropnate. ve
Soon ks Promee tebe ‘Faston” or equal GP1 lly Pit Storm woter droin 100
GRATINGS o Trench grote transverse bor —— >i we
Trench grate longitudinal bor vl ky
storm water to be “faston, Gatic” or approved equal.
match ma u/g Underground Re
Du for loading condition. ——_——— Sediment Fence u/s Under siab te
Trench grote to tronsverse Uniess noted otherwise contact: Reinhold Koenning mitAust RPEQ No 7023
Floor waste grotee in pulite arose to be chrome plated Grose Sediment borrier u.n.0. $l PO Box
in privote areas may be PVC. FRONT ELEVATION — Buddine QLD 4575
aa Lg PH: 5444 8645
zs FX: 5444 8224
i}
Aomrez-
son ‘« v MR. & MRS SELKIRK
Notes sediment control gi
General fT =
control. Flow should be the work site where ST
b) All and martrctn te’ te imaoten Gnd be operetionel lore commencing up—siope one it PRovECcT: PROPOSED REDEVELOPMENT
pO
Gane manny 8 teers mln Svea ono Parone ‘soil NOOSA
All control measures to be inspected ct weekly ond 33 HASTINGS
% St SIDE ELEVATION
is obteined over
2. Sediment Fence The RSF 100 unit con be fitted to almost ony type
(0) Use woven f xit Sediment Trap. of grated or non~groted
3, toe, Construction Entry/Exi 2. The minimum depth dimension of D is 350mm.
Be cae ke we weeey feo Srey) oe
{8} freer = Se ters acre See Sea manually or by aor & E Sromon
4, Safety issues must be considered at all times, Incorpate traffic control devices to the satisfaction of the superintendent suction. OPERATIONAL WORKS
CON
5. All dimensions in millimetres unless indicated otherwise. PLAN
. Field inlet TYPICAL ECOSOL RSF100 RETRO-FIT CONFIGURATION
A stabilised overtand flow path should exist adjocent to the field inlet Bessor] RK Date |29~ Deg. No.
Water level contro! banks may be required
Blocks to be by @ horizontal roll ot block join height fixed to timber stokes ot corners
7. Safety issues must be considered at all times, incorporate traffic contro! devices to the satisfaction of the Superintendent scat 1 1:100 maruna| 4 oF 4 1703-0-See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156B56.001.pdfRelated documentPublic source context ↗
07/1181 - MCU - Retail Business Type 2 and Visitor Acommodation Type 4 & Demolition - Robert Selkirk [As Published]Related documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.