‘ INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters - |2. The application involves: (tick applicable box/es)
For more information refer fo Guide 3. .
Unless you snone cf the above" to Q2, [J (i) development on land contiguous* to a State controlled toad and for
— n -
the application triggers referral to the Department 1] (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency. . _
In certain circumstances DMR wil! be an advice U (b) reconfiguring a lot unless . .
agency, while in other circumstances DMR wil « the total number of lots is not increased; and
be a concurrence agency. e the total number of lots abutting the State-controlled road is not increased:
ae? cf Me nine mest you b C (c) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}-
e associated with access to a State-controlled road; or
« for filling or excavation; or
e involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(_] (ii) development on land not contiguous to a State-controlled road and -
(J (a) material change of use -
« assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(_] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
© ; (1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
e assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the P Regulation and exceeding the thresholds set by
. that schedule.
(iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more Information refer to Guide 12. ‘ma (i) material change of use —
Uni nswered “none of the above" to Q3, . :
. : the applction requtes assessment by the (a) assessable against the planning scheme;
Rea ecto Natural Resources and Wietet (b) ona lot containing -
tan agency other than NRWis the assessment e acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
‘ manager for the application, NRW is a e ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
popcuence agency for the appcation in relation (c) where the existing use of the land is a rural or environmental use; and
Hf you ticked 30) of (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
ete oretin ea etree C (ii) reconfiguring a fot
referral to NRW for assessment regardless of ii i -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
@ the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C1 (iii) operational work -
t
. (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
. scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
, Fom 1
(X] (iv) none of the above.
Strategic port land 4. The application involves:
Toad Pe een Pata wet (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
you ) - the retevan uthority is the
a ent manager forthe application, Act) - complete Part | of Form 7
. Ifyou ticked (i) Queensland Transport is a C (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. TI Act for the strategic port land - complete Part ! of Form 1
D¢] (iii) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlted road; or that is part of a future State-
controlled road.
Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156B56.001.pdfRelated documentPublic source context ↗
07/1181 - MCU - Retail Business Type 2 and Visitor Acommodation Type 4 & Demolition - Robert Selkirk [As Published]Related documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.