Response to Council's Further Advice
LEGEND 0
Fix to top of stake with F42 Fabric to AS 1304 300 X
Unbound pavement material (gravel) to Grading B, Table 9 of QT Specification MRS11.05, Geotextile Fabric M A
shadecloth fastener or
exclude material finer than AS sieve 2.36mm. and F42 tie to steel picket.
Without F42 fabric, 2000 MAX C\C
Disturbed area
NOTES: 50x50 HW stake or steel
Overland Flo picket 1200 MIN long Dir
1. General w 300 etio
no
a. Temporary drainage control. Flow should be diverted around the work site where possible. MIN f flo
NOM
w
150
b. All drainage, erosion and sediment controls to be installed and be operational before commencing Geotextile fabric
up-slope earthworks.
c. All control measures to be inspected at least weekly and after significant runoff producing storms.
d. Control measures may be removed when on-site erosion is controlled and 70% permanent soil coverage
is obtained over all upslope disturbed areas. Posts or steel pickets
e. In areas where runoff turbidity is to be controlled, exposed surfaces to be either mulched, covered with
Crushed or grannular material, driven 600mm into ground
600 MAX
erosion control matting/blanket or turfed if earthworks are expected to be delayed for more than 28 days.
f. Straw bale sediment traps are a secondary option which generally should not be used if other options Grading to Table 4 of QT
are available. Specification MRS11.03.
2. Sediment Fence 100 MIN vertical overlap of fabric
a. Not to be located in areas of concentrated flow.
b. Normally located along the contour with a maximum catchment area of 0.6Ha per 100m length of fence.
c. Woven fabrics are preferred, non-woven fabrics may be used on small work sites, ie: operational period
less than 6 months or on sites where significant sediment runoff is not expected. SILT FENCE Undisturbed area
200
d. Where fences need to be located across the contour the layout shall be an "L" shape to contain sediment. Backfill
e. Fences are required 2m min. from toe of cut or fill batters, where not practical one fence can be at the toe
with a second fence 1m min. away. Fence should not be located parallel with toe if concentration of flow ELEVATION
will occur behind the fence.
3. Temporary Construction entry/Exit Sediment Trap
A
a. Adjacent stormwater runnoff to be diverted away from entry/exit.
Level
b. Wheel - wash or spray unit may be required during wet weather. 1:2 Remove accumulated
1:2
4. Safety issues must be considered at all times, incorporating traffic control devices to the satisfaction of the Engineer/Authority. sediment before depth is h/2. 'A' to be higher than 'B' to
5. All dimensions inmillimetres unless otherwise noted.
Level prevent sediment bypass
Rock apron if ordered
A 1:2 200 NOM
A A
1:2
by the Superintendent
500 NOM B
ELEVATION
Geotextile 1000 MAX h
Silt Fence (Ref. Installation Details)
CHECK DAMS Geotextile, Bidum A34 or similar
FLOW CONTROL SECTION A-A
nt
15 n me
m
ty Alig
MIN per
Pro
NOM
Berm (300mm MIN height)
200
Geotextile fabric,
Bidum U34 or similar. n el
han
3m &c
MIN rb
Runoff from pad Ke ay
dw
directed to sediment trap. roa
r new
g, o
stin
Exi
TYPICAL FABRIC DROP
TEMPORARY CONSTRUCTION ENTRY / EXIT
INLET PROTECTION DETAIL
SEDIMENT TRAP
Copyright: The drawing and engineering content shown in this drawing remains the property of Blackall Range
Consulting Engineer and may not be copied, altered, sections omitted or erased and changes made without the prior
written approval of Blackall Range Consulting Engineer. Acceptance of Blackall Range Consulting Engineer fee proposal
or estimate is deemed sufficient to effectuate an agreement. Non-payment of said fee proposal or estimate and
subsequent use of Blackall Range Consulting Engineer drawings or material is a breach of said agreement and subject
to litigation. ABN 94950162458
Rev. No. Drawn Amendment Details
0
Drawn
CJF
Checked
CJF
Date
Site Classification: NA Blackall Range Email: [email protected]
PO Box 342,TEWANTIN, QLD
Phone: 54457353 CLIENT: PROJECT DETAILS: Sheet No. 05 of 13
Mobile: 0419140465
Soil Classification: CI Consulting Civil, Structural & Geotechnical Engineer
B & M GOULD
Date Issued:
ALLOTMENT RECONFIGURATION CAD File:
Sept 2021
Copyright: The design and engineering content shown on this drawing remains the property
Wind Category: N3 Campbell J Foster LOT 401 & 402 HAY STREET DRAWING NUMBER REV.
of Blackall Range Consulting Engineer and may not be copied, altered, sections omitted
or erased and changed in any way without the prior written approval from Blackall
Range Consulting Engineer. ABN 94950162458
Terrain Category: 2.5 MEIAust (CPEng Civil), RPEQ 7228, NER
TEWANTIN 2021-1087-05 2