Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (50.2 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
c.r., CardnD~
Table 3-1 Compliance assessment of the proposed development with the MCU Policy
Performance Requirement Compliance Assessment
PR F1 -
To regulate the clearing of vegetation in a way Complies with PR F1
that ensures the conservation of regional ecosystems, The proposed development layout has been configured so as to mini mise potential impacts to
clearing as a result of the MCU only occurs where the ecological values of the site. In particular, development is proposed within the already-cleared portions
applicant has demonstrated that the development has of the site, and the proposed layout provides for the retention of corridors of wildlife habitat that will
first avoided and minimised the impacts of the facilitate the movement of native wildlife species within and through the site. Over 72% of the Noosa
development. on Weyba site would be specifically preserved and managed to conserve and re-establish regional
ecosystems.
PR F2 -
Clearing as a result of the MCU assessed under Complies with PR F2
this Table may occur only where the MCU can
As detailed in Section 2.1 and 2.2 herein, the Noosa on Weyba proposal will provide substantial
demonstrate that the level of conservation and
conservation and biodiversity benefits. Substantial rehabilitation works are proposed within the site
biodiversity outcomes ensured by the development and the level of conservation and biodiversity outcomes ensured by the development significantly
significantly exceeds the extent and value of the area exceeds the extent and value of the proposed clearing area. Specifically, the clearance of assessable
proposed to be cleared. This can only be achieved by vegetation is limited to the selective clearance of woody vegetation within a mapped area of RE 12.5.3
meeting the requirements of the Policy for Vegetation that is -
0.05 ha in extent, while -6.29 ha of the site will be rehabilitated establish a vegetation
Management Offsets. community with the composition and structure of RE 12.5.3.
The proposed offset measures will be undertaken in accordance with the Policy for Vegetation
Management Offsets. Specifically, the offset will be:
> land-based and within an area that is not mapped as remnant vegetation;
> the same RE type as that proposed for clearance;
> of ecological equivalence;
>
legally secured (as per the BDOA Agreement); and
> implemented in accordance with an Offset Area Management Plan.
PR F3 -
Clearing as a result of the MCU assessed under Complies with PR F3
this Table may occur only where the MCU meets:
Compliance with Performance Requirements 2 to 10 of the RVM Code, Part P is achieved by the
a) Performance Requirements 2 to 10 of the proposed development, as demonstrated in Table 3-2 below.
relevant code, Part Xb for an extractive
purpose; or
b) Performance Requirements 2 to 10 of the
relevant code, Part P for all other purposes.
Northbrook Corporation Pty Ltd Version 2 30 November 2012
5101-19 PVMP v2.docx Commercial in Confidence Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 50.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.