Skip to the record
Accept no imitations.

Council archive · source document

Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208

of 49

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (50.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa on Weyba
Property Vegetation Management Plan
                                                                                                                                                                     c.r., CardnD~

   Performance requirement                      Acceptable solution                                                 Compliance Assessment

   biodiversity and maintains ecological        a) in any watercourse; and                                          this waterway by Hollett Road. Therefore, as the vegetation clearing is
                                                                                                                                                                            st
                     assessable vegetation                                                                          located more than 10m from the high bank of the 1            order watercourse,
   processes     -




                                                b) within 50 metres from each high bank of each                     the   proposed   development       achieves
                                                                                                                                                              compliance with PR P.3.
   associated with any watercourse is
                                                        watercourse with a stream order 5 or greater; and           Furthermore, detailed impact mitigation measures and management
   protected to maintain     -




                                                                                                                    strategies will be included within a site-specific CEMP that will be
                                                c) within 25 metres from each high bank of each
   a) bank stability by protecting against                                                                          implemented within the site so as to ensure that waterways are not
                                                        watercourse with a stream order 3 or 4; and
        bank erosion; and                                                                                           adversely affected by the proposed development.
                                                d) within 10 metres from each high bank of each
   b)   water quality by filtering sediments,
                                                        watercourse with a stream order 1 or 2.
        nutrients and other pollutants;
                                                AND
   c) aquatic habitat; and

   d) terrestrial habitat.                      P.3.2                                                               AS P.3.2 is not    applicable as the proposed development is              not   a

                                                Where clearing is for a significant community project,              significant community project.
                                                maintain the current extent of assessable vegetation
                                                associated with any watercourse to provide-

                                                        a)   bank stability by protecting against bank erosion;
                                                             and


                                                        b)   water quality by filtering sediments, nutrients
                                                             and other pollutants; and


                                                        c) aquatic habitat; and

                                                        d)   terrestrial habitat.


   PR P.4: Connectivity                         AS P.4
                                                                                                                    Complies with PR P.4
                                                P.4.1                                                               The
   To regulate the clearing of vegetation in                                                                              proposed development would require clearance of -0.05 ha of
                                                                                                                    remnant vegetation and the width of the proposed clearance is       -
                                                                                                                                                                                            15m.
   a way that does not cause land               Where clearing is less than-
                                                                                                                    The proposed clearance is located:
   degradation, prevents the loss of
                                                  a) 10 metres wide; or                                             a)    within  a  mapped polygon of            remnant   RE12.5.3     which      is
   biodiversity and maintains ecological
                                                                                                                          approximately 100 m in width; and
   processes     -
                     areas of remnant             b) 2 hectares;
   vegetation are retained that are     -




                                                                                                                    b)    immediately to the west of a mapped polygon of RE12.3.5/RE12.3.4
                                                clearing does not-
                                                                                                                          that is:
    a) of sufficient size and configured in a
                                                   i.    reduce the width of remnant vegetation to less than
        way to maintain ecosystem                                                                                           >
                                                                                                                                   contiguous with the areas of remnant vegetation within which
                                                         200 metres; and
        functioning; and                                                                                                           clearance is proposed;
                                                  ii.    occur where the width      of remnant vegetation is less
    b) of sufficient size and configured in a
                                                         than 200 metres;


Northbrook Corporation Pty Ltd                                                               Version 2                                                                      30 November 2012
5101-19 PVMP v2.docx                                                                 Commercial in Confidence                                                                          Page 11

Used in these records

About this file

File size
50.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12_0208.pdf · 50.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.