Council archive · source document
Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (50.2 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
c.r., CardnD~
Performance requirement Acceptable solution Compliance Assessment
biodiversity and maintains ecological a) in any watercourse; and this waterway by Hollett Road. Therefore, as the vegetation clearing is
st
assessable vegetation located more than 10m from the high bank of the 1 order watercourse,
processes -
b) within 50 metres from each high bank of each the proposed development achieves
compliance with PR P.3.
associated with any watercourse is
watercourse with a stream order 5 or greater; and Furthermore, detailed impact mitigation measures and management
protected to maintain -
strategies will be included within a site-specific CEMP that will be
c) within 25 metres from each high bank of each
a) bank stability by protecting against implemented within the site so as to ensure that waterways are not
watercourse with a stream order 3 or 4; and
bank erosion; and adversely affected by the proposed development.
d) within 10 metres from each high bank of each
b) water quality by filtering sediments,
watercourse with a stream order 1 or 2.
nutrients and other pollutants;
AND
c) aquatic habitat; and
d) terrestrial habitat. P.3.2 AS P.3.2 is not applicable as the proposed development is not a
Where clearing is for a significant community project, significant community project.
maintain the current extent of assessable vegetation
associated with any watercourse to provide-
a) bank stability by protecting against bank erosion;
and
b) water quality by filtering sediments, nutrients
and other pollutants; and
c) aquatic habitat; and
d) terrestrial habitat.
PR P.4: Connectivity AS P.4
Complies with PR P.4
P.4.1 The
To regulate the clearing of vegetation in proposed development would require clearance of -0.05 ha of
remnant vegetation and the width of the proposed clearance is -
15m.
a way that does not cause land Where clearing is less than-
The proposed clearance is located:
degradation, prevents the loss of
a) 10 metres wide; or a) within a mapped polygon of remnant RE12.5.3 which is
biodiversity and maintains ecological
approximately 100 m in width; and
processes -
areas of remnant b) 2 hectares;
vegetation are retained that are -
b) immediately to the west of a mapped polygon of RE12.3.5/RE12.3.4
clearing does not-
that is:
a) of sufficient size and configured in a
i. reduce the width of remnant vegetation to less than
way to maintain ecosystem >
contiguous with the areas of remnant vegetation within which
200 metres; and
functioning; and clearance is proposed;
ii. occur where the width of remnant vegetation is less
b) of sufficient size and configured in a
than 200 metres;
Northbrook Corporation Pty Ltd Version 2 30 November 2012
5101-19 PVMP v2.docx Commercial in Confidence Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 50.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.