Council archive · source document
Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (50.2 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
c.r., CardnD~
Performance requirement Acceptable solution Compliance Assessment
P.4.3 AS P.4.3 is not applicable as the proposed development is not a
significant community project.
Where clearing is for a significant community project,
maintain the current extent of mapped remnant
vegetation where the vegetation is-
a) of sufficient size and configured in a way to
maintain ecosystem functioning; and
b) of sufficient size and configured in a way to
remain in the landscape in spite of any
threatening processes; and
c) located on the lot(s) that are the subject of the
application to maintain connectivity to mapped
remnant vegetation on adjacent properties.
PR P.5: Soil erosion AS P.5
Complies with PR P.5
The proposed development would require mechanical clearance of
To regulate the clearing of vegetation in P.5.1
remnant vegetation on land that is characterised by slopes of
a way that does not cause land
Mechanical clearing only occurs on- approximately 5% and as such would comply with AS P.5.1.
degradation and maintains ecological
processes -
the effect of clearing does a) very stable soils on a slope less than 30%; and
not result in-
b) stable soils on a slope less than 20%; and
a) mass movement, gully erosion, rill
c) unstable soils on a slope less than 15%; and
erosion, sheet erosion, tunnel
erosion, stream bank erosion, wind d) very unstable soils on a slope less than 10%.
erosion or scalding; and
b) any associated loss of chemical,
physical or biological fertility-
including, but not limited to water
holding capacity, soil structure,
organic matter, soil biology and
nutrients, within and/or outside the
lot(s)that are the su bject of the
application.
Northbrook Corporation Pty Ltd Version 2 30 November 2012
5101-19 PVMP v2.docx Commercial in Confidence Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 13 of 37 Appendix 11 - Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 50.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.