Council archive · source document
07/2482 - Additional Plans [As Published] · 132007.2482
Plans and drawings: the text below has words only, no drawings.
Chief Executive Officer,
Noosa Shire Council
PO Box 141
Tewantin
QLD 4565
Andrew Gaffney Town Planning Services
PO Box 910, New Farm 4005
SE
ion a a
@ [email protected]
Att: Denis Wallace - Town planner, Development Assessment
Dear Denis
Subject:
Project:
use
5 Solway Dr, Sunshine Beach
MCU Development Application for a multiple dwelling (type four)
We refer the above site and development application lodged with Council on
the 29th of November 2007.
As stated within the application please find attached six copies of the proposal
plans which form part of the development application.
If you have any questions in relation to the attached documentation please do
not hesitate to contact the writer on 0417 17) 222.
Yours faithfully,
An
Ww faftiney.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
EXISTING SOLWAY DRIVE SITE PLAN/ GROUND FLOOR PLAN +200 era approx 2\4 m” 2640 8460 This drawing Is for design only. Contractors to verify all dimensions on the job before commencing any work or shop Grawings. All works shall comply with relevant local health & council requfrements, local bullding regulations and relevant BCA codes and standards. ‘ NOTES 4 Confem all dimensions and levels on site before commencing work 2 Figured dimensions shall take precedence over scaled dimensions AMENDMENTS REV _ DATE OESCRIFTION by —T T T PROJECT PROPOSED. EXTENSIOM To EXISTING MULTIPLE DAYELLING AT & SOLWAN PRVE SUNSHINE BEACH FOR. STUART ALBRECHT ORAWING TITLE BITE PLAN /GROUND FIcoR DRAWN CHECKED BN SCALE DATE 200 SEPT OTF 0 we ee _ eee FILE . PROJECT DRAWING NO Rev
Page 3
A ~~
DS ~~ ; — “
fo Nts { > t
Pam/ DINE +
~ AT er
‘ DEG ~ | | 8
nr) Ea ‘
2900 {a o t
ae O-.
} . L
vee er .
This drawing |s for design only. Contractors to varity all
dimensions on the job before commencing ary work or shop
drawings. All works shall comply with relevant local health &
coune!| requirements, lacal building regulations and relevant
BCA codes and standards. so:
NOTES
t Confirm alt dimensions end levels on site before commencing work
2 Figured dimensions ehat! take precedence over scaled dimensions
AMENDMENTS
REV DATE DESCRIPTION . BY
T T T
PROPOSED SOLWAY DRIVE
UPPER LEVEL 1 PLAN ereccppron \4E m2
PROJECT
PROPOSED EXTENSION
To EXISTING MULTIPLE
PWELLING
AT & SOLWAY DRIVE
SUNSHING BEACH
FOR. STUART SLGRECHT
ORAWING TITLE
UPPER Levet4 PLAN
ORAWN CHECKED
1.200 SEPTOT
a
Rv
FILE - PROJECT DRAVANG NO
Page 4
Ma
w upper level,
This drawing Is for design only. Contractors to verify all
dimensions on the job before commencing any work or shop
drawings. All works shall comply with relevant local health &
council requirements, local building regulations and relevant
BCA codes and standards.
NORTH ELEVATION- Solway Drive
isting carport,
“ % | NOTES
1 Confirm ail dimensions and levels on sits before commencing work
i 2 Figured dimensions shall take precedence over scaled dimensions
balustrades | AMENDMENTS
= |-souma oe. REV __OATE __ DESCRIPTION oY
CARPORT t
EAST ELEVATION
new upper floor LeveL,
SOLWAY DR. |
ish loor buildin
seiston around reanenng
WEST ELEVATION
PROJECT
“I PROPOSED EXTENSION
I EXISTING MULTIPLE
~ DWELUAIA
. AT 5 SOLWAY PRIVE
SUNSHINE PEACH
FOR STUART ALBRECHT
DRAWING TITLE = *
ELEVATIONS
ORAWN CHECKED
SCALE DATE
— ee
FILE - PROJECT DRAWING NO : REV
Used in these records
07/2482 - Additional Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 208 KB (small file)
- File type
No other editions are linked here.