Council archive · source document
07/2482 - Additional Plans [As Published] · 132007.2482
Plans and drawings: the text below has words only, no drawings.
Ma
w upper level,
This drawing Is for design only. Contractors to verify all
dimensions on the job before commencing any work or shop
drawings. All works shall comply with relevant local health &
council requirements, local building regulations and relevant
BCA codes and standards.
NORTH ELEVATION- Solway Drive
isting carport,
“ % | NOTES
1 Confirm ail dimensions and levels on sits before commencing work
i 2 Figured dimensions shall take precedence over scaled dimensions
balustrades | AMENDMENTS
= |-souma oe. REV __OATE __ DESCRIPTION oY
CARPORT t
EAST ELEVATION
new upper floor LeveL,
SOLWAY DR. |
ish loor buildin
seiston around reanenng
WEST ELEVATION
PROJECT
“I PROPOSED EXTENSION
I EXISTING MULTIPLE
~ DWELUAIA
. AT 5 SOLWAY PRIVE
SUNSHINE PEACH
FOR STUART ALBRECHT
DRAWING TITLE = *
ELEVATIONS
ORAWN CHECKED
SCALE DATE
— ee
FILE - PROJECT DRAWING NO : REV
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2482 - Additional Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 208 KB (small file)
- File type
No other editions are linked here.