Attachment 4 - Treee Management Plan_V1
Plans and drawings: the text below has words only, no drawings.
8 T REE P ROTECTION G UIDELINES (TPG) For the proposed retention of the above trees onsite, the following guidelines are recommended to be implemented to minimise the impact of the Project works. The protection recommendations offered will be guided by, AS4790 – 2009 Protection of trees on development sites, industry best practice and the supervising presence of a suitably qualified and experienced Arborist with a high level of experience as an onsite Project Arborist. The information within these Guidelines is generic and can be used within the project as required. The successful retention of the trees will be bettered by the education and cooperation of all parties of the construction team during the build and the presence of the Project Arborist on site to assist and advise during the construction phase for all works carried out adjacent to the TPZ of protected trees. ALL workers on the site are to be made aware of the Tree Protection Guidelines and any site- specific measures by the main contractor prior to commencing works. An Arboricultural Assessment was undertaken by the Project Arborist for the trees that require consideration. The information within this Tree Management Plan (TMP) should be read in conjunction with guidelines laid out in the Australian Standard, AS4970–2009 Protection of Trees on Development Sites and ongoing advice from the Project Arborist. A designated onsite foreman/supervisor from the construction company is to liaise with the Project Arborist to ensure that Tree Protection is adhered to in their absence from the site. A Post Construction Arborist Report can be prepared by the Project Arborist on request for the retained tree comprising a Visual Tree Assessment detailing each of the trees’ condition and vigour, damage or disturbance which may have occurred, and remedial works are undertaken. After the final inspection, a Certification of Compliance can be supplied along with any monitoring documentation as required. The Project Arborist may at any time implement new or additional procedures as may be required for the site in the best interest of the trees and the development as a whole. 24_07_16_TMP_Woollam_Ozcare_V1 Page 20 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.