Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment 4 - Treee Management Plan_V1

of 29

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
5 S ITE P LANS




   Figure 4: Services plan provided by Woollam illustrating the locations for the Fire Water Tanks next to the
               Cooyar Street entrance and the new and ungraded Switch Board, and Generator.
                             The internal site services alignment is to be confirmed




     Figure 5: STP Earthworks/track Layout plan to provide a project overview, with the Pink shaded area
                                 illustrating the Firebreak and Access Track.




24_07_16_TMP_Woollam_Ozcare_V1                                                                       Page 8 of 29
Log in to download the original file

Attachment 4 - Treee Management Plan_V1.pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.