Attachment 4 - Treee Management Plan_V1
Plans and drawings: the text below has words only, no drawings.
5 S ITE P LANS
Figure 4: Services plan provided by Woollam illustrating the locations for the Fire Water Tanks next to the
Cooyar Street entrance and the new and ungraded Switch Board, and Generator.
The internal site services alignment is to be confirmed
Figure 5: STP Earthworks/track Layout plan to provide a project overview, with the Pink shaded area
illustrating the Firebreak and Access Track.
24_07_16_TMP_Woollam_Ozcare_V1 Page 8 of 29