Original source · versioned page text
2002-15677 SRA RA6-N Response with conditions
Attached to the e-mail SARA response with conditions - MCU20/0012.
2002-15677 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application)
No. Conditions Condition timing
Development Permit for Material change of use for Transport – Type 2 Car park
Schedule 10, Part 9, Division 4, Subdivision 2, Table 4, Item 1 – Development within 25m of a state
transport corridor (railway corridor)—The chief executive administering the Planning Act 2016
nominates the Director-General of the Department of Transport and Main Roads to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following condition:
1. (a) Stormwater management of the development must ensure no (a) At all times.
worsening or actionable nuisance to the railway corridor.
(b) At all times
(b) Any works on the land must not:
i. interfere with or impede overland flow paths and
hydraulic conveyance on the site;
ii. reduce the floodplain storage capacity of the site;
iii. interfere with and/or cause damage to the existing
stormwater drainage on the railway corridor.
Department of State Development, Manufacturing, Infrastructure and Planning Page 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2002-15677 SRA RA6-N Response with conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.