Original source · versioned page text
2002-15677 SRA RA6-N Response with conditions
Attached to the e-mail SARA response with conditions - MCU20/0012.
2002-15677 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for the department’s decision are:
The development complies with State code 2. Specifically, the development:
does not create a safety hazard for users of a railway
does not compromise the structural integrity of railways, rail transport infrastructure, other rail
infrastructure or railway works
does not result in a worsening of the physical condition or operating performance of railways and the
rail network
does not compromise the state’s ability to construct, or significantly increase the cost to construct
railways and future railways
does not compromise the state’s ability to maintain and operate, or significantly increase the cost to
maintain and operate railways
Material used in the assessment of the application:
The development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
The State Development Assessment Provisions (version 2.6, as published by the department
The Development Assessment Rules
SARA DA Mapping system
Department of State Development, Manufacturing, Infrastructure and Planning Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2002-15677 SRA RA6-N Response with conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.