Council archive · source document
App G - Code Tables · 132008.299.02
Noosa Plan 2020: Amendment 2
Part 9 Development codes \ 9.4 Works Codes \ 9.4.6 Sustainable Building Design
Code
Table 9.4.6.3 Criteria for assessable development
Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes Comments
Energy efficiency
PO1 No acceptable outcome provided Complies
Development minimises energy consumption and the
production of greenhouse gas emissions.
Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes Comments
Water efficiency and stormwater management
PO2 AO2.1 Complies
Development maximises water efficiency on site by If for accommodation activities, a minimum 3,000 litres Water harvesting will be contained in the Stormwater
incorporating rainwater collection and reuse measures of rain water storage is provided per dwelling and Management Plan as part of the OPW application
for non-potable purposes such as irrigation. reused for non-potable purposes and incorporated into and will be reused for garden purposes.
a stormwater management plan for the development.
AO2.2 Turfgrid permeable pavers are proposed to be used
With the exception of accommodation activities, rain for the portion of the driveway within the site.
water storage sufficient for the intended use is
captured and used on-site for non-potable purposes
and incorporated into a stormwater management plan
for the development.
Editor’s note—The Queensland Development Code
includes provisions for the installation of rain water tanks and
the reuse of stormwater.
PO3 AO3.1
Print Date: 17/10/2025 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App G - Code Tables.pdfRelated documentApplication case desk ↗
About this file
- File size
- 918 KB (small file)
- File type
No other editions are linked here.