Council archive · source document
Referenced Documents - MCU13 0098.01 · MCU13/0098.01
1 x WAT flo
2 x SYZ res
2 x CAL end
1 x WAT flo 3 x Waterhousia floribunda
4 x SYZ res 10 x Syzygium 'Resilience'
4 x SYZ res 1 x WAT flo 16 x Lomandra hystrix
1 x WAT flo 4 x SYZ res
278° 50' 50"
3 x Callistemon Ned Kelly
74.437 m
34 x TRA jas
BAGGING MALE FEM DIS
2 x Syzygium 'Cascade'
3 x SYZ res 2 x Callistemon Ned Kelly
3 x Syzygium 'Resilience'
16 x Lomandra hystrix
1 x WAT flo 2 x Callistemon Ned Kelly
FLOUR, NUTS & SEEDS
1 x Waterhousia floribunda
3 x SYZ res 5 x Syzygium 'Resilience'
24 x Lomandra hystrix
2 x Callistemon Little John
4 x Lomandra hystrix 3 x Syzygium 'Resilience'
1 x WAT flo 3 x Callistemon Ned Kelly 2 x Callistemon Ned Kelly
3 x Syzygium 'Cascade' 1 x Waterhousia floribunda
3 x SYZ res
7 x Callistemon Little John
COLD ROOM
188° 50' 50"
53.607 m
1 x WAT flo
4 x SYZ res
SALES OFFICE
1 x WAT flo
4 x Callistemon Little John
3 x SYZ res 2 x Syzygium 'Resilience'
2 x Waterhousia floribunda
11 x Lomandra hystrix
FREEZER 4 x Callistemon Little John
1 x WAT flo 5 x Callistemon Ned Kelly
20 x Lomandra hystrix
3 x SYZ res
NORTH 1 x WAT flo
3 x SYZ res
1 x WAT flo 3 x WAT flo
4 x SYZ res 3 x CAL lit
1 x WAT flo 16 x SYZ res 4 x Callistemon Ned Kelly
4 x SYZ res 6 x Syzygium 'Cascade' 2 x Waterhousia floribunda
1 x WAT flo 1 x BUC cel 8 x Lomandra hystrix
1 x SYZ res 2 x Callistemon Little John
DRAWN R. Leathers TITLE/DWG NO.
Greenscapes Nursery & Design Markris Foods
Dip. Hort.
Landscape Design 2
468 McKinnon Dve, Cooroibah. Qld.4565.
Ph: 07 54556825 e: [email protected] Lot 3 Rene St, Noosaville. Qld.
DATE 12/09/ 2013.
Planting Layout
A3
SCALE1:300 @ A3
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
Proposed Plants
abbreviation botanical name common name container size Qty
CAL ned Callistemon Ned Kelly Bottle brush 200mm 21
Grass
LOM hys Lomandra hystrix Matt rush 140mm 115
Ground cover
TRA jas Trachelospermum jasminoides Star Jasmine 140mm 34
Shrub
CAL lit Callistemon Little John Bottle brush 200mm 21
SYZ Cas Syzygium 'Cascade' Weeping lillypilly 300mm 11
CAL end Callistemon Endeavour Bottle brush 200mm
SYZ res Syzygium 'Resilience' Resilience Lilly pilly 200mm 76
Tree
BUC cel Buckinghamia celsissima Ivory curl 300mm 1
WAT flo Waterhousia floribunda Weeping lillypilly 300mm 23
DRAWN R. Leathers TITLE/DWG NO.
Greenscapes Nursery & Design Markris Foods Dip. Hort. Landscaping Design 2
468 McKinnon Dve, Cooroibah. Qld.4565.
Ph: 07 54556825 e: [email protected] Lot 3 Rene St, Noosaville. Qld.
DATE 12/09/ 2013.
Plant Schedule
A3
SCALE
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 3
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
[OCR of page images]
ADJACENT INDUSTRIAL ESTATE
rFOR DETAILS OF ROOF DRAINAGE REFER TO HYDRAULIC CONSULTANTS DRAWINGS
COMBINED
—»_
HARVESTING/RETENTION \,
TANK, TYPE AB
GROUND.
TOTAL VOLUME
22,500LITRE
DISCHARGE MIN
80% ROOF CATCHMENT
AREA TO TANK.
N
BIO_RETE!
SYSTEM FOR.
ROOF CATCHMENT
MIN AREA 45sqm >
#300 SH
BRS FOR
ONLY
BRS
OVE
A FT
|
IMUM OF
a
oe
NTION 4
iO}
iO}
WO}
~
Wa
OWN BESIDE——_1-|
CLARITY
3/1
\
\
SS PROPOSED NEW WAREHOUSE BUILDING
\
~ 13700 | | O )
me
S S
Rs oN
S
-& FFL5.400 | ™- FFLS5.400 [email protected]
¥ P
xe .
5 aN
-& FFL5.200 FFL5.200 3
S x N
~ n N,
me Nee ; ow
/ S/o. ~- | CARPARKING
\
l
1L3.510 |
\ —
. CARPARKING
~ LOT 3 PROPERTY CONNECTION TOV
9375; 5.9m @ 1% 7450)
- USIL3.470
— DSIL3.410 ——_
~ 225 BIO RETENTION BIO RETENTION
4/75 1L3.510 L1L3.600 SYSTEM FOR SOUTH SYSTEM FOR
: CARPARK NORTH CARPARK
~ 5 CATCHMENT. CATCHMENT.
~ SO RMWATER MIN AREA 11sqm MIN AREA 15sqm
~ MANHOLE 1/1:
~~ SL4.870 INTERNAL ACCESS ROAD (ROW)
ee 1L3.555
a= — gg AIR a
SITE ACCESS
/ \
Z
- S Fo FR FE ET
FLOW (LITRES/SEC.)
60
——— NO RETENTION
50:
~ WITH RETENTION
40: S
30. Zz
7 ~N
20 —___
to —_—_ —<—
oe ~
0 ! T I
2 4 6 8 10 12 14 16 18
TIME. (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING: 10,500 LITRE
TANK FOR RETENTION: 12,000 LITRE
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT: Q100
TIME OF CONCENTRATION: 5Smin
INTENSITY: 326mm/hr
SITE AREA: 3266sqm
IMPERVIOUS AREA: 2744sqm
PRE DEVELOPMENT PEAK RUNOFF: 260L/s
PEAK RUNOFF POST DEVELOPMENT: 290L/s (NO RETENTION)
RETENTION VOLUME REQUIRED: 11,900 LITRE
RETENTION VOLUME PROVIDED: 12,000 LITRE
REDUCTION REQUIRED: 29.8L/s
REDUCTION PROVIDED: 33.9L/s
FROM ROOF
HI-FLOW #300
L
i
G
COMBINED 4
HARVESTING/MITIGATION wo
TANK o
TOTAL VOLUME:
22,500 LITRE
50% HARVESTING
oe oA K 990 LO—FLOW SLOW
GS | LEAK TO BIO
w RETENTION SYSTEM
9
°
GROUND
~ N NX N N HR N N N N NX NX NYO N\ NX ~
3
RAINWATER HARVESTING AND
MITIGATION TANK ASSEMBLEY
TO LAWFUL POINT OF DISCHARGE
SCALE: NTS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
Amd Description Date
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic 3:
\-
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
MARKRIS FOODS
ARCHITECT :
iS SOUL SPACE
42 HOFFMAN DRIVE
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
A
(PROJECT:
STORMWATER
DRAINAGE
AND QUANTITY
Design Ae. Checked (Ch Dote 11-07-13 Dwg. No. AMD.
SCALE: 1: 200 2783-2 J
RPD:- LOT 3 / FMR LOT 2 SP 222982
ON A1 UNO. 2 Of 4
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 4
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
[OCR of page images]
N SITE, ABOVE GROUND COMBINED
HARVESTING/RETENTION TANK WITH TOTAL
VOLUME OF 22,500 LITRES. _
12,000 LITRE FOR RETENTION S00 HI FLOW BYPASS
2000 10,500 LITRE FOR HARVESTING LOCATED UNDER BIO
, RETENTION SYSTEM AND
#300 HI-FLOW BYPASS BRS (NOT CONNECTED TO SYSTEM =
SHOWN FOR CLARITY) BYPASS CHAMBER AT a
#90 LO-FLOW CHARGE ON TOP OF BRS INVERT. 4
90 LOW-FLOW MITIGATION & 00sq OVERFLOW AND HIGH
DRAIN DISCHARGE TO TOP 5 FLOW BYPASS CHAMBER,
tet ON SITE, ABOVE GROUND COMBINED —~ | 12,000 LITRE Coin APPROVED FLAP # ee ES AND TINGED
HARVESTING/RETENTION TANK WITH TOTAL RETENTION VOLUME VALVE. CHARGE ON TOP OF a ELEVATED GRATE.
VOLUME OF 22,500 LITRES. | ~e GRAVEL MATTRESS FOR a
12,000 LITRE FOR RETENTION ——— Ww
SCOUR PROTECTION.
10,500 LITRE FOR HARVESTING zZ
%300 HI-FLOW BYPASS BRS E
o —FLOW CHARGE ON TOP OF BR 10,500 LITRE a5
90 LO-FLOW CHARGE ON TOP OF BRS HARVESTING VOLUME S
wo
TYPICAL: 5.250N 5.300
9100 SLOTTED PVC WITH &
CLEANOUT TO SURFACE
USING SCREW CAP.
4.400 4.300
_ | e 4.100
600 FILTRATION LAYER:
3.700
100 TRANSITION LAYER.
200 DRAINAGE LAYER
300 TO LAWFUL POINT OF
DISCHARGE
BIO RETENTION SYSTEM BRS 3/1
LONG SECTION
SECTION
SCALE 1 20
BIO_RETENTION SYSTEM _A_NOTES
CATCHMENT: ROOF 1800m?
¢ FILTER MEDIUM AREA: 45m?
* FORE BAY AREA: 1.5m?
* PROVIDE 100 SUBSOIL DRAINAGE WITH
CLEAN OUT POINTS AS INDICATED ON
PLAN.
Oo
Oo
Q 5.300
SN
N 000
ILTER MEDIUM SURFACE AREA WITH DENSE THE ENTIRE BRS TO BE. ——*"
PLANTING. FOR DETAILS OF SELECTED PLANTS SUCH WRAPPED IN GEO TEXTILE
AS GRASSES, SHRUBS AND SELECTED TREES REFER 4.300
TO LANDSCAPE ARCHITECTS PLANS. 600 FILTRATION LAYER:
ee. D SL3.500 c CHITEC 4.100 DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
, 100 TRANSITION LAYER FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
200 DRAINAGE LAYER O aS (amd Description Date
%300 TO saawsrer Bens
CHAMBER
BIO RETENTION SYSTEM BRS 3/1
CROSS SECTION
250 WIDE BATTER SURROUNDING BIO RETENTION SYSTEM.
ee BATTER SHALL BE PROVIDED WITH ROCKS AND DENSE SECTION
e PLANTING. FOR SELECTION OF PLANTS SUCH AS A
MIXTURE OF GRASS, SHRUBS AND SELECTED TREES REFER SCALE 1: 20
TO LANDSCAPE ARCHITECTS PLANS. :
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
NOTE: For Tender
: For Construction
IDENTICAL CONSTRUCTION PRINCIPLES Me Conctractea
E Hydraulic 3:
I
4 . .
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333. FX: (07) 5491 4233
CLIENT :
00sq HI-FLOW BYPASS AND MARKRIS FOODS
TRANSFER CHAMBER, CONCRETE WITH
ELEVATED GRATE AND WEIR AT ARCHITECT :
SLS.250 SOUL SPACE
yy J
(PRovect: 42 HOFFMAN DRIVE Y
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
300 SYSTEM OUTFLOW
DIRECTED TO LAWFUL STORMWATER
POINT OF DISCHARGE
QUALITY
DETAILS
=|>
Design Ae. Checked (Ch Dote 11-07-13 Dwg. No. AMD,
SCALE: 1 : 50 ON At UNO, 3 Of 4 2783-3
BIO RETENTION SYSTEM BRS 3/1 BIO RETENTION SYSTEM BRS 3/1 A
SUBDRAINAGE_LAYOUT PLAN VIEW RPD:— LOT 3 / FMR LOT 2 SP 222982
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 5
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
[OCR of page images]
OPERATIONAL PHASE:
RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:
PHASE OF ESTABLISHMENT:
The first 2 Years after construction are crucial for the performance of the VBFS.
“Ensure the right plant selection (refer "Healthy Waterways" for plant selection)
**During dry periods provide sufficient watering
****Perform regular weed removal
****Replace not established plants where required
Perform routine inspections of the raingarden (VBFS) to identify any areas of obvious increased sediment deposition, scouring from
storm flows, rill erosion of the batters from lateral inflows and clogging
Perform routine inspections of the inflow systems in particular the grated drain and clean the grated drain regular from debris and litter
Perform routine inspections of the surface of the raingarden and clean from litter and gross pollutants
Remove sediment build ups in the raingarden
Repair any damage from vehicle traffic
Provide regular irrigation/watering during extended dry periods
Remove any invasive weeds at any time
Remove plants that have died and replace them
Perform regular pruning as to Landscape Architects schedule to encourage growth and healthy establishment of plants
Perform vegetation pest minotoring and control as to Landscape Architects schedule
RECOMMENDATION:
THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO A NORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.
WIDTH AS SPECIFIED IN PLAN
VEGETATED BIO RETENTION SYSTEM LENGTH AS SPECIFIED IN PLAN
Use for mulching: LUCERN, WOODCHIP OR EQUIVALENT.
WIDTH AS SPECIFIED IN PLAN
SPECIFICATIONS
NOTES:
PSP ei oT
FILTER LAYER: i
Clay 2-4% (<0.002mm) [J
silt 4-8% (0.002-0.05mm) [[||
Very Fine Sand 5-10%(0.05-0.15mm) U
Fine Sand 10-25% (0.15-0.25mm)
Med./Coarse Sand 60-70% (0.25-1.0mm) Ly
OULU I Coarse Sand 7-10%(1.0-2.0mm) HI
{TRANSITION LAYER:
| Coarse Sand 100% 0.5-2 mm
DRAINAGE LAYER:
oO CO Fine Gravel 100% 2-5 mm
Provide PVC perforated pipe with
diameter as specified in plan.
Minimum 2 off.
Provide base grade at 0.5
'% (1:200)
drainage.
Connect subsoil
drainage to stormwater
infrastructure as
specified in plan.
VEGETATED BIO FILTER STRIP SOIL SPECIFICATION
(NOT TO SCALE)
NOTES:
1.
2. Provide "FOREBAY’ made of rocks and pebbles. For
Provide selected plants as to specification of
"Healthy Waterways” http://www.healthywaterways.org/
scour protection. Refer detailed design for area.
MAINTENANCE PLAN
The maintenance of the bioretention basin elements involve:
WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
QUEENSLAND (Chapter 5, Item 5.6).
Routine inspection of the bioretention basin profile to identify any areas of obvious increased sediment
deposition, scouring from storm flows, rill erosion of the batters from lateral inflows, damage to the profile
from vehicles and clogging of the bioretention basin (evident of "boggy" filter media surface).
Routine inspection of inflows systems, overflow pits and under-drains to identify and clean any areas of
scour, litter build up and blockages.
Removal of sediment where it is smothering the bioretention basin vegetation.
Where a sediment forebay is adopted, removal of accumulated sediment.
Repairing any damage to the profile resulting from scour, rill erosions or vehicle damage by replacement of
appropriate fill (to match onsite soils) and revegetating.
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
Removal and management of invasive weeds (herbicides should not be used).
Removal of plants that have died and replacement with plants of equivilant size and species as detailed in
the plant schedule.
Pruning to remove dead or diseased vegetation material and to stimulate growth.
Vegetation pest monitoring and control.
Refer "Water by design" by HEALTHY WATERWAYS.
HARVESTING
&
RETENTION
2 . TANK
650m q [| LS
ROOF
389m? 5
DRIVEWAY
562m? 5
DRIVEWAY
‘amt
Wt
BIO RETENTION SYSTEM BRS3/1
mA
aa
aA
BIO RETENTION SYSTEM BRS.3/2
ao
WU
BIO RETENTION SYSTEM BRS 3/3
TREATMENT TRAIN
1. Use LUCERN OR EQUIVALENT for mulching
2. Do not use organic Soils or soil fractions
for filter layer.
3. Provide a suitable irragation system required
for the establishment of the plants and for
use in extended dry periods. Irragation
system shall be supplied from the
harvesting tanks.
4. Do not use any geotextile or related
products between filter and transition or
between transition and drainage layers.
5. Geotextiles may be used in addition to the
impermeable concrete & block surrounds.
6. Provide flush out points for subsurface
RECEIVING WATERWAYS
A
500
from carpark
raingarden is a garden bed which
uses native plants and free drainage
soils to treat the pollutants formed in
to raingarden
50
to
to stormwater that runs off the driveway Cc ree k
~ and carpark. Raingardens help to
protect our waterways.
y 0
BIORETENTION FILTER & RAINGARDEN MAINTENANCE CHECKLIST
BODY . .
CORPORATE NAME: DATE:
RESPONSIBILITY CENTRE . .
MANAGEMENT NAME: DATE:
OWNER NAME: DATE:
PROVIDE NAME AND DETAILS OF
MONTHLY (CONSULTANT IF APPOINTED:
INSPECTION QUARTER
FREQUENCY 6—MONTHLY
DROUGHT
AFTER_EVENT
INSPECTION ITEMS YES _|NO ACTION REQUIRED
Overall appearance healthy?
Overall appearance clean?
Gross litter _on surface?
Sediment accumulation at inlet?
Sediment accumulation on pe
bble surface?
Sediment accumulation at pipe outlets?
Sediment accumulation in bypass chamber?
Erosion at forebay?
Erosion at overflow?
Any other erosion?
Damage of support structure?
Any other traffic damage pre:
sent?
Damage to grates and lids?
Visual plant health ok?
Weeds apparent? Weeding required?
Watering required?
Irrigation functional?
Replanting required?
Mowing/slashing/pruning required?
Surface clogging visible?
Excess ponding evident?
Flushing required?
Point of discharge inspected
(pit/headwall/swale/creek)?
OTHER
OBSERVATIONS
SIGNATURE & DATE:
NOTE: A4 COPIES OF THE FORM CAN BE OBTAINED BY CONSTRUCTION HYDRAULIC
rp shr Roof water @
i Dw © ©
Bth
TANK SPECIFICATION IK | | | |
-1—-} saz 4-_] Vo pew 4-- '
TANK SIZE: 10,000 LITRE eng Tt ed foo _ ey.
DESCRIPTION: PRECAST ' LC “I VKNO 4 LEGEND
Be TO 1
i! [- | | “| | | T | SOLENOID SWITCHOVER DEVICE
1
PUMP_ SPECIFICATION i | J | © ¥oev | 2 RARVESTING TAME aE
. | ! y y 4 |REMOTE WATER LEVEL INDICATOR
MODEL ACTURER: TBE mt | | ex | | 5 PRESSURE LIMITING VALVE, 500 kPA MAX,
: || | | | | 1, NO {NO 6 |WATER METER
ty | L Lvl | | 7 | TEMPERING VALVE MAX 50°C
' mee 8 | FILTRATION DEVICE
SWITCHOVER DEVICE SPECIFICAITON lt Heater j a @ | | 9 RAINWATER PUMP
MANUFACTURER: TBC >60'C us NRV —— : NO |NORMALLY OPEN
UFACTURER: @ Kh z . ® NC | NORMALLY CLOSED
MODEL: TBC Hc 2 SI] | Yorvesting | | Vv | BALL VALVE
HWS & | | GV | GATE VALVE
NRV| NON—RETURN. VALVE
RAINWATER FILTRATION SPECIFICATION RW RW DCV| DOUBLE CHECK VALVE
MANUFACTURER: TBC mark "RAIN WATER” NRV GV [sludge zone! |
MODEL: TBC |
1
Stormwater RPB main.
HOT WATER SYSTEM SPECIFICATION System
MANUFACTURER: TBC
MODEL: TBC RAINWATER HARVESTING SCHEMATIC
800
|}~- |
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
Amd
Description Date
For Tender
Issue
For Development Approval X
For Building Approval
Notes Date
11-07-13
For Construction
As Constructed
E Hydraulic ::
\-
CONTACT:
CLIENT :
Ne
(PROJECT:
Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
MARKRIS FOODS
ARCHITECT :
SOUL SPACE
42 HOFFMAN DRIVE
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
A
DRAWING TITLE:
STORMWATER
QUALITY
MAINTENANCE
Design AH. Checked (Ch. Date 11-07-13 Dwg. No. AMD.
SCALE : N/A ON At UNO. 4 Of 4 2783-4 J
RPD:— LOT 3 / FMR LOT 2 SP 222982
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 6
-
REFERENCED DOCUMENT
MCU13/0098.01
NOOSA COUNCIL
24 SEPTEMBER 2020
-
10 September 2020
BMC21026: 3‐42 Hofmann Drive, Noosaville
RG Strategic Australia
PO Box 1818
NOOSA HEADS QLD 4567
Attn: Mr Russell Green
RE: 3 – 42 Hofmann Drive, Noosaville
Traffic Engineering Review of Car Parking Changes
Dear Russell,
I refer to proposed changes to the existing car parking layout at 3 – 42 Hofmann Drive, Noosaville, for the purpose of
installing a new fridge, and your request for a traffic engineering review of those changes. An excerpt of the plan which
annotates dimensions for the proposed changes is shown in Figure 1.
Figure 1: Proposed Car Parking Changes
2400mm (min) +
300mm clearance
The proposed changes have been reviewed against the Australian Standard for Off‐Street Car Parking (AS/NZS2890.1‐
2004). In addition, swept path assessment have been undertaken for the 85th percentile passenger vehicle, as defined
by the Australian Standard, accessing car bay 24. The review has identified:
Car parking bays maintain minimum dimensions required by the Australian Standard for long‐term parking,
specifically 2.4m (W) x 5.4m (L) accessed by a 5.8m aisle. Indeed, the access aisle is wider than the requirement,
and car parking bays 21 ‐ 24 are 2.5m (W), providing increased accessibility.
A 0.3m clearance has been provided between car bay 24 and the freezer.
As shown at Attachment A, a B85 vehicle can enter parking bay 24 in a single manoeuvre, with minor overhang
of the vehicle body over the adjacent landscaping.
A B85 vehicle can exit the site in a forward gear from parking bay 24 with one reposition manoeuvre.
The modified design is therefore appropriate from a traffic engineering perspective.
Beth Meehan Consulting Pty Ltd
PO Box 399, Carina QLD 4152
t: 07 3398 4649 m: 0410 568 206 e: [email protected]
ABN 92 154 627 175
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 7
10 September 2020
BMC21026: 3‐42 Hofmann Drive, Noosaville
I trust that the above is clear and assists Council with their review. Should you have any questions, please feel free to
call me to discuss.
Yours sincerely,
Beth Meehan
Traffic Engineer
BE(Civil)(Hons), RPEQ # 8373, FAITPM
Page 2 of 5
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 8
B85 Vehicle (Realistic min radius) (20 4)
B85 Vehicle (Realistic min radius) (20 4) B85 Vehicle (Realistic min radius) (20 4)
Red Denoted Wheels
Assumes Overhang of Landscaping
Blue Denotes Vehicle Body
Green Denotes 0.3m Clearance
85th%le Passenger Vehicle Access 3-42 Hofmann Dr, Noosaville
Australian Standard Vehicle (AS/NZS2890.1-2004) Drawing No: BMC21026-ATR01 Version: 1
(07) 3398 4649
www.bmctraffic.com.au Scale 1:100 at A4 Prepared By: Beth Meehan RPEQ #8373 Date: 10/09/2020
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Page 9
B85 Vehicle (Realistic min radius) (20 4)
B85Vehicle(ReBa8li5stVicehmicle(Realistc
B85 Vehicle (Realistic min radius) (20 4) B85 Vehicle(Rineraaldisiutisc)m(2min0inr4ar)addiuiuss))((22004) B85 Vehicle (Realistic min radius) (20 4)
85th%le Passenger Vehicle Access: 4-point 3-42 Hofmann Dr, Noosaville
Australian Standard Vehicle (AS/NZS2890.1-2004) Drawing No: BMC21026-ATR02 Version: 1
(07) 3398 4649
www.bmctraffic.com.au Scale 1:100 at A4 Prepared By: Beth Meehan RPEQ #8373 Date: 10/09/2020
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
Used in these records
REFERENCED DOCUMENTS - MCU13 0098.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.