ADJACENT INDUSTRIAL ESTATE
rFOR DETAILS OF ROOF DRAINAGE REFER TO HYDRAULIC CONSULTANTS DRAWINGS
COMBINED
—»_
HARVESTING/RETENTION \,
TANK, TYPE AB
GROUND.
TOTAL VOLUME
22,500LITRE
DISCHARGE MIN
80% ROOF CATCHMENT
AREA TO TANK.
N
BIO_RETE!
SYSTEM FOR.
ROOF CATCHMENT
MIN AREA 45sqm >
#300 SH
BRS FOR
ONLY
BRS
OVE
A FT
|
IMUM OF
a
oe
NTION 4
iO}
iO}
WO}
~
Wa
OWN BESIDE——_1-|
CLARITY
3/1
\
\
SS PROPOSED NEW WAREHOUSE BUILDING
\
~ 13700 | | O )
me
S S
Rs oN
S
-& FFL5.400 | ™- FFLS5.400 [email protected]
¥ P
xe .
5 aN
-& FFL5.200 FFL5.200 3
S x N
~ n N,
me Nee ; ow
/ S/o. ~- | CARPARKING
\
l
1L3.510 |
\ —
. CARPARKING
~ LOT 3 PROPERTY CONNECTION TOV
9375; 5.9m @ 1% 7450)
- USIL3.470
— DSIL3.410 ——_
~ 225 BIO RETENTION BIO RETENTION
4/75 1L3.510 L1L3.600 SYSTEM FOR SOUTH SYSTEM FOR
: CARPARK NORTH CARPARK
~ 5 CATCHMENT. CATCHMENT.
~ SO RMWATER MIN AREA 11sqm MIN AREA 15sqm
~ MANHOLE 1/1:
~~ SL4.870 INTERNAL ACCESS ROAD (ROW)
ee 1L3.555
a= — gg AIR a
SITE ACCESS
/ \
Z
- S Fo FR FE ET
FLOW (LITRES/SEC.)
60
——— NO RETENTION
50:
~ WITH RETENTION
40: S
30. Zz
7 ~N
20 —___
to —_—_ —<—
oe ~
0 ! T I
2 4 6 8 10 12 14 16 18
TIME. (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING: 10,500 LITRE
TANK FOR RETENTION: 12,000 LITRE
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT: Q100
TIME OF CONCENTRATION: 5Smin
INTENSITY: 326mm/hr
SITE AREA: 3266sqm
IMPERVIOUS AREA: 2744sqm
PRE DEVELOPMENT PEAK RUNOFF: 260L/s
PEAK RUNOFF POST DEVELOPMENT: 290L/s (NO RETENTION)
RETENTION VOLUME REQUIRED: 11,900 LITRE
RETENTION VOLUME PROVIDED: 12,000 LITRE
REDUCTION REQUIRED: 29.8L/s
REDUCTION PROVIDED: 33.9L/s
FROM ROOF
HI-FLOW #300
L
i
G
COMBINED 4
HARVESTING/MITIGATION wo
TANK o
TOTAL VOLUME:
22,500 LITRE
50% HARVESTING
oe oA K 990 LO—FLOW SLOW
GS | LEAK TO BIO
w RETENTION SYSTEM
9
°
GROUND
~ N NX N N HR N N N N NX NX NYO N\ NX ~
3
RAINWATER HARVESTING AND
MITIGATION TANK ASSEMBLEY
TO LAWFUL POINT OF DISCHARGE
SCALE: NTS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
Amd Description Date
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic 3:
\-
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
MARKRIS FOODS
ARCHITECT :
iS SOUL SPACE
42 HOFFMAN DRIVE
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
A
(PROJECT:
STORMWATER
DRAINAGE
AND QUANTITY
Design Ae. Checked (Ch Dote 11-07-13 Dwg. No. AMD.
SCALE: 1: 200 2783-2 J
RPD:- LOT 3 / FMR LOT 2 SP 222982
ON A1 UNO. 2 Of 4
Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENTS - MCU13 0098.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.