This Rehabilitation Management Plan (RMP) has been prepared by Green Tape Solutions for a residential dwelling Figure 1: Proposed new dwelling and ancillary structures
house application at 178 Davis Rd, Cootharaba. Item 3 of the Information Request from Noosa Council, dated 22 August
2022 requested a rehabilitation plan be prepared to demonstrate compliance with PO3, PO10 & PO11 of the
Biodiversity, Waterways and Wetlands Overlay Code, to compensate for the loss of 54 trees on site for the house and
bushfire APZ. The proposed new dwelling house is shown in Figure 1. Figure 2 shows the proposed extent of tree
removal and Figure 3 shows the location of the proposed general rehabilitation area. This plan outlines the rehabilitation
strategies for the compensatory planting rehabilitation works for the proposed general rehabilitation areas.
Rehabilitation undertaken as part of this plan shall consist of weed management, and tubestock planting. Revegetation
shall be undertaken using species from the canopy and shrub layers and will include species identified on site during
the previous site inspection as well as species listed by the State as occurring in Regional Ecosystems 12.11.3,
12.11.16, 12.3.1 and 12.3.2. This RMP has been prepared in accordance with the following documents:
• Biosecurity Act 2014 (Qld);
• Regional Ecosystem Technical Descriptions for SE Queensland (Queensland Herbarium – DSITIA, 2012);
• South East Queensland Ecological Restoration Framework (Chenoweth EPLA, 2012);
SHEET SCHEDULE
PLAN
DRAWING TITLE REV DATE
NUMBER
Rehabilitation Management Plan – Cover Sheet RMP1 A 27.10.22
Rehabilitation Management Plan – Rehabilitation Management Strategy RMP2 A 27.10.22
Rehabilitation Management Plan – Figure 2 Tree Retention Plan RMP3 A 27.10.22
Rehabilitation Management Plan – Figure 3 Rehabilitation Area RMP4 A 27.10.22
Rehabilitation Management Plan – Weed Management RMP5 A 27.10.22
Rehabilitation Management Plan – Weed Control Techniques RMP6 A 27.10.22
Rehabilitation Management Plan – Planting Specifications RMP7 A 27.10.22
Rehabilitation Management Plan – Planting Schedule RMP8 A 27.10.22
Rehabilitation Management Plan – Monitoring and Maintenance RMP9 A 27.10.22
Rehabilitation Management Plan – Monitoring and Maintenance RMP10 A 27.10.22
Rehabilitation Management Plan – Maintenance Schedule RMP11 A 27.10.22
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Cover Sheet Tape Solutions and are not authorised for reproduction or use
in whole or part without written permission. These plans have
178 Davis Rd, Cootharaba been prepared for the exclusive use of the client. Green Tape
Solutions does not accept responsibility for any use of or
reliance upon the contents of these drawings by any third party.
CLIENT: SHEET NUMBER: Compiled by QA DATE Confirm all dimensions on site and clarify any discrepancies
prior to construction.
RH RH 27.10.22
Paul Desouza RMP1_Rev A ABN: 20 162 130 627
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 10 pages
Page 2
REHABILITATION MANAGEMENT STRATEGY
Aims of the RMP
The aims of the RMP are:
• To reinstate the rehabilitation area to a state consistent with the pre-disturbance vegetation community;
• To manage any invasive plant species listed under the Biosecurity Act 2014 (Qld) and any other significant infestations of
priority environmental weed species that may compromise the site rehabilitation plan; and
• To demonstrate compliance with PO3, PO10 & PO11 of the Biodiversity, Waterways and Wetlands Overlay Code of the
Noosa Plan 2020.
The rehabilitation will consist of the following elements:
• Weed control/management of invasive plant species listed under State legislation or the local government pest
management plan
• Planting of native tubestock with on-going maintenance for a period of 12 months in areas nominated in this plan.
• Replanting to replace dead or dying plants where revegetation does not achieve the required benchmark of 90%
survival rate.
As detailed in this plan, all maintenance works will ensure that the vegetation of the site continues to improve and be self-
sustaining. The identified rehabilitation zones will be monitored with reference to the vegetation communities, as described in
this plan.
Existing Vegetation
The site contains various vegetation communities, including Eucalypt forest and rainforest. The vegetation to be removed for
the proposed new dwelling is a mixture of regional ecosystems 12.11.3 and 12.11.16. Tree species to be removed include
Grey ironbark (Eucalyptus siderophloia), Pink bloodwood (Corymbia intermedia), Gympie messmate (Eucalyptus cloeziana),
Grey gum (Eucalyptus propinqua) and Tallowwood (Eucalyptus microcorys).
The south-west section of the site contains a number of gullies with a larger waterway in the far south-west corner. These
areas contain rainforest and wet sclerophyll vegetation and some of these areas contain patches of vegetation which are
degraded and partly open in nature (see photo plates opposite).
Tube stock planting
A total of 54 living trees are to be removed for the proposed development (Figure 2). The proposed offset planting will include
3 new plants for every 1 tree removed, equating to a total number of 162 new plants. Of this number, 2/3 (107) will be canopy
trees and 1/3 (55) will be shrubs. Of the canopy trees, at least 40 will be Eucalyptus/Corymbia species.
Compensatory planting of native tubestock will be carried out in the nominated rehabilitation area (Figure 3). Planting will
specifically occur in any of the degraded, semi-open areas in the nominated general rehabilitation zone (see photo plates
opposite). Revegetation species have been chosen from regional ecosystems 12.11.3, 12.11.16, 12.3.1 and 12.3.2, or from
species known to naturally occur on site (RMP8).
The rehabilitation works will be maintained for a period of 12 months as per the maintenance schedule on sheet RMP 9 and
RMP 10 of this plan. Tubestock planting areas should either be fenced off or plants should have tree guards placed around
them, to protect them from grazing by wildlife such as wallabies and hares.
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Rehabilitation management strategy Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP1_Rev A ABN: 20 162 130 627
Page 3
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Rehabilitation management strategy Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP1_Rev A ABN: 20 162 130 627
Page 4
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Rehabilitation management strategy Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP1_Rev A ABN: 20 162 130 627
Page 5
WEED MANAGEMENT
Weed cover in the rehabilitation area is sparse, consisting of species such as lantana (Lantana camara) and Guinea grass
(Megathyrsus maximus var maximus). Any infestations of invasive plant species listed under the Biosecurity Act 2014 (Qld) or
the Biosecurity Plan for the Noosa Council that will adversely impact the rehabilitation plan are to be treated prior to the
commencement of works. METHODS DETAILS
Complete This technique is used for plants, which regrow from bulbs, tubers or other plant parts, such as runners. Remove
Broad-scale herbicide application (e.g. blanket foliar spraying) is not suitable due to proximity to sensitive native vegetation. Removal all plant parts, including roots by hand pulling.
Where possible, targeted weed control (e.g. spot spraying) should be carried out in consideration of seasonal variations in Plant parts should be removed from the site and disposed of via landfill or composting.
Stem scraping This method is suitable for treating small shrubs and vines with thin and relatively soft bark tissue, which a
rainfall and weed growth, flowering times and treatment affectivity. Care must be taken to minimise the occurrence of off-target
reactively growing and not stressed. Stem scraping or scrape and paint is perfect for treating vine species,
damage to native species through spray-drift. especially Madeira Vine. The aim of this technique is to remove a small portion of the bark. This will allow the
herbicide to penetrate into the plant’s sapwood travelling to the tubers and effectively destroying the plant.
Weed removal/treatment should be undertaken as part of monitoring requirements and/or routine maintenance activities and
Using the knife, scrape away 100 mm to expose the sapwood. Immediately (within 15 seconds) apply the
are to be controlled on an ongoing basis as needed during the 1-year maintenance period. Any other significant infestations herbicide to the exposed stem. Failure to apply the herbicide immediately will result in the plant sealing itself off
of priority environmental weed species are to be treated to minimise the risk to the long-term survival of revegetation plantings. and not all the herbicide to effectively penetrate into it.
Weed control techniques are described in Table 1. Cut Stump or This method is a quick and effective way of treating small shrubs, large trees, woody plants and vines without
Cut and Swab aerial tubers. This method allows accurate placement of the herbicide with minimal hazard to the environment
Details on the preferred control techniques for the weed species present or potentially present on site is provided in Table 2.
and the operator. The intention of this method is to apply the herbicide to the actively growing plant sapwood.
Legal Requirement for Declared Weeds Species The herbicide will move through the plant into its roots and effectively kill it.
Using the saw, machete, cane knife or secateurs, cut the plant at least 150mm above the ground. Immediately
The Biosecurity Act 2014 imposes a ‘general biosecurity obligation’ (GBO), which imparts a responsibility on all individuals or (within 15 seconds) apply the herbicide to the base of the stump. Failure to apply the herbicide immediately will
organisations to manage biosecurity risks that are under their control and that they know about or should reasonably be result in the plant sea ling itself off and not all the herbicide to effectively penetrate into it.
expected to know about. Under the GBO, individuals and organisations whose activities present a biosecurity risk must take Stem Injection This method is suitable for treating shrubs and trees with a diameter of greater than 100 mm that a reactively
growing and not stressed. It also allows accurate placement of the herbicide with minimal hazard to the
all reasonable and practical steps to prevent or minimise their activities from causing a biosecurity event (defined as an event environment.
that is, was or may become a significant problem for human health, social amenity, the economy or the environment, and is Using a drill, small axe, chisel and hammer or machete, cut downward at an angle of 45 degrees through the bark
was or may be caused by a pest, disease or contaminant). into the soft sapwood below. If using an axe/machete/chisel, immediately (within 15 seconds) roll the back of the
blade downward, opening up a pocket in which to apply the herbicide mixture. Using a brush, spray or syringe,
The Act lists fauna and flora pest species as either prohibited or restricted biosecurity matter: immediately (within 15 seconds) apply the herbicide mixture to the exposed sapwood of the cut. Note, that it is
essential that cuts penetrate the bark and get through to the light sapwood underneath, otherwise herbicide
• Prohibited matter is any species that has not yet become established in Queensland and would have significant adverse treatment may be ineffective. Depending on the size of the tree, several cuts/injections ma y be required.
impacts on human health, social amenity, the economy or the environment if it entered the state. Basal bark This method is suitable for treating thin-barked woody weeds and trees that a reactively growing and not stressed.
• Restricted matter is any species that is already established within Queensland and has significant adverse impacts on spraying Using this technique, the stem or trunk must be sprayed with oil-soluble herbicide (e.g. Biosafe) from ground level
human health, social amenity, the economy or the environment. Restricted matter is categorised into 7 risk-based to a height of 300mm.
Using a brush and starting a t the base of each stem, paint all the way around each stem to a height of 300 mm.
categories. Some species can be categorised under a range of different categories.
To allow herbicide uptake, ensure the treated area is not disturbed for 24 hours. Note that, depending on the
Weed species listed as either Prohibited or Restricted, if identified on site, will need to be treated in accordance with the species, this technique can take up to two months to get results. Application to large trees, may result in the death
and shedding of branches which may pose a hazard. As such this method is not recommended in areas where
recommended control techniques outlined in Tables 1 and 2.
branches could cause damage.
Foliar spraying This technique is suitable for treating grasses, herbs and shrubs up to 6 metres tall and involves spraying individual
and small clumps of weeds with diluted herbicide.
Avoid spraying on rainy or windy days and make sure the plants a reactively growing. Ideal conditions for spraying
are immediately after rain and once all the dew has evaporated. In terms of application technique:
1. Spray close to the target plants to a void spray drift onto other valuable (i.e. native) plants.
2. Spray to cover all leaves and stems to the point of visible wetness.
3. Use short sweeping strokes.
4. Use frog friendly adjuvant/surfactant (such as Nufarm Bonus®).
Table 1: Weed Control Technique Descriptions. 5. Start from the far corner of the infestation working away from sprayed areas.
6. Be systematic to avoid spraying the same area twice.
7. Use Dye marker (such as Herbicide) to aid with targeted application of herbicide as required.
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Rehabilitation management strategy Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP1_Rev A ABN: 20 162 130 627
Page 6
Table 2: List of weed species present and/or potentially present within the rehabilitation area.
SCIENTIFIC NAME COMMON NAME NON-CHEMICAL CONTROL CHEMICAL CONTROL
Ambrosia artemisiifolia annual ragweed* Foliar spray in accordance with the label of product or APVMA issued off-
Hand-pull newly established or isolated seedlings.
label permit.
Anredera cordifolia madeira vine* Hand-pull newly established or isolated seedlings. Leaves removed immediately and dried out away from soil and then Basal bark, cut stump, foliar spray or stem injection in accordance with the
disposed of. label of product or APVMA issued off-label permit.
ground or climbing Dig out and dispose of at an appropriate council landfill or cover with black plastic sheeting and place in direct sunlight to Foliar spray in accordance with the label of product or APVMA issued off-
Asparagus spp.
asparagus* solarise prior to disposal. Remove the entire crown of underground stem of plant to prevent regrowth. label permit.
Cut stump or foliar spray in accordance with the label of product or
Baccharis halimifolia groundsel bush* Hand-pull newly established or isolated seedlings.
APVMA issued off-label permit.
Cardiospermum balloon vine* Basal bark, cut stump, foliar spray or stem injection in accordance with the
Hand-pull newly established or isolated seedlings
grandiflorum label of product or APVMA issued off-label permit.
Basal bark, cut stump, foliar spray or stem injection in accordance with the
Corymbia torelliana cadaghi Hand-pull newly established or isolated seedlings.
label of product or APVMA issued off-label permit.
Foliar spray in accordance with the label of product or APVMA issued off-
Cyperus involucratus* Umbrella sedge Hand-pull newly established or isolated seedlings.
label permit, or slashing or mowing
Dolichandra unguis-cat cats claw creeper* Cut stump or foliar spray in accordance with the label of product or
Pull out seedlings when soil is soft.
APVMA issued off-label permit.
Eichhornia crassipes water hyacinth* Foliar spray in accordance with the label of product of APVMA issued
Using a shovel weeding fork loosen the soil around roots tuber rhizomes and carefully ply remove the plant
off=label permit
Harrisia martinii harrisia cactus* Foliar spray in accordance with the label of product of APVMA issued
Using a shovel weeding fork loosen the soil around roots tuber rhizomes and carefully ply remove the plant
off=label permit
Foliar spray in accordance with the label of product of APVMA issued
Kalanchoe delagoensis mother of millions Using a shovel weeding fork loosen the soil around roots tuber rhizomes and carefully ply remove the plant
off=label permit
Basal bark, cut stump or foliar spray in accordance with the label of
Lantana camara lantana Hand-pull newly established or isolated seedlings.
product or APVMA issued off-label permit.
Lycium ferocissimum african boxthorn* Basal bark, cut stump or stem injection in accordance with the label of
Hand-pull newly established or isolated seedlings.
product or APVMA issued off-label permit.
Megathyrsus maximus Slashing/mowing or brush cutting and follow-up foliar spray in accordance
guinea grass Hand-pull newly established or isolated seedlings.
var. maximus with the label of product or APVMA issued off-label permit.
Foliar spray or wick wipe in accordance with the label of product of
Nassella neesiana chilean needle grass Using a shovel weeding fork loosen the soil around roots tuber rhizomes and carefully ply remove the plant
APVMA issued off=label permit
Parthenium parthenium weed* Foliar spray in accordance with the label of product of APVMA issued
Hand-pull newly established or isolated seedlings.
hysterophorus off=label permit
Pistia stratiotes water lettuce* Foliar spray in accordance with the label of product of APVMA issued
Using a shovel weeding fork loosen the soil around roots tuber rhizomes and carefully ply remove the plant
off=label permit
Salvinia molesta salvina* Foliar spray in accordance with the label of product of APVMA issued
Using a shovel weeding fork loosen the soil around roots tuber rhizomes and carefully ply remove the plant
off=label permit
Senecio Foliar spray in accordance with the label of product of APVMA issued
fireweed* Fireweed is best dealt with via foliar spraying. Hand-pull newly established or isolated seedlings.
madagascariensis off=label permit
Basal bark, cut stump or foliar spray in accordance with the label of
Senna pendula easter cassia Hand-pull newly established or isolated seedlings.
product or APVMA issued off-label permit.
Slashing/mowing or brush-cutting and follow-up foliar spray in accordance
Setaria palmifolia palm grass Hand-pull newly established or isolated seedlings.
with the label of product or APVMA issued off-label permit.
south African pigeon Slashing/mowing or brush cutting and follow-up foliar spray in accordance
Setaria sphacelata Pull out seedlings when soil is soft.
grass with the label of product or APVMA issued off-label permit.
Solanum mauritianum wild tobacco Cut stump or foliar spray in accordance with the label of product or
Pull out seedlings when soil is soft.
APVMA issued off-label permit.
Hand-pull when soil is moist, rollup and hang to dry. Remove above-ground vegetative parts with a brush hook or similar Cut stump or foliar spray in accordance with the label of product or
Solanum seaforthianum brazilian nightshade
tool. APVMA issued off-label permit.
Sorobolus pyamidalia giants rat tail grass* Foliar spray or wick wipe in accordance with the label of product of
Pull out seedlings when soil is soft.
APVMA issued off=label permit or lashing and mowing
Foliar spray in accordance with the label of product or APVMA issued off-
Sphagneticola trilobata Singapore daisy* Remove only small plants and fragments by hand-pulling. Capable of spreading from plant fragments.
label permit.
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Weed Control Techniques Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP5_Rev A ABN: 20 162 130 627
Page 7
Natural mulch shall be installed at the time of planting around each plant, to a radius of 30cm around each plant with a required
SITE PREPARATION
depth of 75 mm. Organic mulch shall be weed –free (preferably aged forest mulch) and sourced from a qualified landscape
The successful growth of plants within the rehabilitation management area will rely on careful and appropriate preparation of the supplier (compliant with AS4454-2012) or alternately, sourced from mulched vegetation on site which has been appropriately
area prior to planting. The following issues will be addressed: aged. Mulch should not touch the plant stems. Mulch can also be used in areas awaiting rehabilitation to suppress weed growth.
• Existing rubbish, other foreign material and any old fencing (especially barb wire) will be removed. Mulch should not be used in locations where there is a risk of material entering the waterway – mulch is considered to be a water
• Planting holes are to be dug at a minimum width of three times that of planting tubes. contaminant under the Environmental Protection Regulation 2008. In this instance, jute squares or matting is to be used.
• Natural mulch or jute weed matting shall be provided at the time of planting for each plant
• Any potential habitat features relocated to adjacent areas during the initial clearing of vegetation from the area that is
disturbed during (e.g. felled timber) should be stockpiled and relocated to the rehabilitation area. FERTILISER
PLANTING Each plant is to be fertilized with a slow-release fertiliser pellet (Agriform or similar). The fertiliser pellet is to be placed adjacent
to but not in contact with the root ball at 2-4 cm below the soil surface and under the mulch.
The planting schedule considers current established native plants with planting to be provided at the densities identified in this
RMP. When deciding on suitable species for seeding or planting within a site, the following has been considered:
• Species that naturally occur within the area/regional ecosystem; WATERING
• Vegetation community characteristics of the rehabilitation area.
All planting stock will be watered at planting (approximately 5-10 L per plant). On competition of the planting activities, the plants
All planting stock will be: will require water at least once per week for the first month, then once a fortnight for another two months, dependent on the
prevailing rainfall and weather conditions at the time.
• Preferably local provenance;
• Healthy and displaying signs of active growth. Plants should be rejected if displaying nutritional or physiological disorders,
leaf or stem damage, pests and diseases, root curling or showing signs of being pot bound or have weed species in the
Drawing 1– Tubestock Planting Details (Excerpt from Brisbane City Council standard drawings for tubestock planting).
container;
• A minimum of 20 cm tall for (75 mm) tubestock (larger for potted stock) and must have a well-developed root system; and,
• Sun-hardened.
Planting stock is to be randomly planted to reflect the natural composition of the original ecosystem. Seedlings must be moist at
time of planting, preferably treated by soaking in a seaweed or fish emulsion solution for 15-20 minutes prior to planting to protect
against transplant shock.
Crystals will be added to each planting hole and mixed with the back-fill soil to ensure that roots are not in direct contact with
concentrated fertiliser. The plant will be placed in the center of the hole, filled in with loose crumbly soil ensuring that no air
pockets remain, then firmed with the hands to create a shallow watering depression. The planting holes should be at least twice
the width and half as deep as the pot size (refer to Drawing 1).
All plants will be clearly marked on site (e.g. bamboo stakes). If tree guards are used to protect the new plants, the tree guards
are to be removed once tubestock has become established.
TEMPORARY PROTECTIVE FENCING AND TREE GUARDS
The rehabilitation areas should be either partially fenced off with suitable fencing or all plants should be installed with suitable
tree guards, to protect the planting stock from being eaten by herbivores such as wallabies and hares. Any tree guards installed
must be high enough to stop wallabies from eating plants when they grow taller than the guard (short guards for grasses/ground
covers and shrubs, tall guards for trees). Any fencing installed must be high enough to deter wallabies from jumping over and
must have a mesh gauge/ aperture which will keep hares out, while not posing a safety hazard to any wildlife. Fencing must also
have no gaps at the base, to ensure hares cannot access the fenced area.
MULCHING
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Planting Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP6_Rev A ABN: 20 162 130 627
Page 8
PLANTING SCHEDULE Corymbia intermedia Pink bloodwood T Native tube
Planting shall be undertaken throughout the rehabilitation planting area, with the intent to reinstate a vegetation community
Lophostemon confertus Brush box T Native tube
similar to the original vegetation in structure, function and composition. The rehabilitation species are to be taken from the list
in Table 3. If required, additional or substitute species may be chosen from the relevant strata provided in the technical Rainforest Canopy layer
descriptions for regional ecosystem 12.11.3, 12.11.16, 12.3.1 and 12.3.2. or from species known to locally occur on site. A
total of 54 living trees are to be removed for the proposed development. There is an additional tree to be removed but it is Polyscias elegans Celerywood T Native tube
dead, so isn’t counted in the ledger. The proposed offset planting will be 3 plants for every 1 tree removed, equating to a total
Elaeocarpus grandis Blue quandong T Native tube
number of 162 new plants. Of this number, 2/3 (107) will be canopy trees and 1/3 (55) will be shrubs, as listed below. Of the
canopy trees, at least 40 will be taken from the Eucalypt canopy layer list below.
Aphananthe philippinensis Rough leaved elm T Native tube
Table 3: Planting Schedule for Rehabilitation Areas Flindersia australis Crows ash T Native tube
Flindersia schottiana Bumpy ash T Native tube
QUANTITY/
SCIENTIFIC NAME COMMON NAME STRATUM PLANT SIZE
Cryptocarya hypospodia Rib-fruited pepper berry T Native tube
DENSITY
Cryptocarya obovata Pepper berry T Native tube
1 per 10 m2
Shrub Layer
Dysoxylum mollissimum Red bean T Native tube (~3m spacings)
Myrsine variabilis Muttonwood S Native tube
Argyrodendron trifoliolatum White booyong T Native tube
Ficus coronata Creek sandpaper fig S Native tube
Ficus watkinsiana Strangler fig T Native tube
Cryptocarya triplinervis Three veined laurel S Native tube
Ficus obliqua Small leaved fig T Native tube
Syzygium oleosum Blue lilly pilly S Native tube
1 per 10 m2 Ficus fraseri Sandpaper fig T Native tube
Syzygium smithii Creek lilly pilly S Native tube (~3m spacings)
Castanospermum australe Black bean T Native tube
Citrus australis Native lime S Native tube
Syzygium francisii Giant water gum T Native tube
Mallotus philippensis Red Kamala S Native tube
Alectryon tomentosus Red jacket fruit T Native tube
Breynia oblongifolia Coffee bush S Native tube
Pipturus argenteus Native mulberry S Native tube
Clerodendrum floribundum Lolly bush S Native tube
Eucalypt Canopy layer
Eucalyptus propinqua Grey gum T Native tube
1 per 25 m2
Eucalyptus microcorys Tallowwood T Native tube (~5m spacings)
Eucalyptus cloeziana Gympie messmate T Native tube
Eucalyptus grandis Flooded gum T Native tube
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Planting Specifications Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP7_REV A ABN: 20 162 130 627
Page 9
MONITORING AND MAINTENANCE SCHEDULE
Performance Criteria
Table 4 outlines the performance criteria for works within the rehabilitation area. Vegetation maintenance will continue as required under the set timeframe of 12 months for the monitoring/maintenance program. Vegetation maintenance works will be deemed
completed and accepted once the following criteria for rehabilitation are achieved following the 12-month monitoring/maintenance program.
Table 4: Performance Criteria for Rehabilitation Works.
ELEMENT COMPLETION OF INITIAL WORK AND ESTABLISHMENT PERIOD (months 1-3) COMPLETION OF FINAL WORK (12 months from start of works)
Tubestock survival 90% survival rate for planted tubestock, taking into consideration the density of any natural regeneration. Mortalities to be 90% survival rate. Any natural regeneration to be retained within rehabilitation area
replaced to achieve 90% survival rate at completion.
Mulching or matting Mulch or jute matting installed around planted species. Mulch or jute mat cover maintained around planted species.
Declared Weeds Minimal presence of declared weeds Minimal presence of declared weeds
Environmental woody weeds Minimal presence of environmental woody weeds Minimal presence of environmental woody weeds
Rubbish All rubbish to be removed during initial works. Site to be maintained free of anthropogenic rubbish.
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Monitoring and Maintenance Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP8_REV A ABN: 20 162 130 627
Page 10
Maintenance schedule, monitoring and reporting
This section outlines the required monitoring and maintenance actions for the rehabilitation areas, and the person/s responsible for undertaking these tasks. The maintenance schedule is shown in Tables 5 & 6. A 12 month maintenance and monitoring period
is to be provided.
Table 5: Maintenance and Monitoring Schedule for the Rehabilitation Zone
TIME PERIOD MONITORING TASKS REMEDIAL ACTIONS MONITORING AND REPORTING
Months 0 – 3 • Identify priority areas for treatment, rubbish and weeds to be Not Applicable Not Applicable
removed, identify necessary weed control techniques etc.
• Initial weed control for all rehabilitation zones
• Implement revegetation works including installation of stakes,
tree guards, jute mat/mulch, fencing etc as required
• Watering of any planted stock
Months 4-6 • Check appropriate weed removal/control has been implemented • Undertake replacement planting if tubestock death is apparent. • Monthly monitoring must be undertaken to ensure the rehabilitation is
and is working. • Ongoing weed management undertaken in accordance with this plan
• Check on survival rates of planted tube stock • If plants are being excessively grazed by wildlife, then implement suitable
• Check levels of herbivory on planted stock protection measures to reduce grazing
Months 6-12 • Check on the performance of weed removal/control methods • Increase weed management works if required, or implement alternate weed • Monthly monitoring must be undertaken to ensure the rehabilitation is
• Check on survival rates of planted tube stock control technique. undertaken in accordance with this plan
• Check levels of herbivory on planted stock • Undertake replacement planting if tubestock death is apparent • Perform any final remedial works are required to achieve the nominated
• If plants are being excessively grazed by wildlife, then implement suitable performance criteria
protection measures to reduce grazing (better/more fencing, better/more
tree guards)
• Provide watering and maintenance of any newly planted stock
• Undertake any other works required to achieve the performance criteria and
obtain off-maintenance status at the 12 month mark
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Maintenance Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP9_REV A ABN: 20 162 130 627
Page 11
Table 6: Maintenance Schedule for the Rehabilitation Areas (to be adapted on the ground in accordance with the weather conditions)
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Initial weed Soil preparation Regular watering Regular watering Regular watering Ongoing weed Ongoing weed Ongoing weed Supplementary Regular watering Regular Final round of
management and of planted stock of planted stock of planted stock management and management and management and planting to of planted stock watering of weed
site preparation monitoring of monitoring of monitoring of replace dead planted stock management
Planting and growth of planted growth of planted growth of stock including
Ongoing weed
mulching (and Ongoing weed Ongoing weed Ongoing weed stock stock planted stock watering Ongoing weed
management
Erect temporary installation of management management management management
Ongoing weed
fences if not tree guards if
management
using tree guards not using
Monitoring of
fencing). Monitoring of Monitoring of Monitoring of Monitoring of
growth of
Planting to be growth of planted growth of growth of planted growth of planted
planted stock
done after the stock planted stock stock stock
house is being
built
Watering (after
the house is
being built)
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Maintenance Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP9_REV A ABN: 20 162 130 627