Stage CTS 900 N/a N/a 9 x 3+ bedroom units
Conventional
Advisory Note 2 & 11
Advisory Notes 2 & 11 need to be updated to reflect the changes to land use category and GFA allocations. Our
calculations below are based upon CPI up to March 2021, as headwork contributions have been paid for the existing
Facilities Building, CPI should only apply to the additional charge.
Our calculations to March 2021 are as follows:
(a) Coastal Major Road Network
Previous Coastal Major Road Network March 2019 ‐ $266,855.00
Enclosure and internal changes to use breakdowns to March 2019 ‐ $276,585.00 for CTS400
An additional $9,730.00 plus CPI for the changes to the breakdowns of land uses within CTS400
$597,563.00 plus $9,730.00
Total to March 2019 ‐ $607,293.00
(b) Transport and Stormwater Infrastructure
Previous Transport and Stormwater Infrastructure Charges for CTS400 to March 2019 ‐ $25,058.00.
An additional $103.41 applicable based upon the changes to the breakdowns of land uses within CTS400
to March 2021.
Please update advisory note 2 with date of the Change to an Existing Approval and estimated amount as highlighted
below:
2. The applicant is informed that approval of this development application will trigger an Infrastructure
Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act
1997.
This “Change to an Existing Approval” dated 18 October 2019 will trigger amendments to be made to
the “Infrastructure Charge Notice” previously issued. An amended Infrastructure Charge Notice will be
issued for the estimated amount totalling $597,563.00 (payable in accordance with completion of each
Stage) and subject to variations in the Consumer Price Index, All Groups Brisbane from March 2019 until
the date of payment.
Please update advisory note 11 with date of the Change to an Existing Approval and estimated amount as highlighted
below:
11. Additional ADVISORY NOTE ‐ 10 September 2015, amended 10 March 2016, amended 15 December 2016,
amended 21 September 2017, amended 18 January 2018, amended 28 November 2018, amended 14 May
2019 and amended 18 October 2019 and new date to be included
11. This Development Permit for a “Change to Existing Approval for an Extension to Relevant Period” will
trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution”
made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning
Regulatory Provision (adopted charges).
This Infrastructure Charge relates only to the Public Transport and Stormwater networks previously
missing from the earlier approval.
JFP Ref: M2652/F Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Cover Letter_rec 25-08-2021.pdfRelated documentApplication case desk ↗
About this file
- File size
- 455 KB (small file)
- File type
No other editions are linked here.