Original source · versioned page text
BR190571 - BP Noosaville RFI Response Letter
Item 6
Issue: The submitted plans do not indicate any proposed bicycle facilities on the site.
Information Required:
Provide information regarding any proposed bicycle facilities (eg bike racks) on the site
- ACOR Response:
ACOR have shown the location of the proposed bicycle facilities on Drawing C3.01,
with further details provided in note 15. These facilities have been full detailed in the
architectural drawings.
Item 7
Issue: Stormwater harvesting
Information Required:
Condition 32 of MCU19/0089 and the MUSIC model submitted with the application require
15kL of roof water harvesting tanks to be provided and plumbed for indoor non-potableand
outdoor use. Clarify whether the tanks will be detailed as above-ground tanks with the BA or
below ground tanks with this OPW? If above-ground, identify the available space for the
tanks and how they will connect to the surface drainage system.
If below-ground, provide full details so they can be approved with this OPW application
Also, show the integration of the tanks into the landscaping works.
- ACOR Response:
ACOR can confirm that roof water harvesting tanks have been called up in the
Hydraulic design for the site. ACOR have also shown the location of the tank on
drawing C3.01 and have made comment on the sizing in note 14.
P:\BR19\BR190571 BP Noosaville\Authorities\NC\200828 - OPW RFI\BR190571 - BP Noosaville RFI Response Letter.docx