Ecological Assessment Letter Report · MCU26/0104
This Concept Rehabilitation Plan (Plan) has been prepared to provide To ensure successful establishment, all planting surfaces must be
the requirements for the implementation and management of the covered in a 100mm layer of high-quality weed-free mulch for a radius
revegetation activities across the proposed Rehabilitation of 400mm. A shallow ‘dish’ should be left around the base of the plant
Management Unit (RMU) as shown on FIGURE 1. (i.e. do not apply mulch right up to base of plant). Refer to FIGURE 2.
The design of this Plan has been informed by the following: Watering
Canopy species have been excluded to avoid compromising the 1. Water all plants at time of planting (approximately 5–10L per
bushfire mitigation measures advised in the Bushfire Hazard plant).
Assessment report prepared by Max Bushfire Protection, version 2. Watering requirements will be influenced by site and climatic
2.2, dated 10/07/2026). conditions but follow-up watering can be generally carried out as
Species selection reflects the mapped pre-clear Regional follows:
Ecosystem, RE 12.3.5 Melaleuca quinquenervia open forest on Daily for the first week after planting;
coastal alluvium. Every second day or as needed for 2-4 weeks after planting;
A vegetated buffer surrounding the existing dams is proposed to Twice a week or as needed for 5-8 weeks after planting; and
enhance habitat values and support erosion control: As required according to climatic conditions thereafter for the
RMU 1 will be planted densely with groundcovers and duration of the maintenance period.
–
interspersed shrubs. 3. Watering schedule may vary according to rainfall. If soil is moist
RMU 2 will be managed through assisted natural regeneration watering will not be necessary. Note that Council watering
– restrictions may apply.
and targeted weed control to support native regrowth.
Maintenance Activities
Site Preparation All replacement plantings are to be maintained for three (3) years.
The following activities are to be undertaken before planting: Maintenance works are to include mulching, watering, fertilising and
protection from weed smother.
1. Weed management: remove weeds within a one (1) metre
diameter around the planting location. Any replacement plants found damaged, dying or dead are to be
2. Soil preparation: spread topsoil to a minimum depth of 50mm. Till replaced.
any compacted areas to assist with infitration of organic materials
into depleted soils.
Planting
Plants are to be sourced from a local native nursery as 50mm
tubestock. Refer to TABLE 1 for the planting palette and density mix
and TABLE 2 for densities in each layer.
1. Plants are to be planted immediately after delivery to the Site. If
this is not possible, they should be stored in the shade and
watered sufficiently each day until plant-out.
2. Water all plants in pots before planting.
3. Planting holes should be twice the width of the pot and slightly
deeper than the pot.
4. Water base of planting hole and allow water to soak into the soil.
Alternatively, use water crystals (provided that they don't contain
additional fertiliser) and place at the bottom of planting holes in
contact with plant roots.
5. Add organic fertiliser (according to amount specified on label)
before planting.
6. The root ball of the plant should be just below the soil surface after
planting.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Ecological Assessment Letter Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.