Appendix C - Current Development Approval · MCU25/0053.01
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
Earthworks and Retaining Walls
21. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this approval and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
22. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height.
Damage to Services and Assets
23. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0074)
(EARTHWORKS)
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
0423 – OW3.1 B Bulk Earthworks Plan prepared by SCG 1/05/2025
Consulting
As annotated by Council
0423 – OW3.2 B Earthworks Sections prepared by SCG 1/05/2025
Consulting
As annotated by Council
0423 – OW3.3 A Earthworks Sections prepared by SCG 1/05/2025
Consulting
As annotated by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 21 November 2027, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
Page 4 of 10
Document Set ID: 24343665
Version: 2, Version Date: 28/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Current Development Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.