Checklist 4—Operational work · OPW16/0229
Attached to the e-mail Operational Works Application - OPW16/0229.
4.31 Is any part of the proposed works on land to which a property development plan under the Wild Rivers
Act 2005 applies?
No A development permit is required and this application will be assessed by the chief executive of
DSDIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SDAP.
You must complete IDAS form 12—Taking or interfering with artesian or sub-artesian water
End of part 4 of this checklist
Yes Continue to question 4.32
4.32 Is the proposed works consistent with the property development plan under the Wild Rivers Act 2005?
No This aspect of development is prohibited development and a development application cannot be
made for this aspect of development.
End of part 4 of this checklist
Yes A development permit is required and this application will be assessed by the chief executive of
DSDIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SDAP.
You must complete IDAS form 12—Taking or interfering with artesian or sub-artesian water
End of part 4 of this checklist
Part 5—For particular dams
5.1 Is the proposed operational work for the following?
The construction of a dam more than 10 metres in height and having a storage capacity of Yes No
more than 1500 megalitres
The construction of a dam more than 10 metres in height and having a storage capacity of Yes No
more than 750 megalitres and a catchment area that is more than three times its maximum
surface area at full supply level
Work carried out in relation to an existing non-referable dam that will result in the dam being Yes No
more than 10 metres in height and having a storage capacity of more than 1500 megalitres
Work to an existing non-referable dam that will result in the dam being more than 10 metres in Yes No
height and having a storage capacity of more than 750 megalitres and a catchment area that
is more than three times its maximum surface area at full supply level
Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if Yes No
the dam is:
more than 10 metres in height and having a storage capacity of more than 1500
megalitres, or
more than 10 metres in height and having a storage capacity of more than 750
megalitres and a catchment area that is more than three times its maximum surface area
at full supply level
Works carried out in relation to a referable dam if, because of the works, the storage capacity Yes No
of the dam will increase by more than 10% after the works are carried out.
Constructing a dam for which the chief executive under the Water Supply (Safety and Yes No
Reliability) Act 2008 has given a notice to have the dam failure impact assessed.
Checklist 4—Operational work
Version 4.0—16 May 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sara-idas-checklist-4-operational-work.pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.