Council archive · source document
Checklist 4—Operational work · OPW16/0229
Attached to the e-mail Operational Works Application - OPW16/0229.
Yes This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Agricultural or animal husbandry activities in a wild river area state
code in the SDAP.
You must complete IDAS form 29—Agricultural activities in a wild river area if the operational work is
for agricultural activities
You must complete IDAS form 30—Animal husbandry activities in a wild river area if the operational
work is for animal husbandry activities
End of part 6 of this checklist
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 9
Sustainable Planning Regulation 2009, schedule 7, table 2, item 42
Sustainable Planning Act 2009, schedule 1, items 1 and 2
Part 7—Tidal work
7.1 Is the proposed tidal work any of the following:
Excluded work Yes No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the Yes No
Sustainable Planning Regulation 2009
Work carried out in a priority development area Yes No
Work carried out on premises to which structure plan arrangements apply Yes No
If no to all of the above, continue to question 7.2.
If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required.
7.2 Is any of the proposed tidal work to be carried out in a wild river area under the Wild Rivers Act 2005?
No Go to question 7.6
Yes Continue to question 7.3
7.3 Is the proposed tidal work for any of the specified works under the Wild Rivers Act 2005?
Infrastructure and works prescribed under a regulation to be necessary for disaster Yes No
management
De-snagging that is the minimum necessary to allow safe navigation of a marked navigable Yes No
channel
Infrastructure that is roads, railways, pipelines conveyor belts and cables Yes No
Jetties and boat ramps for use by the public Yes No
Works for rehabilitation of land (e.g. rehabilitation of abandoned mines) Yes No
Infrastructure for the transmission or distribution of electricity Yes No
Other infrastructure, prescribed under a regulation that relates to the transportation, Yes No
movement, transmission or flow of anything through a wild river area including, for example,
goods, materials, substances, matter, particles with or without charge, light, energy,
information and anything generated or produced
Checklist 4—Operational work
Version 4.0—16 May 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sara-idas-checklist-4-operational-work.pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.