Original source · versioned page text
2018-19 A Year in Review
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Corporate Plan Theme 1: The Noosa Environment
“Our environment is protected and enhanced and is valued by the community”
Key achievements as we work towards our long term goal include:
Specific Operational Plan Priorities
Council finalised an extensive consultation process in relation to its
proposed Environment Strategy and adopted a new Environment Strategy
and Action Plan.
Council consulted with the community on a first draft of the Noosa River
Management Plan. Based on that feedback, further work was undertaken
in relation to fisheries. Council has finalised that additional research and
will consult further with the community on the second draft of the Noosa
River Management Plan. Council has also made a submission to the State
Government of their fisheries reform program.
Council is continuing to implement its Zero Emissions Strategy focused on
achieving net zero emissions by 2026. Council has rolled out the
installation of over 1,100 solar panels across major Council buildings. Other
energy efficiency initiatives have included retrofitting light fittings. These
actions have already reduced Council’s emissions and significantly
reduced electricity costs. Solar has been installed at the following locations:
o Tewantin Administration building
o Noosaville Depot
o Noosa Leisure Centre
o Pomona Depot
o Cooroy Library
o Noosa Aquatic Centre
o The J
o The Respite Centre
Work on our Waste Reduction and Recycling Plan has continued in 2018/19. This included significant
media coverage and school education sessions. Council also opened its Education Centre at the
Eumundi Rd Resource Recovery Centre to support the education and behavior change of students
and community members regarding waste management, re-use and recycling.
Council has successfully prepared for the introduction of the State government $70 per tonne landfill
levy that commenced on 1 July 2019.
Council signed binding contracts with the State government,
HQPlantations and the Noosa Parks Association for the
protection and restoration of major parts of the Yurol and
Ringtail Forest areas. This is the most significant
environmental project in recent years and will see almost
2,400 ha of land transition to protected conservation tenure
over the next 10 years providing regional scale environmental
connectivity, particularly for koala corridors. This project has
also won both a State and National Local Government Award
for Excellence in Collaboration.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (2018-19 A Year in Review(PDF, 1MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.