Skip to the record
The only place to find full transcripts.

Original source · versioned page text

20-003A_Wd_Rev_B

Attached to the e-mail Operational Works Application - DA Form 1 - Engineering Plans - Architectural Plans - Owners Consent - 38 Tristania Dr Marcus Beach - Driveway.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

    Hazards Identification & Risk Control
    1. FALLS, SLIPS, TRIPS                                                                                                      5.. MANUAL TASKS
    a) WORKING AT HEIGHTS                                                                                                       Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by
    DURING CONSTRUCTION                                                                                                         mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the
    Wherever possible, components for this building should be prefabricated off-site or at ground                               component mass.
    level to minimise the risk of workers falling more than two metres. However, construction of                                All material packaging, building and maintenance components should clearly show the total mass of packages
    this building will require workers to be working at heights where a fall in excess of two metres is                         and where practical all items should be stored on site in a way which minimises bending before lifting. Advice
    possible and injury is likely to result from such a fall. The builder should provide a suitable                             should be provided on safe lifting methods in all areas where lifting may occur.
    barrier wherever a person is required to work in a situation where falling more than two metres                             Construction, maintenance and demolition of this building will require the use of portable tools and equipment.
    is a possibility.                                                                                                           These should be fully maintained in accordance with manufacturer’s specifications and not used where faulty or
    DURING OPERATION OR MAINTENANCE                                                                                             (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices
    Cleaning and maintenance of windows, walls, roof or other components of this building will                                  should be regularly checked and Personal Protective Equipment should be used in accordance with
    require persons to be situated where a fall from a height in excess of two metres is possible.                              manufacturer’s specification.
    Where this type of activity is required, scaffolding, ladders or trestles should be used in
    accordance with relevant codes of practice, regulations or legislation.                                                     6. HAZARDOUS SUBSTANCES
    Cleaning and maintenance of windows, walls, roof or other components of this building will                                  ASBESTOS
    require persons to be situated where a fall from a height in excess of two metres is possible.                              (for alterations to a building constructed prior to 1990)
    Where this type of activity is required, scaffolding, fall barriers or Personal Protective                                  This building was constructed prior to 1990 and therefore may contain asbestos either in cladding material or in
    Equipment should be used in accordance with relevant codes of practice, regulations or                                      fire retardant insulation material. The builder should check and, if necessary, take appropriate action before
    legislation.                                                                                                                demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
    Anchorage points for portable scaffold or fall arrest devices have been included in the design                              (for alterations to a building constructed prior to 1986)
    for use by maintenance workers. Any persons engaged to work on the building after completion                                This building was constructed prior to 1986 and therefore is likely to contain asbestos either in cladding material
    of construction work should be informed about the anchorage points.                                                         or in fire retardant insulation material. The builder should check and, if necessary, take appropriate action before
                                                                                                                                demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
    b) SLIPPERY OR UNEVEN SURFACES                                                                                              POWDERED MATERIALS
    FLOOR FINISHES                                                                                                              Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons
    Specified finishes have been selected to minimise the risk of floors and paved areas becoming                               working on or in the building during construction, operational maintenance or demolition should ensure good
    slippery when wet or when walked on with wet shoes/feet. Any changes to the specified finish                                ventilation and wear Personal Protective Equipment including protection against inhalation while using powdered
    should be made in consultation with the designer or, if this is not practical, surfaces with an                             material or when sanding, drilling, cutting or otherwise disturbing or creating powdered material.
    equivalent or better slip resistance should be chosen.
    The owner is responsible for the selection of surface finishes in the pedestrian trafficable areas
    of this building. Surfaces should be selected in accordance with AS HB 197:1999 and AS/NZ                                   TREATED TIMBER
    4586:2004.                                                                                                                  The design of this building includes provision for the inclusion of treated timber within the structure. Dust or
                                                                                                                                fumes from this material can be harmful. Persons working on or in the building during construction, operational
    c) STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                                                 maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including
    Due to design restrictions for this building, steps and/or ramps are included in the building                               protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any way
    which may be a hazard to workers carrying objects or otherwise occupied. Steps should be                                    that may cause harmful material to be released. Do not burn treated timber.
    clearly marked with both visual and tactile warning during construction, maintenance,                                       VOLATILE ORGANIC COMPOUNDS
    demolition and at all times when the building operates as a workplace.                                                      Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants have
    Building owners and occupiers should monitor the pedestrian access ways and in particular                                   dangerous emissions. Areas where these are used should be kept well ventilated while the material is being used
    access to areas where maintenance is routinely carried out to ensure that surfaces have not                                 and for a period after installation. Personal Protective Equipment may also be required. The manufacturer’s
    moved or cracked so that they become uneven and present a trip hazard. Spills, loose material,                              recommendations for use must be carefully considered at all times.
    stray objects or any other matter that may cause a slip or trip hazard should be cleaned or                                 SYNTHETIC MINERAL FIBRE
    removed from access ways.                                                                                                   Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic
    Contractors should be required to maintain a tidy work site during construction, maintenance or                             mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive parts
    demolition to reduce the risk of trips and falls in the workplace. Materials for construction or                            or the body. Personal Protective Equipment including protection against inhalation of harmful material should be
    maintenance should be stored in designated areas away from access ways and work areas.                                      used when installing, removing or working near bulk insulation material.
                                                                                                                                TIMBER FLOORS
    2. FALLING OBJECTS                                                                                                          This building contains timber floors which have an applied finish. Areas where finishes are applied should be kept
    LOOSE MATERIALS OR SMALL OBJECTS                                                                                            well ventilated during sanding and application and for a period after installation. Personal Protective Equipment
    Construction, maintenance or demolition work on or around this building is likely to involve                                may also be required. The manufacturer’s recommendations for use must be carefully considered at all times.
    persons working above ground level or above floor levels. Where this occurs one or more of the
    following measures should be taken to avoid objects falling from the area where the work is
    being carried out onto persons below.                                                                                       7. CONFINED SPACES
    1.            Prevent or restrict access to areas below where the work is being carried out.                                EXCAVATION
    2.            Provide toeboards to scaffolding or work platforms.                                                           Construction of this building and some maintenance on the building will require excavation and installation of
    3.            Provide protective structure below the work area.                                                             items within excavations. Where practical, installation should be carried out using methods which do not require
    4.            Ensure that all persons below the work area have Personal Protective Equipment.                               workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be
    BUILDING COMPONENTS                                                                                                         provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised access to all
    During construction, renovation or demolition of this building, parts of the structure including                            excavations should be provided.
    fabricated steelwork, heavy panels and many other components will remain standing prior to or
    after supporting parts are in place. Contractors should ensure that temporary bracing or other
    required support is in place at all times when collapse which may injure persons in the area is a                           ENCLOSED SPACES
    possibility.
    Mechanical lifting of materials and components during construction, maintenance or demolition                               Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or any
    presents a risk of falling objects. Contractors should ensure that appropriate lifting devices are                          other purpose. The design documentation calls for warning signs and barriers to unauthorised access. These
    used, that loads are properly secured and that access to areas below the load is prevented or                               should be maintained throughout the life of the building. Where workers are required to enter enclosed spaces,
    restricted.                                                                                                                 air testing equipment and Personal Protective Equipment should be provided.
                                                                                                                                SMALL SPACES

    3. TRAFFIC MANAGEMENT                                                                                                       Some small spaces within this building will require access by construction or maintenance workers. The design
                                                                                                                                documentation calls for warning signs and barriers to unauthorised access. These should be maintained
    (for building on a major road, narrow road or steeply sloping road)                                                         throughout the life of the building. Where workers are required to enter small spaces they should be scheduled
    Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic hazard.                            so that access is for short periods. Manual lifting and other manual activity should be restricted in small spaces.
    During construction, maintenance or demolition of this building designated parking for workers
    and loading areas should be provided. Trained traffic management personnel should be                                        8. PUBLIC ACCESS
    responsible for the supervision of these areas.                                                                             Public access to construction and demolition sites and to areas under maintenance causes risk to workers and
    (for building where on-site loading/unloading is restricted)                                                                public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical
    Construction of this building will require loading and unloading of materials on the roadway.                               installations, excavations, plant or loose materials are present they should be secured when not fully supervised.
    Deliveries should be well planned to avoid congestion of loading areas and trained traffic
    management personnel should be used to supervise loading/unloading areas.                                                   9. OPERATIONAL USE OF BUILDING
    (for all buildings)
    Busy construction and demolition sites present a risk of collision where deliveries and other                               This building has been designed as a residential building. If it, at a later date, is used or intended to be used as a
    traffic are moving within the site. A traffic management plan supervised by trained traffic                                 workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be
    management personnel should be adopted for the work site.                                                                   applied to the new use.

    4. SERVICES                                                                                                                 This building has been designed to requirements of the classification identified on the drawings. The specific use
    Rupture of services during excavation or other activity creates a variety of risks including                                of the building is not known at the time of the design and a further assessment of the workplace health and
    release of hazardous material. Existing services are located on or around this site. Where                                  safety issues should be undertaken at the time of fit-out for the end-user.
    known, these are identified on the plans but the exact location and extent of services may vary
    from that indicated. Services should be located using an appropriate service (such as Dial                                  This building has been designed for the specific use as identified on the drawings. Where a change of use
    Before You Dig), appropriate excavation practice should be used and, where necessary,                                       occurs at a later date a further assessment of the workplace health and safety issues should be undertaken.
    specialist contractors should be used.
    (in locations with underground power)                                                                                       10. OTHER HIGH RISK ACTIVITY
    Underground power lines are located in or around this site. All underground power lines must                                All electrical work should be carried out in accordance with Code of Practice: Managing Electrical Risks at the
    be disconnected or carefully located and adequate warning signs used prior to any                                           Workplace, AS/NZ 3012 and all licensing requirements.
    construction, maintenance or demolition commencing.                                                                         All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at the
    (in locations with overhead power lines )                                                                                   Workplace.
    Overhead power lines are near or on this site. These pose a risk of electrocution if struck or                              All work should be carried out in accordance with Code of Practice: Managing Noise and Preventing Hearing
    approached by lifting devices or other plant and persons working above ground level. Where                                  Loss at Work.
    there is a danger of this occurring, power lines should be, where practical, disconnected or                                Due to the history of serious incidents it is recommended that particular care be exercised when undertaking
    relocated. Where this is not practical adequate warning in the form of bright coloured tape or                              work involving steel construction and concrete placement. All the above applies.
    signage should be used or a protective barrier provided.




                                                                                          Revision Schedule                                  Project Address :                                                                   Sheet Name:                                                             Project Status:       Project Number:
                                                                                      Number Description           Date    Issued by         No. 38 Tristania Drive, Marcus Beach                                                WPH&S                                                                   WD REV B              20-003
                                                                                      1     PCD I               10/02/22   NZP
                                                                                      2     Prelim WD           16/02/22   NZP               Client Name :                                                                       Project Issue Date :                                                    Q.B.C.C Lisence No.   Sheet Number:
Email: [email protected]
Website: www.iconbuildingdesign.com.au
                                                                                      3     WD REV A            03/03/22   NZP               Marcus & Amanda                                                                     11/03/2022                                                              126221                18
                                                                                      4     WD REV B            11/03/22   NZP
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
Log in to download the original file

20-003A_WD_REV_B.pdf · 12.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.