Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment B - Engineering Technical Note · 132008.1128.04

of 9

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 4, section 2. The text section number identifies this passage in the reader.

27.66




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              ANY AREA DISTURBED OUTSIDE OF THE WORKS AREA SHOWN SHALL
                                                                                  UGUG




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              BE REHABILITATED TO A MINIMUM OF THE PRE-CONSTRUCTION
                                                                                    E E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              CONDITIONS, AT THE CONTRACTORS EXPENSE.
                                                                          W UGT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             S
                                                                                          UGUG
                                                                                            E E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 29.50                   28.82                         28.35                                EARTHWORKS NOTES
                                 C O U
    RM




                                                                                    W
                                                                                  UGT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            1. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING
                                                                                              UGUG




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SERVICES WITH THE RELEVANT AUTHORITIES PRIOR TO THE
                                                                                                E E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 29.86                   29.19                         28.50                                   COMMENCEMENT OF CONSTRUCTION.
      RM




                                   R T



                                                                                          UGT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            2. THE CONTRACTOR SHALL REMOVE ALL STRUCTURES, DEBRIS AND
                                                                                                      E
                                                                                                        UGEUG




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             31.31
                                                                                                  W




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               FENCES FROM THE SITE TO THE SATISFACTION OF THE
                                                                                                                            32.10                                           32.10                                     31.97                                 31.68                                                                           31.64                              31.55                                                                                                                                                                                          31.13                                         30.85                                                30.10                   29.46                         28.71                                   SUPERINTENDENT.
         RM




                                                                                                                                                                                                                                                                                                                                  PLAN
                                                                                                                                                                    107




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          107
                                                                                                  UGT




                                                                                                                                                                     G




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           D
                                                                                                                                                      S                       S                        S
                                                                                                                                                                                                                                                                                                                SCALE 1:250 ON A1                                                                                                                                                                                                                                                                                                                                                                                                                                           3. EXISTING SURFACE IS TO BE CLEAR OF VEGETATION MATTER PRIOR TO
                                                                                                                                                                                                                                 S            S                                                   S                                     S                   S                   S                                                                                                                       S
                                                                                                                                                                                                                                                                                                                        .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               THE START OF FILLING.
                                                                                                                                                                                                                                                                                                            .|.




                                                                                                                                                                     .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|.
                                                                                                                                                              |. .|.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        4. FILL IS TO BE OF GOOD QUALITY AND FREE OF UNSUITABLE MATERIAL.
                                                                                                                                                    .   .|. .
                                                                                                                                                 .|                                                                                   . .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|.
                                                                                                                                                                                                                                 |. .|
                                                                                                                                                                                                                                                                                                                                                                      .|. .|. .|. .|. .|.
                                                                                                                                             |.
                                                                                                                                        .|. .
                                                                                                                                                                                                                                                                                                                                                                                            .|.
                                                                                                                                                            |. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .
                                                                                                                                                                                                                                                                                                                          .|. .|. .|. .|. .|. .|. .|. .                                                                                                                                                                                                                                                                                                                                                                                                                     5. NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING SHOWN ON
                                                                                                                           .|. .|. .|.                | .  .                                                                                                                                                            |.                                                                                                                         .|.
                                                                                                                                                ..                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             THE DRAWINGS, THE ACTUAL LIMITS SHALL BE DETERMINED ON SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        .|.




                                                                                                                                           |. .|
                                                                                                                                                                                                                                                                                              .|. .|. .|. .|. .|. .|.




                                                                                                                                                                                                    .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|. .|.
                                                                                                                                      .|. .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BY THE SUPERINTENDENT DURING CONSTRUCTION. SIMILARLY, THE
                                                                                                                                                                                                                                                                        .|. .|. .|. .|. .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       . .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               FINISHED SURFACE LEVELS MAY BE ADJUSTED BY THE WRITTEN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             .|. .|. .|




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DIRECTION OF THE SUPERINTENDENT DURING CONSTRUCTION AFTER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               AMENDED DRAWINGS HAVE BEEN APPROVED BY COUNCIL.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     . .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            6. ALL EXCAVATION AND FILLING SHALL BE CONSTRUCTED TO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        . .|




                                                                                                                           .|.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 REQUIREMENTS OF AS3798-2007 AND IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               . .|




                                                                                                                                 .|.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           CURRENT COUNCIL SPECIFICATIONS AND STANDARD DRAWINGS.
                                                                                                                                       .| .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        .|




                                                                                                                                              .|.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                .|. .|.




                                                                                                                                                  .   |. .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  7. LEVEL 1 CERTIFICATION IS REQUIRED ON ALL LOTS IN ACCORDANCE
                                                                                                                                                             |. .
                                                                                                                                 .|.




                                                                                                                                                                 |.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            WITH AS3798-2007.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 .|.
                                                                                                                                                                                              1:3




                                                                                                                                                                      .|.
                                                                                                                           .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       PRELIMINARY VOLUMES (NO COMPACTION)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        |. .
                                                                                                                                                                        .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            8. ALL DRAINAGE STRUCTURES ARE BE PRESERVED FROM THE EFFECTS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      .




                                                                                                                                                                                  .|.                                                                                                                                                                                                                                                                                                                                                                                                                                  CUT = 2,365m³
                                                                                                                                                                            .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  .|.




                                                                                                                                                                                        .|.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    OF STRUCTURAL LOADING GENERATED BY THE EARTHWORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FILL = 1,962m³
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             .|.




                                                                                                                                                                                              .|.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            .|.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BALANCE = 403m³
                                                                                                                                                                                                                                                       INSET                                                                                                                                                                                                                                                                                                                                                           (VOLUMES ARE TO FINISHED SURFACE LEVELS AND DOES NOT INCLUDE BOXING)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            9. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                          SCALE 1:200 ON A1
FILE: 5001-106-107.dwg DATE: 29-11-2018 USER: CAMERON RAMM
XREFS: X-18-001942-SURVEY, X-18-001942-TITLE, X-18-001942-5001-BASE, X-18-001942-5001-CUT_FILL, X-18-001942-5002-CONTS
              DESIGN DRAWN CHECK APPROVED                                     DATE                                                                                                            STATUS                                                                                                                                  SCALE                                                                                                                                                                                                 CLIENT                                                                                                                                                                                                 PROJECT                                               DRAWING TITLE
 FIRST                                                                                                              AMENDMENT DETAILS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Calibre Professional Services (QLD) Pty Ltd
 ISSUE           CB        CB        -                -                  26.10.18
                                                                                                                                                                                                                    FOR APPROVAL                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Level 3, 16 Innovation Parkway       BLUE CARE SUNRISE BEACH                                            EARTHWORKS
         A       CB        CB       SP               SP                  02.08.19 FIRE TRAIL AMENDED                                                                                                                                                                                                                                           0      2.0       4.0      6.0    8.0    10.0                                                     12.0                                                          14.0             16.0                                                                                                                                                                                  Birtinya QLD Australia 4575
A
M        B       CR        NV       SP               SP                  08.04.20 BASIN AMENDMENTS                                                                                                                 NOT FOR CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                               SCALE 1:200 (A1)                                                                     SCALE 1:400 (A3)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Telephone 07 5314 2520
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Facsimile 07 5314 2522
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        RETIREMENT LIVING &                                               DETAIL PLAN
E
         C
N
D
M
         D
                                                                                                                                                                                              APPROVED
                                                                                                                                                                                                                                                                                                                                               0      2.5       5        7.5    10     12.5                                                                     15                                            17.5             20                                                                                                                                                                                                                            AGED CARE
E
                                                                                                                                                                                              BY:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DISCLAIMER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         PROJECT No.         DRAWING No.      REVISION
         E
N                                                                                                                                                                                                                                                                                                                                              SCALE 1:250 (A1)                                                                     SCALE 1:500 (A3)                                                                                                                                                                                                                                                                                               ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR
         F
T
S
         G                                                                                                                                                                                    SIGN:                                      DATE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 C   calibregroup.com                                              PRIOR TO CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   DO NOT SCALE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         18-001942           5001-106           B

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment B - Engineering Technical Note.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.