INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Form 1 Development Application idas
or "ko
px Wed CA 7 =
| G O an aetaiis &
cp SHER RQ.
| ores és $
S {rr pet}
The completion of all applicab Equebtions on irt A S-wrandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or mare uthePeamptet&d parts of the Form as required. For more information on the parts of the Form refer to www ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Gulde 4.
Description of land 1. Street address: fncludinghouse number, street name, suburb/locality name & postcode) (if applicable)
identified. However, a description of the land is not STL fi =e = CAer|
tequired in relation to a mobile or temporary says . : 4 .
Environmentally Relevant Activity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
development is proposed within a water body or — -
@ watecourse. 3. _Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
identified by a tot on plan description. These details C5 i RAASO S PAS CEES —j ee
el gowanent e cooumen's ortvough ® 14 The above description is for: (ick applicable box)
tained from titte d through th TG
However, if the land on which the development is (J {i} the land on which the development is proposed; or
d thave al lan description (ie. - wae we . .
Pr eovekgmente nonteedintweter boven fie [1 (ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed; or
“ agonngtadacent ator we C1 (iii) the water body or watercourse.
ii) GPS coordinates where there is no
" adiviningladjacent tand (eg. in Moreton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
development is within a water body or watercourse. — O 474
Advice for completing Q8 - O8 applies if ‘ . to gt : . :
development is within a focal government area, 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
focal government's area unless provided for under the —_ PL oH (+4 -
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if j : ite) (jf 9
development is on strategic port land ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
11, Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
|
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part £, etc)
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicant's name: 15. Contact person:
applicant need not be the owner of the land, PFS EP ER, C SUA Sa+ CO Ar~77? JO—~
When signing and todging this application 14, Contact number: 16. Facsimile number/e-mail address:
The applicant is responsible for ensuring the | eecepp cys |
information provided is correct. The assessment “SUCEELS at
manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when | 17. Postal address:
assessing and deciding the application.
the applicantisa company - contact person
must be shown. 18. Signature: 19. Date:
|See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 23 (of 66)
Section 2
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
sumer | [me [Same Ti
application must contain, or be supported by, the
written consent of the land owner/s, if the application :
involves: |
()_amateria change of use; ”) fer. coafessne veneeeeees Lo NBD
(3) reconfiguration of a lot; .
{iii} work on land below high-water mark & not within a (it)
canal as defined under the Coastal Protection and be ee te eee ce acc e ewe ec cb ec ccc eee eee eb c cee eee eee
Management Act 1995;or ,
{iv} work on rail comidor land defined under the (iii)
Transport infrastructure Act 1994. ce eee ee ec ee eee ee eee ce ee cee ch ee ce eee eee ee ee eee cece ce ene en nec ecueccee
Section 3.8.1(2)(a) of the IPA provides that .
landowner's consent is not required for a mobile or (iv)
temporary ERA. wn enn nee nnn ne nn en ee eb eee ee ee en eee eee ee bee eee ee eee
For more information refer to Guide 1. (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entittement be given for applications that
involve a prescribed State resource. LI NO - go to Q24 (1 YES - go to. a22
application ACOKa Not to be property made 22. This application is accompanied by evidence: (tick applicable box)
Section 3.2.1(10}(a}(ii) of the IPA prescribes that an : ar . .
he evenee Oe ee (1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
Refer to schedule 10 of the ‘integrated Planning (_] (ii) the chief executive of the department administering the resource is satisfied the
Regufation 1998 that prescribes the nature of evidence i i i i i -
@ rewired by the Slate in support ofthe lodging of his development is consistent with an allocation of, or entitlement to, the resource — go
development application.
{| (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23
ae homvonnt\ we ‘evi 23. Evidence of the resource entitlement:
@ information in (i) — (v} is mandatory if avidence is 7 . . . 7 ;
required under 022 {ior (ii) above. (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable,
application involves any water or riverine quarry (ii) Name of delegated officer
ceton 32164) low he esa Cd
Section 3.2.1(54)} allows the resource manager to (mit
the time the evidence may be used. Q23 (vi) must be iti iti
completed ifthe evidence is time ited (iii) Position of — officer
{iv) P of ~ Officer
, (v) Date
© (vi) _ date of evidence (if applicable)
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
he connelovcree me Cees ramede O {_] YES _] NO - the assessment manager may refuse to accept this application on the
must be completed for ail ather applications. grounds that the application has not been properly made
Plans | drawings / reports 25. Plans/drawings/reports accompanying this application:
sport pox enable besser Plan/Drawing/Report Number | Title =| ate
An application should be accompanied by details to .
manager, referral agencies and any person viewing ;
the application during public scrutiny or public (i)
notification to understand the scope of the proposal won rr rte cnet careers rece renee erent eran pererneneannnnecnnteranneernnees
and any potential impact. {ii)
(iii)
(iv)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
rv te 0 I
OFFICE USE ONLY (appiicabie to assessment manager's)
ee) 2,95 | sect | 6/afop 1 es IPS neem, | wmsens | o7/ Zste __|
' OATE RECEIVING OFFICER’S | /) REFERENCE
Notification of Engagement of Private Certifier (Optional format) V
{ To Council. | have been engaged as the private certifier for the building work referred to in this application.
= i Date ofengagement: / / — Accreditation Number: ___ Name: Signature:
Na ee eeSection 3
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
Form 1 Development Application idas
perational é ding iS * $)
Operational &/or building work A>"
assessable against a local government’s planning scheme bh 4 Sy
Q,
he, Y |
, j
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/ok Bafidiqg work Caigpetate
engineering plans end other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & a yen the dogs
not involve assessment of a material change of use of premises at the same time) assessable against a local govermment's ee HRS
Nature of the application 1. This application is for (tick one (1) or both if applicable) eT
Sorelarent toecnn, wide s presminary 0D Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
A development permit authorises imi ~ provi . water and
approval is a step in the approval process :
arddesnatautesedowempmentoomst}
The types of work that are assessabie against . .
@ a planning scheme are determined by the AND/OR
onan 1 pare eed Dovemmment mn | Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
To determine the types of work that are *
assessable under a partar planing
scheme, contact the relevant local
govemment. 2. Are the works subsequent to a previous development approval?
[]NO [+yES- provide details of aif previous approvals (eq. file references) -
13. Is the subdivision for a canal estate?
FAN Ces
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable} ; [Ves ~ complete 05
Prior to issuing a development permit for the ‘
works, the assessment manager is required (1 NO - 05, 6&7 do not apply
by law to ‘sight’ an approved form, issued by
Qleave, which signifies that the PLSLlevy |5. Has the PLSL levy been paid?
"has been pa [11 YES - completes | |
@ , FINO - the applicable levy must be paid before a development permit can be given for the works .
‘16. How much was paid?
| ; ; 7. Whatis the receipt number of the payment?
| PLEASE NOTE |
- This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse fo accept an application that, at the time of lodgement, fails to provide all applicable information
, requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (eppiicable to assessment manager)
poco | ee ISection 4
INTEGRATED PLANNING ACT 1997 _ - Part E, Version 2.0, 4 October 2004
(i) Is a PLSL levy applicable in this instance? {JNO LI YES - complete Of)
(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application? —.
. me) (1 YES - provide receipt details befow
ee a ee i I A ee |Section 5
i TAL HOOSA STAR eH
3 ‘ \ pray cool.
X :
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 Novembe 2008 g
7 ma . ; ; eet! 5 .
OO eee eine une
—— ID Ln ES
a y q * -
i AY}
aa = -7 MAR 2 Oo
| ] e ck / st yoasnstiae #
- egal
| | . FROME,
Formerly the “Referrals Checklist”) os
! ( y : <y {To ath.
IMPORTANT NOTE FOR ALL APPLICANTS: } | a
U)
1. This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the tocat Councit and/or certain Queensland State entities (e.g- Environmentat Protection :
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc). ” :
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to :
- determine the assessment manager’ for the application. : . . :
@ . 4, Therefore, the completion of al! questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. It is the responsibility of the applicant to accurately complete this checklist. . ,
6. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application. -
7. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?. . : .
8. To assist you in answering the following questions a Series of guides are available free from the IPA website www.ipa.qid,gov.au. Guide 25 explains the role of the IDAS
. Assessment Checklist in the IDAS application process, and its relationship to the Farm 1 development application.
9. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from :
www. ipa.qid.gov.au.
10. Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006. ,
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006, .
Environmentally relevant activity 1. The application involves: (tick applicable box/es) :
For more information refer to Guide 4. [J (i) an environmentally relevant activity (ERA) for which a code for environmental compliance.
Unless you answered “none of ihe above” to Q1, Ihe
application requires assessment by the : - has not been made - complete Part of Form 1 . ;
administering authority’. (_] (i) a mobile or temporary ERA for which a code of environmental compliance has not been
fan entity, other than lhe administering authority, is made - complete Part G of Form 1 t
administering authority is a concurrence agency for ii) none of the above "
the assessment manager far the application, the . -. : :
@ lhe application in relation:to this matter.
Note: An application involving ERA 19 and/or 20 will ‘
also require completion of Part Ky af Form 4 for ‘ ‘
approval where an allocation under the Water Act :
2000 is required, . ; ;
State-controlled road matters 2. The application involves: (tick applicable box/es) :
For more information refer to Guide 3. 7 . .
Unfoas you answered none af the above" to 02, the C1] (i) development on land contiguous? to a State cont olled road and for
. fi -
application triggers referral to the Department of CJ (a) material change of use assessable against the planning scheme; ,
Main Roads (DMR) as 2 referrat agency. . . .
{n certain circumstances DMR will be an advice O (b) reconfiguring alot unless . . .
agency, while in other circumstances DMR will be a » the total number of lots is not increased; and
concurrence agency; + the total number of lots abutting the State-controlled road is not increased;
Schedule 2 af the IP Regulation will assist you to . : :
determine where OMR is an advice or concurrence _) (c) operational work (not associated with a material change of use assessable against the
agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)
¢ associated with access to a State-controlled road; or j
¢ for filling or excavation; or
. ¢ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a i
State-controlled road.
7G
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’ . ; i
3 The ‘administering authority’ may de either the Environmental Protection Agency, the relevant local govemment (for a devolved ERA) or the Queenstand Department of Primary Industries and i
a Fisheries {for a delegated ERA). i
— 4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if part of the land is within 100m of the State-controlled road; or that is part of a future State- '
controlled road. co, :
mo Page 1 ‘Section 6
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
State-controlled road matters (cont) (_] (ii) development on land not contiguous to a State-controlled road and -
: (J (a) material change of use - .
, * assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. . that schedule; ;
, . 7 (7) {b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(J (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring 2 fot mentioned in (b} above)-
. « assessable against the local government's planning scheme; and ;
. « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
A, ~ that schedule.
J (iii) none of the above
Clearing vegetation - - ~ 13. The application involves: (tick applicable box/es)
, }For more information refer to Guide. 12. : Cc (i) material change of use-
, ‘Unless: you answered "none of the above" to Q3, the : . . .
application requires assessment by the Department (a) assessable against the planning scheme;
of Natural Resouirces Mines and Water (NRMW). . “astra
If an agency other than NRMVW is tha assessment (b) on a fot containing .
manager for the application, NRMWisa ~ * * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
this mater oeney For the application " relation to “e if there is no property map of assessable vegetation for the lot - remnant vegetation; @
- Ifyou ticked 03(i) or (i), your application reduires (c) where the existing use of the land is a rural or environmental use; and Do,
referral to NRMW for assessment regardless of ~ (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
, whether vagelalion clearing is proposed or not: ._ . . .
en: LJ (ii) reconfiguring a fot -
. Lo (a) ona lot containing a category 1, 2 or 3 area shown on a property map of
; . assessable vegetation or, if there is no property map of assessable vegetation for
. . . ' the lot, remnant vegetation; .
(b} where the size of the lot before the reconfiguration is 2 hectares or larger;
; (c) where 2 or more lots are created; and
({d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4
(] tii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i} or reconfiguring a lot mentioned in (ii) - complete Par J of
me Form 1
{iv) none of the above.
Strategic port land 4. The application involves:
For iore infcrmation refer to Gude 1 [_]J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI @
If you ticked (i} - the relevant Port Authority is the Act
assessment manager for the application. Cl) - complete Part ! of Form 1
If you ticked (if) Queensland Transport is a (_] (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. Jt Act for the strategic port land - complete Part | of Form 1
CHG none of the above
Acid sulfate soils 5. The application involves development on land situated in an identified> local government area
For more information refer to Guide 10, and where the surface of the land is: (tick applicable box)
Uniess you answered “none of the above" to Q5, the ‘ 6 ae '
application requires assessment by Depatmentot | C3 (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
Natural Resources Mines and Water (NRMW). soil or sediment at or below 5m AHD, or :
If an agency other than NRMW is the assessment ij ou . . . 3
managet for the apalicaion, NRMW isan advice [ ] (ii) at or below 5m AHD and the development will invoive filling the site with 1000m3 or more
agency for the application in relation to this matter. oh. material
{ili} none of the above .
5 The identified local government areas are: Aurukun, Bowen, Brisbana, 8roadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloala, Dounglas, Fitzroy, Gladstone, Gald Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
- Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday. .
6 Australian Height Datum {AHD)}. .
. Page 2 .Section 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment ChecWist, Version 18.0, 10 November 2006
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible.
: Major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guided? an
If you answered "YES" fo Q6, thé application - 0
Fororea, a Seems (RES) Departmentof (11 YES - complete Part t of Form 1
“Ht an agency other than DESis the assessment ~
manager for lhe application, DES is a concurrence _
agency for the application in elation tothismatie: | a wee ee ee
Water related-development under the 17. The application involves: ;
Water Act2000 = * —* s 48.1 ([](i) operational work, for taking or interfering with water under the Water Act 2000, that is:
- For more information about ilems (a) ~ (d), refer'to:*, (tick applicable box/es) 2
Guide 15. For more information about item (e};S+ . .
refer to Guide {4 Does my application involve * * [J (a) in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
assessment of a referable Jam?’ 8 a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, Ks, Ks, Ke, or Ke of oo
“Unless you answered “none of-the-above" fo Q7, the} Form 1 whichever is applicable:
application requires assessment by the Department . . :
of Natural Resources Mines and Water (NRMW).**: (-] (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
©if an agency other than NRMW is the assessment Ks of Form 7; ;
manager for the application, NRMWisa ot . . + 7
concurrence agency for the application in relation 6 . C1 (c) fora subartesian bore, in declared groundwater area’, for use for purposes other
this matier. Fy a than stock and/or domestic use - complete Part Ks of Form 1;
: ot a Tg (_} (d) for a subartesian bore, in certain declared groundwater area, for use for stock
Fe and/or domestic purposes - complete Part K; of Form 1;
© SO eS [-] {e) for constructing a referable dam® or that will increase the storage capacity of a
a . iE referable dam by more than 10% - complete Part Ks of Form 1; or
CPt le {_] (f) for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
Oo | Ei) none ofthe above, |
‘Removal of quarry material froma “8. Does the application involve development for the removal of quarry material from a watercourse?
‘watercourse. == So requiring an allocation notice under the Water Act 2000?
« For more information refer to Guide 16° - [ano .
Hf you answered “YES"to QS, the application + ,
Resources Mines and Waler REMI} (_] YES - complete Parts K and G of Form 1
fequires assessment by the Deparment of Natural | . P.
- {fan agency other than NRMWis.the assessment '
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter; > me
Note: Pait G of Form 1 is required to be completed .
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
. t
7 The declared ground water areas are listed in Guide 13 Development ip a declared catchment area, :
8 Referable dar is defined under tha Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA. ‘
~~ | , Page 3Section 8
INTEGRATED PLANNING ACT 1997 IDAS Assessnient Checklist, Version 18.0, 10 November 2006
Operational works ina tidal areaor {9, The application involves operational work that is: ( tick the applicable box/es)
oe menagement district Formore | L-l(i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in focal | Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; OF
___ Sevemment tial areas rete to Guide 24 (_] (ii) tidal work that is prescribed tida! work" other than in a canal’2 -complete Part P of Form 1; or
Unless you answesed “none of the above’ to Q9, the . . , oo,
. Application requires assessment by the (_) (iii} carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any boxes (a) to (i) below are ticked.
if an EPA is th t . . . . .
manager for the apicebor EPA is a concunence (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
- agency for the application in'telation to this matter. other than those works in tidal water) where the development has been determined not
‘ Local government is the assessment manager for all to be assessable against the Water Act 2000;
prescribed tidal work, = eos . . , . .
4 [J (b) constructing a canal’? intended to be connected to tidal waters; ;
oe oe [_](c) constructing an artificial waterway;
‘ (J (d) reclaiming land under tidal water;
. | (J (e) disposing of dredge spoil or other solid waste material in tidal water;
(_] (f) _ interfering with quarry material on State coastal land above high-water mark;
. a . (_] (9) draining or allowing drainage or flow of water or other matter across State
: . coastal land above high-water mark;
7 (_] (h) removing or interfering with coastal dunes on land, other than State coastal land,
; . that is in an erosion prone area and above high-water mark;
West so [J (i) constructing a bank or bund wall to establish a ponded pasture on land, other ©
: wo than State coastal land, above high-water mark; or OO
oo OS ho none of the above. . | /
Operational work below high water | 40. The application involves operational work that is: (tick the applicable box/es)
mark : ge 13 .
For mote information sefer to Guide 18, For more [-] (i) tidal work®3 as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 4; of .
government tidal areas refer 10 Guide 24 (1) (ii) tidat work that is prescribed tidal work" - complete Part P of Form 1: oF
/ i fe ide 24. ey gs . . :
Unless you answered “none of the above" to 070, . : . ,
the application triggess veena fo Queensland (_] (iii) carried out within a coastal management district'S under the Coastal Act and for -
Transport {QT) (Maritime Safety Qld) as a . . . . sp gs
concurrence agency. J (a) disposing of dredge spoil or other solid waste material in tidat water - complete Part
Local government is the assessment manager for ali M of Form 1; .
ibed tidal work. _ .
= J (b) reclaiming land under tidal water - complete Part M of Form 1; OF
[_]{c) constructing a canal", if the canal is associated with reconfiguring a lot - complete
. Part M of Form 7:
ah none of the above.
’ Coastal management 11. The application involves: (tick the applicable box/es)
For more romaine to ee ot (J (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to 011, i ; jetrintis
the application requires assessmanl bythe work carried out completely or partly in a coastal management district ©
Environmental Protection Agency (EPA). LJ (ii) a material change of use assessable under a planning scheme involving building
it an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is —
manager for lhe application, EPA is a concurrence
agency for the application in relation to this matler. ¢ the construction of a new premises with a GFA" of at least 1000m2
+ the enlargement of the GFA of existing premises by more than 1000m?
[]{iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(} (iv) reconfiguring a Jot'® assessable under schedule 8 of the IPA and in connection with
' om construction of a canal'® - complete Part M of Form 1
. (v) none of the above
_ ee |
10 Tidal work is defined in sch 10 of the IPA. :
11 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and includes cestain tidal works completely or partly within a local government tida! area. f
12 Canal means cana! as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the [PA. :
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area. |
15 Coastal management district is defined in sch 10 of ihe IPA and means a coastal management disirict under the Coasta! Protection and Management Act 1995, other than an area declared as a !
coastal management district under section 47(2) of that Act. i
16 Cana! means canal as defined under the Coastal Protection and Management Act 1995 ‘
17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. t
18 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operationat works to construct the artificial waterway. |
. Page 4 .Section 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
: Development within the limits of a 12. Does the application involve development below high water mark'$ and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For. [4Kio
information about prescribed tidal work refer to
Guide 24. [_] YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
li you answered “YES” to Q12, the application
triggers referral to the Port Authority:
The Port Authority is a concurrence agency if the _
developmentis — ” oO .
¢ within 200m of a shipping channel or an entry
' and exit shipping corridor for the port =i -
/ * within 1000m of a swing basin, a commercial + .
shipping wharf, a mooring, anchorage or spoil ”
. grounds; ” ao es :
“* within 1000m of a planned port facility identified .
in atand use plan-approved under the Transport
Infrastructure Act 1994. .
In all ther situation the Port Authority is an‘advice <
. _ agency. tee a - eeu seneee ee ce tcp enn tees ngs pee te ea
Marinas : _' * ‘143. Does the application involve operational work that is tidal work for a marina2° with more than 6
" For more-inférmation refer to Guide 18..For. vessel berths?
information about whether a marina is prescribed HO : ‘
__ tidal work refer. to Guide.24 The local government , 0 :
is th t er for all prescribed tidal . . ag
YO eee [_] YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
tfyou answered “YES” to Q13, the application ™ ,
triggers referrat to Queensland Fire and Rescye «- |
Service as an advica agency. >.>. fF 8. | . ee ee pe erm ramps ne manatee neg
Tidal works in strategic port land tidal} 14. Does the-application involve tidal works within a strategic port land tidal area"?
areas Mo NO
For more information refer to Guide. 18. Oo YES - complete Part M of Form 1 : :
Unless you answered "NO" to Q44, the relevant Port
Authority is the assessment manager for the °
application and the Environmenial Protection .
Agency (EPA) and Queenstand Transport (QT) are
concurrence agencies for the application. ; : oe
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For furlher information refer to Guide 49. Queensland Heritage Act 1992?
If you answered “YES” to Q45, the application . 0
triggers referral to the Queensland Heritage Councit
as concurrence agency for the application. C] YES- complete Part C of Form 1 . . ,
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the declared involves: (tick the applicable box/es) . . :
. catchment areas wilhin Queenst!and, refer to Guide . . . . . . ,
13. LJ (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares:
thea Poon wea crore of he above’ to a6, (1 {ii} development assessable. against the planning scheme involving the establishment or
Department of Natural Resources Wines and Water expansion of a waste water disposal system, other than a disposal system for carrying
© {NRMW). a an environmentally relevant activity under the Environmental Protection Act 1994;
if an agency other than NRMW is the assessment fos
manager for the application, NRMW is a lit) none of the above
concurrence agency for Ihe application in relation to .
this matter. / .
Contaminated land 17. The application involves: {tick the applicable box/es)
of reconfiguring a tol may trigger this referral C) fi reconfiguring a lot for which all of part of the premises are
Applications involving material change of use and/ ; . A ; i _
For more information refer to Guide 5 (a) premises mentioned in the IPA, schedule 8, part 1, table 2 —
Unless you answered “none of the above" to Q17, + item 5, including the exemption otherwise provided for by paragraph (d); :
__ lhe application requires assessment by the « item 6, including the exemption otherwise provided for by paragraph (e); or :
Environmental Protection Agency (EPA). If an : . . . . . was .
agency olher than EPA is the assessment manager * item 7, including the exemption otherwise provided for a mining activity or petroleum
for the application, EPA will be a concurrence activity; or
agency forthe application in relation to this matter (b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
_ Ci) amaterial change of use-— -
(a) made assessable under the {PA, schedule 8, part 1, table 2, items 5 to 7; or i
(b) assessable against the planning scheme and if all or part of the premises is in an area
: for which an area management advice has been given for unexploded ordnance -
He. complete Part N of Form 1 i
1
. (ii) none of the above
i
|
, |
= 19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. |
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995. |
2¢ Strategic port land tida! areas are ihe areas generally 50 metres seaward of high water mark adjacent to strategic port land. i
an Page 5
Cn a Le “Section 10
INTEGRATED PLANNING ACT 1997 _ . IDAS Assessment Checklist, Version 18.0, 10 November 2006
Electricity infrastructure _ 18. The application involves: (tick the applicable box/es) ,
Re Tore information refer to schedule 2of the IP (1) (i) reconfiguring a fot where any part of the lot is -
Unless you answered “none af the above’ to Q18, 8 Subject to an easement in favour of a distribution entity or transmission entity under the
the application liggers referrat to the-agency to Electricity Act 1994 and the easement is for a transmission grid or supply network under
which the easementis granted in favour of as advice that Act; or , .
Me - + situated within 100m of a substation site;
, nO [_] (ii) a material change of use, assessable against a planning scheme and not associated
- CO with reconfiguring a lot if — {
‘ a, * any part of the premises is subject to an easement in favour of a distribution entity or ;
, - transmission entity under the Electricity Act 1994 and the easement is for a transmission
So grid or supply network under that Act; and
-- . o * any structure or work that is the natural and ordinary consequence of the use is, or will be, ,
a | located wholly or partly in the easement;
ao Be () (iii) a material change of use, assessable against a planning scheme and not associated
I ee with reconfiguring a lot if any part of the premises ts situated within 100m of a substation
a Coes site; -
, “ : (J (iv) operational work that is filling or excavation assessable against the planning scheme,
‘ not associated with reconfiguring a lot, if -
. ‘ ° ¢ any part of the premises is subject to an easement in favour of a distribution entity or .
: transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement; ‘ @ ‘
, .o x the work is located wholly or partly within 10m of a substation site; ;
; “J (v) none of the above. — 7
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure?
Applications invalving development on land Oe : : +h
designaled for community infasbucture may rigger (i) intended to be supplied by a public sector entity; and
this referral. (ii) on land not owned by or on behalf of the State; and
For more information refer to schedule 2 of the [P _ , .
Regulation, " (iii) other than development -
Ifyou answered “YES* to Q19, the application (a) for the designated purpose; or
feguires assessment by the chief executive of the . .
department administering the Act authorising the arned out by, or on behalf of, the designator.
development for the designated purpose. : NO
If an agency other than tha designator is the . *
assessment manager for ihe application, the ( YES
designating agency will be a concurrence agency for -
the application in relation to this matter. /
Page 6 ,
|Section 11
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 18.0, 10 November 2006
SEQ Regional Plan 20. The application involves (tick applicable box/es) - :
For more information refer to schedule 2 of the [P [J (i) amaterial change of use of premises -
cS (a) in a Major Development Area in the Urban Footprint for -
Refét to Chapter 2, part 5A and schedule. 10 of the [J (i) an urban activity -
Ree Cae e en datiions he (1 _ in an area included in a structure plan where the IPA, section 3.1.6
Uitess you answered “none af the above" to 020," applies; |
ie application oO ee (in an area not included in a structure plan where -
cee gy ee PP vi te * the IPA, section 3.1.6 applies to the application for the material change
, , mS : of use; or
‘ Spe + the premises exceeds 10,000m2; or ;
t Mo Fol: « the gross floor area (GFA) on the premises will exceed 10,000m2: or
Tos impact assessment is required under the relevant planning scheme :
. Of 7 ( (ii) intensive animal husbandry, or
ee - os (J (ii) residential development involving a rural residential purpose’
ee (b) in the Regional Landscape and Rural Production Area for -
ae C] (i) anurban activity and not specified in section 2.4(2); or
{J (i) residential development involving a rural residential purpose and not
ee sage 7 specified in section 2.6(2)
@ : . me ae . (c} in the Rural Living Area for an urban activity and not specified in section 2.8(2);
by (d) in the Investigation Area for -
rr ore [) (i) an urban activity and not specified in section 2.10(2);
. ? . “ i ~ se : . : . ‘oe °
: ee, wet (} (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
(_} (ii) intensive animal husbandry
| oO - 1 (ii)-reconfiguring a lot .
_ On land in a Major Development Area in the Urban Footprint that is: .
(a) not included in a structure plan; and
_- {b) not specified in section 3.1(2). .
. © iii none of the above
Fisheries matters _ |24. The application involves: (tick the applicable boxes)
_ For more information refer to schedule 2of the iP _] (i) an assessable material change of use for aquaculture - complete Part O; of Form 1:
Reaulation. rm . ; : wo . :
“Unless you answered "none of the above" to Q21, (J (ii) assessable operational work that is the construction or raising of a waterway barrier -
the application requires assessment by the complete Part Os of Form 1; .
Repartment of Primary Indystcies and Fisher ws . me .
Gar Patol Rnmany ndusties and titers [_] {ii} assessable operational work completely or partly within a declared fish habitat area-
@ if an agency olher than DPISF is the assessment complete Part O2 of Form 1;
pene rte apnleaton inceeo [_] {iv) assessable operational work that is the removal, destruction or damage of a marine :
. (iv) and an ‘advice agency in relation to item (v}. plant - complete Part Oz of Form 1; :
(_}(v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a ;
es fish habitat area; *
, (vi) none of the above. —
: !
i
|
|
__ Page7
ee a 8 __ .Section 12
- INTEGRATED PLANNING ACT 1997 __ IDAS Assessment Ghecklist, Version 18.0, 10 November 2006
Integration of land use and public |22. The application involves: (tick the applicable box/es)~
; ia es refer to Guide 23, schedule 8A (] (i) a material change of use assessable against the planning scheme for a purpose
of the IPA, & schedule 2 of the IP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered ‘none of the above’, the schedule. ‘ :
‘ application triggers referral to QT as aconcimence | ’ . .
agency. CJ (ii) reconfiguring a lot—
. Lo. (] (a) on land that is completely or partly within a public transport corridor, and the
4 o _ total number of lots increases;
| eae . 4, ee (_](b) on land that is completely or partly within a future public transport corridor or .
sO an airport's public safety area;
- SL (J (c) on land that is within 400m of a public passenger transport facility or a future
- ne _ ite me public passenger transport facility, and the total site area is 5000m? or greater;
: wer ve [-] (4) _ for a residential purpose within the 25 ANEF contour for an airport:
. [}{e) for a residential purpose resulting in 100 or more allotments.
" ey [1] (iii) operational work assessable against the planning scheme, but not associated with a
mo material change of use mentioned in (i) above or reconfiguring 2 lot mentioned in (ii)
above, on land that—
So (J (a) is completely or partly within a public transport corridor or a future public
BA transport corridor; :
- . Se {J (b) _ will result in work that encroaches into an airport's operational airspace.
Let eo . (eh) none of the above, . @ os
Railway safety and efficiency 23. The application involves: {tick the applicable box/es\—~
Oe ee b cchetae oath See conta 8A {ia material change of use assessable against the planning scheme for a purpose
Unless you answered ‘none of the above", the mentioned in schedule 13D of the |P Regulation and exceeding the thresholds set by that
application triggers seferral 1o QT as a concurrence schedule. . '
agency. (_] (ii) reconfiguring a lot—
: (} (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) — on land that is within 400m of a Citytrain passenger railway station or a future .
Citytrain passenger railway station, and the total site area is 5000m2 or ‘
: greater;
(J (c) on tand that abuts rail corridor iand, commercial corridor tand or future railway :
; land, and the total number of lots increases;
(_] (d) - on land that abuts raif corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
[_J {e) on land that is completely or partly within 100m of, and abutting an approach :
to, a railway level crossing, and the total number of lots increases; ;
(J (f} for a residential purpose resulting in 100 or more allotments.
{_] (ili) operational work assessable against the planning scheme, but not associated with a © “
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on iand that—
(} (a) is completely or partly within rail corridor and or commercial corridor tand, and ;
the work is not for rail transport infrastructure or other rail infrastructure;
‘ (_] (b) is completely or partly within future railway land, or a railway tunnel easement;
CJ (c) abuts rail corridor land, commercial corridor land or future railway land, and \
an the work is within 25m of the railway boundary. .
{iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to - :
For more information refer to schedule 2of the !P Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
Unless you answered ‘none of the above", the CI) a material change of use assessable against the planning scheme and not associated
equation. . . ° . : : Lf
apptication triggers referral to the holder of pipeline with reconfiguring a tot, and any structure or work will be located wholly or partly in the ;
licence No 1 issued under the Petroleum Act 1923, easement. :
currently Santos QNT Ply Lid, for advice. 0 (i) reconfiguring a lot ;
L_] (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the '
ae ofthe above.
ork is located wholly or partly in the easement. ‘
t
t
Page 8Section 13
, INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
' Koala habitat area 25. The application involves: (tick the applicable box/es}—
fer nore ran Pw (_} (i) a material change of usé of premises in a koala conservation area or koala
. sustainability area made assessable under a planning scheme, that is not for a domestic
ie aor ad “aon ofthe above’ ine activity and wil result in- .
Protection Agency as aconcurence agency. - [J (a) clearing of native vegetation over an area greater than 2500m?;
(] (b) anew building and any reasonably associated structure with a total footprint
, / greater than 1000m2;
. [_] {c} an extension to an existing building and any reasonably associated structure if
. ; the extension has a total footprint greater than 1000m2;
7 De, . (J (d) extracting gravel, rock or sand from an area greater than 5000m2,_
. "os ‘L] (e) excavating or filling an area greater than 5000m?; ,
; (3 (f additional traffic in a koala conservation area or koala sustainability area,
. between 6p.m. on a day and 6a.m. on the following day.
; (-) (ii) reconfiguring a Jot in a koala conservation area or koala sustainability.area that will =
oo : result in -
, . {"}{a) an increased number of lots;
ae [-] (b) clearing of native vegetation over an area greater than 2500m?.
oo (] (iti) operational work in a koala conservation area or koala sustainability area made
, assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with 0
@ . : reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
" So over an area greater than 2500m?.
_.t "(J (iv) operational work in a koala conservation area or koala sustainability area made _
‘ rr ae assessable under a planning scheme (not associated with a material change of use
, : of mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in —
[_] (a) clearing of native vegetation over an area greater than 2500m?;
, [J (b) extracting gravel, rock or sand from an area greater than 5000m?; .
- (c) excavating or filling an area greater than 5000m?.
FY none of the above.
Referral coordination 26. Does the-application trigger referral coordination?
An information request Tequires referral coordination rato
if the application involves - ‘
(i) 3 or more concurrence agencies; or. (_] YES, as the application: (tick the applicable box/es)
(ii) @ facility or area assessable under a '
planning scheme and prescribed in (_] (i) triggers 3 or more concurrence agencies:
schedule? or 8 of the IP Regulation; or = - . . .
(ii), develapment which is subject to an _] (i) involves a material change of use made assessable under a planning
application for preliminary approval scheme and prescribed in schedule 7 of the IP Regulation;
mentioned in $3.1.6 of the IPA.
For more information go to Guide? and Guide 6, [J {iii) involves a material change of use (other than a dwelling house, outbuilding
@ or farm building) made assessable under a planning scheme, or
reconfiguring a Jof, in an area prescribed in schedule 8 of the IP Regulation;
(J (iv) _ is for a pretiminary approval mentioned in $3.1.6 of the IPA
Referral agency responses priorto | 27. Did areferral agency give a referral agency response under s3.3.2 of the IPA before the
lodgement application was made to the assessment manager?
. Under s3.3.2 of IPA a referral agency may give a 7 NO ; . .
referral agency response on a matter within ats:
. forthe propetal is hate tthe acceso [YES - attach a copy of the referral agency/s response/s
. manager. : :
This is commonly the case where an application '
fequirés referral to a buiiding referral agency (eg.
Qid Fire and Rescue Service). . 1
, PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the 4
, completed IDAS Assessment Checklist (if applicable). :
OFFICE USE ONLY (applicable o assessment manager) _ |
| DATERECEIVED | “|” REFERENCE NUMBERIS
|
oo Page 9Section 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006 :
ene
SECTION 2 - BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only. .
Special fire services - generally 1. Anapplication may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
schedule 2A of the [P Regulation, (IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.
‘deemed refusal. a
Fire safety for budget accommodation... |2. ' An application may trigger referral to Qld Fire and Rescue Services as an advice agency if thé building work
For more information go to schedule 2 of he IP. - the subject of the application requires the installation of a fire safety system for a budget accommodation
Reaulation . , building. .
Spray painting oe 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency ;
For more information go to schedule 2 of the IP - if the application involves a workplace incorporating spray painting.
Regulation : .
Retail meat.premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to’schedule 2 of the IP retail meat premises. . .
Regutation _O . :
Private health facilities : ‘|5. Anapplication may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facility.
Regulation . ee : .
Workplace area less than 2.3m? 16. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if thd
For more information go to schedule 2 of tha IP” application involves a work place area less that 2.3m2.
Regulation ; . .
Land contiguous to a State-controlled 7. An-application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road © . * - agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the [P : .
Requlalion :
Pastoral workers accommodation |8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more infarmation go to schedule 2.of the (P if the application involves pastoral workers accommodation.
Regulation
Child care centre 9, An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP application involves a childcare centre. ‘
Regulation :
Coasta! development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line®2.
Regulation :
Heritage ; 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedute 2 of the |P involves a heritage registered place.
Regulation
Fisheries matters "142. An application may trigger referral to the Department of Primary industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
. habitat area.
integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?
For mare information go to schedule 2 of the IP , .
Regulation
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
For more information go to schedule 2 of the !P involves future railway land. .
Regulation .
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The loca! goverment, as the concurrence agency, is required to assess and provide a response for the fotlowing building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :
particular building work for single * for a single detached class 1 building or class 10 structure; and
detached class 1 building or class 10 » the Socal government has declared by resolution the following:
building or structure - the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 tabte 1 of the the locality; and ,
IP Regulation. ; — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a locatit :
deemed approval, Y-
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
% Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilitias”.
Page 10Section 15
4 -
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checkist, Version 18.0, 10 November 2006
Whether particular buildings maybe |16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes - feferral to the local government as the concurrence agency. :
For more information go to schedule 2 table 1 of tha
IP Regulation. ‘ , ,
Assessment period 15 days. No response is a ‘
deemed refusal, me
Design and siting _.° | 17. An application may trigger referral to the local government as the concurrence agency if the building work
For mora information go to schedile 2 table ofihe does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
Regulation . ° 3° *.% (148. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period Sdays. NoresponseSa@_ “| does not comply with the qualitative statement for building clearance and site cover.
deemed refs: = * = - = "21 19. An application may trigger referral to the local government as the concurrence agency if the building work
, OE does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Se Development Code, part 110r12..
Fire safety in particular budget - =| 20. An application may trigger referral to the local government as the concurrence agency to determine the
‘accommodation buildings cS building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table tothe’ been completed.
IP-Requiation. ne
Assessment period 15 days. Noresponseis a”. | .
deemedrelusa.,
Higher risk personal appearance: . {21. An application may trigger referral to the local government as the concurrence agency to determine if the ©
Hservices 5°. is Spar. i} building work .
| For mote information go to schedule’? table 1 of tha * — complies with the performance criteria of the Queensland Development code part 15; and
@ IP Reaulation andthe QOG pattS.% +, * — the work does not comply with an acceptable solution stated in the part. .
Assessment period 45 days: No-responseis a.> ..-
deemed refusal. Cee kd . .
Building work for residential service “122, ° An application for building work for premises in which residential care service under the Residential .
For tora information go'to sthédule 2‘tabie 4 of the” Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
IP Regulalign“and the QHC part 20."7 referral to the local government as the concurrence agency.
Assessment petiod 15 days. Noresponseis a : |
deemed refusal. * ’ SO :
Building work for removal or -| 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 tabte 4 of the
IP Regulation -
Assessment period 5 days. No tespanse is a
deemed refusal. :
Building-work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the ;
designated rainwater tank area building work or structure complies with the relevant performance criteria if -
For more information go te schedule 2 table 1 of the * Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant ,
1P Regulation and the GDC part 25. ‘building work, in a designated rainwater tank area; and
Assessment period 15 days. No response is a » Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable :
degmed refusal "solution for a relevant performance criteria.
f
1
|
|
4
|
— Page 11 . ;Section 16
* my 1385 3009 2002
energex
bo bor se) Brebene Queensland 4001
Certificate for Electricity Supply for Minor Developments
(4 Lots or less)
Development Details
a. Subdivider’s Name Ausmar Homes
"Registered Address = POBOX418
Corey sti(‘éSSOC;*;*;*;™;*;*#@OStee:*=*«*«SSS*OO*”*”*”O:™”™SC™
b= Locality of Subdivision Oreaila Cresent
oo SuniseBeach 7
¢ Real Property Descriptiori Proposed Lots 1 & 2
e_ —CanceliingLot 161RP220508
” No. of Allotments 2
e Identification of Existing Reticulation and required action —
(2 OK for OH service (a property pole may be required) EE a
: [C] OH same side of street — OK for OH service EO a
[] OH extension required (includes installation of Cross Street pole) _ BO : -
“C1UG existing — no further action required OE ——
— (Od uG pillar from OH required - ee oo
[UG extension required 7 a a a
(J Customer ‘s property pole is required —_ _ _
Oj Cross Street pole is required a oo
e OH = ENERGEX Overhead Network UG = ENERGEX Underground Network _ oo
Additional Conditions / Comments
Loti tobeOHSenice from P6414
— Let2toOH SewicefromPSP644 TSS
Certification
EN€RGEX certifies that the above named Subdivider has ~
([] Paid a capital contribution in full and made arrangement with ENERGEX for the provisions of the supply of electricity to
the,froposed subdivision or
E] Supply is available under standard tariff conditions.
oe ee
Name lan Reeves-Smith
"Position " CustomerCor ne ion Officer OE
Te ee
Signature ( 4 NG} _ Date 22/01/2007Section 17
RECEIVED
cu JAN 2007
29 January 2007 Ans’d Transfield Services (Australia) Pty Ltd
eee ABN 11093 114 553
Ashburner Francis P/L Locked Mail Bag 1,
PO BOX 325 Geebung QLD 4034
Nambour QLD 4560 PH : 07 3246 6867 Facsimile : 07 3246 6801
Facsimile : 754761844 Our ref) CONF2785
Attention: Richard Marsh Your ref
Dear Sir/Madam
® TELECOMMUNICATIONS INFRASTRUCTURE PROVISIONING CONFIRMATION
Telstra Corporation Limited confirms that telecommunications network infrastructure has been
provisioned to the following development:
LOTS NUMBERED PLAN NUMBER
jot 1 & 2 cancelling lot 161 RP220508
LOCATION
Orealila Cresent Sunrise Beach 4567 QLD
This confirmation is issued for this development only and is issued and given solely on the basis of
the information provided by to Telstra Corporation Limited as at the date of this confirmation.
} Additional works may still be required in order for telecommunications services to be
provided to customers in the development and these works will be carried out at Telstra’s
sole discretion.
Telstra Corporation Limited and the contractor issuing this letter on its behalf is not responsible to
or Ashburner Francis P/L , a recipient of this confirmation or anyone else for any loss suffered in
connection with this confirmation or any of the content and excludes. to the maximum extent
permitted by law, any liability which may arise as a result of the issue of this confirmation or its
content.
lf you have any enquiries or require any further information please contact me at the above
address.
Sincerely,
Fox a ae
Ally Williams
Transfield Services (Australia) Pty Limited
Telecommunication Services
On Behalf Of Telstra CorporationSection 18
DRAWING SIZE — A2 | Revieion | [Descripfon S~=*dY Date
P|
a
|
Mott Di /06/AO8 42 AM WIS-Nowg
1. Do not scale trom this drawing. 1. All sorkmonshi and moterials shall be in accordance with AS1720 and
2. All dimensions in midimetres ASIG84.
3. Setting out dimensions are io be obtained from the architectural 2. All timber framing and minimum sizes undess indicoted on these drawings
drowings. sholl be in accordance with N3 Timber Froming Manual.
4. Any discrepancies between these drawing ond the architectural drawings 3. All timber unless noted otherwise shall be seasoned.
are to be referred to the engineer immediately, 4, All timber stored on sile shall be stacked clear of the ground ond shall
5. The builder is responsible for locating all existing services within and be protected from the weather.
adjacent the allotment and shod ensure thot all new works ore in 5. All bolted connections shall be fitted with galvonized mid steel washers.
accordence with the attached crilical depth fine diogram. 6. Temporary bracing and support is to be provided throughout the
6. This drawing is to be read in conynction with the specifications ond construction period until such stage that all members ore installed and
requirements of SCG Consutting Engineers site investigation report. connected in accordance with delais provided.
(No.16115(S)) 7, NI timber shall be approprilely protected from insect ond/or moisture
7. Protection ogainst sub-terrainion termites is 10 be in accordance with attack at feast to the provision of the building code of Ausirdia and
the architects detots. AS3660 - Protection fram Sub~Terronean Termites.
8. All excavations ore to remain dry ond tree of all loose materia! prior to B, Pre-fabricated roof irusses ore to be designed and monufactured by a
the placement of concrete, specialist contractor. Trusses io be braced in accordance with the
CONCRETE : monutoclusers requirements.
1. All workmanship and materials shall comply with AS3600 - Concrete 9. Floor joists exceeding 150mm in depth shall have solid blocking atong the
Structures ine of oll supporis and at mid spon for ofl spans exceeding 3.0m and at
2. Additives including FLY ASH con only be added to the concrete upon the 1/3 points for spons exceeding 4.2m.
approval of the engineer. 10. All framing anchors, fixing plotes, noiling plates, joist hongers to be
3. Al concrete shof be normal class concrete unless noted otherwise. galvanised minimum or stoinless steet where construction within 2.0 km
Concrete grades, maximum skumps ond moximum aggregate size ave as codus of open coostal areos.
follows: it. Gang” nailed splice plates not permilted for exterior limber beams,
Footings ~ 20MPo, mox sump 100mm & 20mm mox. ogg. size.
Ground Floor Slabs 100Thk. - 25MPo, mox. slump BOmm & 20mm mox. 1, All Rorkmanship shall be in accordance with AS4100 with oll members and
agg. size. seclions being new and free of rust ond damoge. Any voriation to this musi
Members >100Thk - 40MPo, max. sump, 80mm & 20mm mox. agg. size.. be confiemed in writing by the engineer prior to any work commencing.
Blockwork Grout - N20, mox. slump, 100mm & tOmm max. agg. size. 2. All sleetwork untess noted otherwise shall cleoned of rust ond mid scale
4. All concrete members greater than 100mm in thickness must be ond coated with one coot of ROZP.
mechanically vibroled. 3. Exposed steelwork including bolts should be hot dipped galvanized in
5. in no instance sholl the concrete be WETTED UP prior to or during accordance with AS4791/2 os applicable.
placement.
4. All bolts shalt be in occordonce with ASI1I1. Unless noted otherwise all
6. Slob concrete shall be cured for o minimum of seven (7) days by on bolts shalt be grade 4.65 (S-snug tight) galvanized. Temporary bracing ond
approved method. Deto#s avodoble upon request. support sholl be provided until all bolis are inslotled ond tensioned.
7. Formwork stripping and back-propping of suspended floor stabs to the 5. All SHS, RHS and CHS sections 10 be of minimum strength grade C350 in
opproval of the engineer. accordance with ASH63.
1. The fodlowing marks are used to identily the vorious reinforcing steels 6, All welding sholt be carried oui by a specialist tradesmen in workshop
conditions in accordonce with AS2717. On-site welding is only permitted
used, governing standard for use alse listed; folowing prior approval from the engineer. Unless noted otherwise od welds
TM - Trench Mesh, min 450MPa {ASt304) ore to be 5.0mm continuous fillet welds (CF.W.).
F — Mesh/Fobric, min. 450MPa (AS15304) 7. The engineer is to be privided with steelwork shop drawings for approval
N — Beformed bas, min. SOQMPa (AS1302) prior to fabrication,
R ~ Plain bar, min 250MPa (AS1302) 1, Ad materials ond workmanship to be in accordance with AS3700 1998.
W - hord drawn wire, min 450MPo (AS1303)
2. Ail reinforcement shal be chaired, tied ond restroined in the correct 2. Minimum masonry strength fuc=15upa
lacation to ensure no movement during concrete placement. Slob mesh 3 Mortar mix 1: 1/2 : 5 (cement: lime: song)
chats ot 800mm ctrs. max in both directions, 4. Al cores to be cleaned and free of of mortar fins prior to grouting via
3, Minimum cover to reinforcement is os follows: cleon-out blocks at the base af the wol.
Footings & Piers - 40mm all faces 5. Minimum Grout strength f'c=20MPa (300kg/m3 min. cement) with o
Slobs on ground - 30mm top (internal surfoces) maximum aggregate size of 10mm. Compact grout down fist depth of core
- 30mm bottom (over poly. DPM) wilh phain rod of similar,
~ 40mm (exposed surfaces). 7, Minimum cover to reinforcing is 20mm from inside face of block. Bors to
Suspended Slabs - 30mm [internal surfaces). be arranged os shown on ossociated details.
- 40mm (exposed surfaces). 8. Walls to be waterproofed where indicaled on the drawings. Waterproof
Beams & Columns— 40mm (exposed susfoces), membranes installed in sirict accordance wilh the monufoctures
- 30mm (internal surfoces). requirements,
4, Minimum jap lengths ore 225mm (one panel plus 25mm) for slob mesh,
500mm for trench mesh ond 40 times the bor diometer or 500mm
whichever greater for reinforcing bors.
SOG struc LTING ENGINEERS
- Civil - geotechnical
ABN 40 098 481 899
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
[eee yam [ome wien [PfSection 19
SS aa ee
vision | Description
DRAWING SIZE - A2 |
7
Hy PROIR TO CONSTRUCTION ENGINEERS
iL iS TO REVIEW CONTOUR SERVERY
Ei WHERE NO RETAINING THE GARDEN (TO BE PROVIDED) ON BOTH ALOMENTS 1, Existing footpaths to be saw cut prior to removal
Cy iN TO CONFIRM THE DETAILS 2. Crossings are not designed for commercial vehicles
rid
WALL 'S 10 BE GROUT FILLED WITH INDICATES SHEET PILING, DESIGN AND CONTAINED HERE IN. 3. Concrete driveway to be 125mm thk. excluding any
N12-1200 CTRS VERT & HORIZ. INSTALLATION BY OTHERS. BUILDER 10 CONFIRM finished treatments, eg. stamping
Notural Ground Ne EXTENT REQUIRED TO SATISFY CRITICAL DEPTH 4, Concrete surface tolerance +5.0mm over 3.0m
LINE. PROTECTION OF NEIGHBOURING STRUCTRES. 5. Concrete N25 in accordance with AS 1379 ond AS
UE N12 @ 400 (MINIMUM VIBRATION TECHNIQUES TO BE USED. 3600
Horizontal & PRE-AUGERING OR BETTER) 10 BE WITHIN 6. Reinforcement fabric to AS 1304, placed central siab
Vertical PROPERTY BOUNDARY. BURDER TO MANTA STABRITY depth.
Waterproof wail. yb OF ALL NEIGHBOURING STRUCTURES, 7. Expansion joints to be 10mm wide wet tooled with
REFER CRINCAL DEPTH UNE
FOR GUIDANCE. every 2nd mesh wire cut along jont.
8. One access point permitted for each allotment.
i DRIVEWAY CROSS OVER DETAILS h i 9, For curved driveways, maximum grades apply to inside
rN
(mox} (min) TO BE IN ACCORDANCE TH w L. i 1 4. edge of curve
800 600 le fF. NOOSA SHIRE COUNCIL'S STD Qs » > = OM ase 10. All services to be located ond protected as required
1200 800 DRAWINGS 9005 & 9019, 32°93. pt a rs oe een —— —— ee ee SS x prior to work commencing
CY — +s — oe ee ee
——
1000 SLB2 Mesh {top 40 S08 BPVC SH ? = ur “ve 1 Oo ee aN
Me
yy
1500 APPROVED N.S.C a aamacennees-seme-ae om {8
wee)
Over, KERB ADAPTOR IN wes 1506 UPVC SW eo iia
Trem,
ua —— eee renee nen aenee Tene ee
ee Longitudindl bors il KA UNIT 1
I 400 Cog Ni2-400 ee i. a a * mae } POOL
EXISTING KERB ANO CRANNELL ss | BY
TO BE CUT AND REMOVED UY, g or ‘St aoe, Meee os OTHERS
H < 1500 ~ N12-400 AND NEW DRIVE WAY TO BE vA ros 150(W) GRATED pent lam poten ETT LL wn, “0 “ Ey THE CONTRACTOR 1S TO INSTALL APPROVED SAT RETENTION FENCES
H < 2000 ~ N16-400 INSTALLED TO N.S.C STANDARDS. pian PRIOR TO COMMENCING ANY EARTHWORKS. THE FENCE IS TD BE
es VA PES ET we CONSTRUCTED ALONG THE LOWEST SOUNDARY AND RETURMED UP SIDE
Ki2TM top & botio FOOTING DEPTH Ly Thisg ersagcear> i 8 7 GOQKW) GEO-FABRIC SILT BOUNDARIES TO ENSURE FULL STORMWATER ENTRAPMENT. SURFACE
Ee pad ,
*
RG ligs 450 ctrs Wot “Hep 20~ 40mm AGGREGATE é FAL ORIVEWAY ES BROPOSED. er rherer Existing timber FENCE, FIXED 10 SPIKES AND RUNOFF FROM WSTHIN THE ALLOTMENT MUST DRAIN TOWARDS THE
a Le--. PW PL Sa angeteeres "ans eg “ae BURIED 300 INTO STABLE FENCE AMD SHALL NOT ENTER NEGHBOURING ALLOTMENTS THROUGH
me weese—
Ni2 Full 350 Ni2-400 [1200 | 300 _| HARD STAND OVERLAY w? & apt EX: reiaining wail GROUND. THE USE OF SURFACE BUNDING OR SCOUR PROTECTED DRAINS. THE
length [ 1600 | 450 FOR DRIVE WAYS DURING vA LOW 1 = 4 dabei eter = ay f POOL, I} FENCE WUST REMAIN IN PLACE UTR. SUCH THE THAT FINSHED
[2000 | 450_| CONS! Yi; © P/{50(W) GRATED DRAIN adiaraganrasacctanenen tel yt | BY iI LANDSCAPING AMD DRAINAGE MEASURES ARE WSTALLED
B — Base Widt EXIGTING ORIVE WAY 70 BE a Lt — tree tend)
SMASHED AND REMOVED AND Li AO? | OTHERS Flt Wk ao
on
KERB AND CHANNEL TO BE > | so T= ll Ord FW i=
OY WE
Pd
REINSTATED 10 N.S.C APPROVAL. As) =f pa ana- dca aaa: DOL FI
itl od rll
Sry
RW-03; aa ener ne Hil ors ET
APPROVED N.S.C Ny + Dashed ie indicates sot * UNIT 2 if call i |
==
KERB ADAPTOR sfeb thickness for / jor 1200(L) 50 Sq, HDWO SPIKES, i= FG
Ben mp tw wn na a w= KATY q om | 1800 ctrs DRIVE 600 INTO =i
—
NS 1 4508 UPYC SW ws age — GROUND. HI Hl
ee ee oe oe sss Sse SS HUE
it Lace ee en ne ne wn aw os ns en nnd ——= = ie Soa a ee te we OP A Se
on en ten] (HT) at —— ell ao i le
ao co tag
ge” 1 | 1508 UPVC Sif nnn ac es en en a ae — ats TYPICAL SECTION ~ SILT FENCE
go" 1? D3. UNIT 1 | POOL
a SEE. BY
no” nae |
LEGEND , g GW maaan anny OTHERS Ground /
Y 1s BRATED DRAIN v1 aL | ee ae Vstable This footing
i} pad
ees
RW-03 Type 3 Retoining wall, refer details >! gd LZ y ‘LoT2 @hienn svt ed aa Sa a Ree without piers |
R POSE om a. een asaeaa=== is founded | The builder /contractor
Y FALL as ane Ronse we eee ane, Pr. = above critical shall confiem aft relevant
—-. peer PatEy eT alert oO
20-40men AGGREGATE ae banveway i x xisting timber This footing is Ese depth line and levels prior to
HARD STAND OVERLAY o SDTtIatiaastasy Porte BUPL
Fetba
CW Garden Wall Footing, refer 16115-S1 for details FOR DRIVE WAYS DURING of * WL. dabtdebdavtefsxssa ‘oO
CONSTRUCTION. y retaining wall founded below K is unstable. commencing works.
Indicates position of approved silt retension VA 150(#) GRATED DRAIN Brn 4 POOL critical line and is j-— Line of
as i Seeeee— eA e223 aR 1 BY i] stable.
fence. ExSIWG KERB AND CHANNEL LL a ta a } OTHERS Piers supporting strip [ iB | proposed Pool
| Excavation of
~—» TO BE CUT AND REMOVED vi ere ry 1 other trench.
Indicates direction of foll to surface levels. AND NEW DRIVE WAY TO BE [s® UNIT 2 footings of post pad
FALL INSTALLED #0 N.S.C STANDARDS. 1500 UPVC SW (HT} > footings founded into
HL
(HT) indicates 3000(Lt} under ground holding tanks. = 4 | apt Sy i — = A wane eee rt ee selected material and below onto 30 Degtees
2 2 ane a critical line ore considered
2 \ ae RI Sooo ene -- ——— oe SS eo
ape = a8 =— _- nn = en ao es wu" set ° stoble. NOTE:
Cw
FILLING NOTES: swt S ® CRITICAL DEPTH LINE THS DETAIL ALSO APPLIES 10
INDICATES SHEET PILING, DESIGN AND EXISTING FOUNDATIONS ON
NEIGHBOURING PROPERTIES. SHEET
~The site is to be scroped clear of all orgonic material and debris. Dashed line indicates INSTALLATION BY OTHERS. BUILDER TO CONFIRM PLING MUST BE INSTALLED WHERE
slob thickness for EXTENT REQUIRED TO SATISFY CRITICAL DEPTH EXISTING FOOTINGS WILL BE
— Any fil is to be cleon granular material (i.e. sond to a clayey sand tetioning wall. LINE. PROTECTION OF NEIGHBOURING STRUCTRES. FOUNDED ABOVE ANY EXCAVATION
in occordonce with AS!726) be free of ony organic material and have (MINIMUM VIBRATION TECHNIQUES 10 BE USED. Loy back Kerb & CRITICAL DEPTH LINE
Chonne} to N.S.C
a clay content of tess than 12% (Plasticity Index less thon 25%, Linear PRE-AUGERING OR BETTER) 10 BE WITHIN standard.
shrinkage of 15%). The proposed material is to be inspected by SCG PROPERTY BOUNDARY LINE. EXISTING MATCH EXISTING
Consulting Engineers prior to its removal to ensure its compatability. CROSS FALt 2 CROSS FALL
— The fil is to be ploced ond compocted in accordance with $000 SLB2 Mesh SHTE_PLAN —— ee EEE 150 Cee gomeuurng Euan &
AS3798-1996 to a level sufficient to achieve o Level 1 certification midde
with a minimum selotive field densily of 95% Copies of compaction (Scale 1:200) Extend sub-base 150mm
test results shalt be presented to SCG Consutling Engineers for passed back of kerb.
approval. th ere -= 7S LLL LLL LLL ABN 40 098 481 899
=~
- Filing ond compacting adjacent exisiting structures is to be in 2} pea 7. S, Reed 48 DUKE STREET SUNSHINE BEACH QLD.4567
strict accordance with the associated details ond specifcotions. Subgrade preperation,
= Areas where existing structures or trees are removed shall be ee le Al \ sone Depth determined PAVEMENT MATERIALS sefer general notes, Ph (07) 5447 5544 Fax (07) 5447 2634
bockfiled with the approved fill material compacted in accordance with Sow cut and cted on~site, 25mm Asphaltic Surfacing to N.S.C specifications
AS2B70-1996 to ochieve a minimum relative field density of 95% breakout BARRIER, SEM-MOUNTABLE, MOUNTABLE sand bed 150 Base course type 2.1 CBR 80
- Any loose or soft material uncovered in the site preparation shell back of kerb HERS & CHANNEL OR INVERT CROSSING. 150 Sub-base course type 2.3 CBR 45
be semoved ond replaced with the approved fill moteriol compacted in Sub-grade preperotion in accordonce with specifications /notes
accordance with AS2870-1996 {0 achieve o minimum relotive tield CROSSOVER DETAIL Y_ BACK KERB & CHANNEL
LA
densily of 95%. (Scale 1:20) ate: May 2006
- Site drainage and silt protection measures must be installed prior
to construction commencing.Section 20
DRAWING SIZE - A2
pT
U U LI ¥, °, e, Ue pf
BUILDER 70 MAINTAIN STABILITY OR DISTRURBED MATERIAL FILL TO CONSIST OF Mott 14/08/2006 11:34 ate 18115-S1—-S2.dag
OF ALL NEIGHBOURING STRUCTURES, REFER 16115-OWl FOR CLEAN SAND WETTED AND COMPACTEO IN 150mm
REFER CRITICAL DEPTH LINE AND EXTERNAL GARDEN WALLS LAYERS TO ACHIEVE 95% Min, FIELD DENSITY.
16115-OW1 FOR LOCATION AND GUIDANCE. COMPACTION RESULTS TO BE PRESENTED 10 THE
ALLOW FOR ANCHORED SHEET PILING BY AND RETAINING WALLS. ENGINEER FOR APPROVAL PRIOR TO SLAB
SPECIALIST CONTRACTOR. MINIMUM PREPERATIONS.
VIBRATION TECHNQUES 10 BE
USED. PRE-AUGERING OR BETTER.
FP-j RW=05 5p Le -}
eee eee ee ee ee ee ee
Cl re Bape fn naar |.
fe a a a a nn a a ee ee ee ee ee ee nn ee eee
rp_RW-02 fp FP FP 2/12 Horiz. Bor
to Bond Beam.
FP-1 Ny ft eet wees gtd nt top of Wall BAR SPACING
| ARAGE SCAR STEPPED | rp RW-01 ROALD. Spacing
77 AZ
OM IN 100 mm R.C I | FP Y N12 Vertical Bars,
TBR
FP—1 lee | | A= refer spacing table. [1800 | 600 |
ru
wae eee nee ee fe le top 30 cover. 1} rd if POOL BY 2000 | 800 _|
aan ee ee ee ee ee lig St82 mesh 1 | tu
|e
1 | IF-0 )} ti @ FP OTHERS Provide N12 N20 compacted grout
ht
le Za EN HL — tk it Horizontal bors at filing to all cores
ey = 1000 cirs.
—l WF 1 SF-02 -} | FP-} a] { \z GARDEN WALL REINFORCEMENT
FP tl W
Lt00 | 1600] PA ba
Ik "
" "
Te. FP~1 La i) FP | a P
Ia
{he Wl ali tt
SPTAA reese FraHs= #] i u ta
tl
FP-1 eure cu u 2 tl 10mm Joint, mastic Besser control
Letra > uw we " il
SF-02_ ‘Le eet i F-02 _ _| _ f fil if wall rendered,
" il
TJ. es Ta. bio or t=. i tk 1s L_ pint blocks.
ee ee es Anew - oot fee ee be
—J FP Poa ~="rzyE ay rrp i | wae tl eee a a ee eee ee ee ee eee
1 F if) it
tt
1200 : vl | It Block gorden wail to
4 tl
Prraloys 8 ny n rd
LEGEND Sy es t 1 | i | HS be built off pool shell. eee BE eee
n Ses
ti
1 |
as, Denotes stepdown, refer Architectural plans WF fp. F-02) FP-1FF4 b4 ta (ae refer engineers drq’s N12 Vertical bars, in
for step Ht. FP-} [FP W M i‘ tr for details. grout filled core both
WW u sides of joint.
% One piece of JL1)TM fixed to underside of i Ce ee —_—— ro th cre Se it
OE meee ee ee epee 1]
stab mesh @ 45 deg. to camer. Length as -1 Ll ir IF-01 1 | | FP ty POOL BY
vi
indicoted. ba 1 | 1600 1 | mt OTHERS Existing timber (PROVIDE AT 6.0m CTRS MAX)
Ss 30K w} x 400(d} internal slab beams refer ---d_ lie i f= 100 mm R.C. I} it retaining wo
ae wee nee ee ee Li y 1} ra
It
drawing S2 for details FP-1 SLB2 mesh —
it
¥-01 350(#)x450(D) Perimeter Footing sefer | ARAGE SAG 3 top 30 cover bl it Cast-in starter bor
drawing S2 for details STEPPED wm _| FP Rw-01 bed refer bar spacing
MN
STERNAL FFL
table.
SF-02 500(W)x450(D) Strip Footing refer drawing FP-1 It Pk, i FOOTING DEPTH
$2 for details | SO Den
F-01 350(W)x45Q(D) Internat Footing refer drawing FP ——+l FP | 1200 | 450
F-02 $2 for details ne | i et Rw-02 FP | 2000 | 750 _|
5Q0(W)x45Q(D) Internol Footing refer drawing
$2 for details rw re ea ee ee ee ee ee ee ee ee ——— a a a a a a ee ee ee ee ee ee ee ee ee ne ee ee ee ee ee eee Trench mesh 3Li1TM top
RW-O1 Type 1 Retaining wall, refer S2 for detods =] FP-} RW-05 F -4 FP-1 FP-3 & bottom or equivalent.
RW-02 Type 2 Retaining wall, refer S2 for deiails Omit footing piers where RE ligatures @ 900mm centres.
RW-04 Type 4 Retaining wall, refer S2 for detoils PRIOR 10 CONSTRUCTION ENGINEERS footing is founded 300mm into L ws
IS TO REWEW CONTOUR SERVEY Natural Medium Dense Sand.
RW-05 Type 5 Retaining wall, refer S2 for details (TO BE PROVIDED) ON BOTH
Garden Wall Fooling refer drawing for details ALOTMENTS IN TO CONFIRM THE GROUND FLOOR PLAN TYPICAL SECTION ~ GWE
DETAILS CONTAINED HERE IN.
Widen footing to dimensions shown Ground /
provide 2xSLB2 mesh sheets bottom, pad This footing THIS DRAWING AND ASSOCIATED DETAILS
ta! extend footing cage through. This footing . Unstable withoul piers The builder /contractor MUST BE READ IN CONJUNCTION WITH THE
is founded
Denotes wet tooled joint 10 terrace slab, refer above critical shall confirm alt relevant NOTES CONTAINED ON 16115-N.
to details on drawing S2. founded below Stobdle kh depth line and levels prior to
is unstable. commencing works.
125 Thk. Driveway slab on compacted criticat line ond is |~— ne of
materia!, SL82 mesh, top 40 cover, 0 - 1200 None required stoble. | proposed Pool DEBU
Flexible joint against masonry/concrete. 1200 - 2400 2 - N12, RE Ligs 600ct Piers supporting strip [ ie Excavation or ED ALT CONSULTING S
2400 - 4500 4 - N12, R6 Ligs 600ct: other trench, SG 3 ENGINEERS
FP-t 450 dia. concrete footing piers, 2.0m ctrs ~ Pres reinforcement to be b@ HI ond be cogged and inpped 400 footings or post pad Structural - civil - hn
max. t800{D) or founded 300 into NATURAL oth footing top reinforcement Som footings founded into ABN 40 098 481 899
MEDIUM DENSE SILTY SANDS, omit where selected materiat and betow Horizontal 30 Degrees
footings founded = into NATURAL MEDIUM critical line are considered 18 DUKE STREET SUNSHINE BEACH QLD.4567
stable.
NOTE: Ph (07) 5447 5544 Fax (07) 5447 2634
FP 350 dio. concrete footing piers, 2.0m ctes D LIN THIS DETAIL ALSO APPLIES 10
max. founded 300 into NA
DENSE SILTY SANDS, omit where footings EXISTING FOUNDATIONS ON ALL FOOTINGS ARE TO BE FOUNDED 300mm INTO
founded 300 into NATURAL MEDIUM DENSE NEIGHBOURING PROPERTIES. SHEET NATURAL MEDIUM SILTY SANDS OR
PILING MUST BE INSTALLED WHERE SUPPORTED ON 350¢ PIERS AT 2.0m ctrs
SALTY SANDS.
EXISTING FOOTINGS WILL BE FOUNDED 300mm INTO NATURAL MEDIUM DENSE [eee wane [ome wes
FOUNDED ABOVE ANY EXCAVATION SILTY SANDS.
CRITICAL DEPTH LINESection 21
DRAWING SIZE ~ A2
pT
Besser 'C block’ or a a 100 stab, & Loy po
mesh as Yepour Bossier Besser 'C block’ of 100 siab, ono |
Vit=—7 equivalent. it Malt 14/08/7008 15:31 AM 96195-S1~$2.d00g
Finished ground Ci
sloping away at Finished ground
1:20 min for Levelling layer. sloping awoy ai 3; 220 Concrete Slab 2000(L} Trench
100mm minimu TE Nr Tes 8 1:20 min for LTE Levelling Joyer. mesh trimmers ‘ox $
elf I eee 1500mm = minimu
600cirs. ==
olf Ni2 Storter Bors @ 1000mm 400 lo
Ol on centres,400mm Cogged Ends. Notusal_ Ground
RIT Top & bottom ee ee
R6 Ligs ot 900. Loe = 4L11™M Top & Bottom ut Wall bors cogged
R6 ligs 900 ¢/c 400 into stab.
$7 4506 Concrele piers, Waterproof wail, si
en 350¢ Concrete piers, a | focation and depth as Layer of slab mesh 220 Concrete Slob
location and depth os
noted on plan. noted on plan. L
-_ NG 190 Black N20 f Ni2 @ 400 fH |B | | Section
grout fil
\P/ (max)
- Ty Horizontal. 1208 Natural Ground
1500
—— ee eee ee —o ee eee eee ee All cores cleaned of i A Bors. 2400 Wall bors cogged
Teteeen ns
iV wv, debris and mortar if
ound Level oe ound Level fins via cleanout ii N12 @ 400 ctrs Slab mesh os per Waterproof wall. _ 400 into slab.
N12 Ties @ 600cirs. NI2 Ties @ 600cts. blocks, prior to paur. JI 8 bath directions footing plan. De”
iB
D N Ni CoE }H |B | A)
“LA
3LIVTM Top & bottom ALITTM Top & bottom 4) 190 Block N20 a8
R6 Ligs at 900, RB Ligs at 900. grout fill
La | 200mm free droining 400 Cog \48/ Ni2 @ 400 (max) (min)
backf with agi pipe to mmr Ti Horizontal. 1200 Y12-400
TYPICAL SECTION ~ (I-01) INTERNAL FOOTING a (| | G outiet. 450¢ Cancrete piers, Alt cores cleaned of i A Bars. 1900 1000 412-400
2400 1200 |¥16-400
220 Concrete Stab NI2 @ 400 ctrs debris and mortar
both directions location] and depth as fins via cleanout i [| Stab mesh as per
450 noted plan. blocks, prior to pour.
2 footing plan.
Natural Ground A
10mm Wet tooled 400 Thick Ni Wall bars cogged ~ {RW-05) Ri N Hl
control joint. Terrace slab.
400 into sfab.
Waterproof wall, ___} 200mm free draining Of
SL a a VELL) per bockfill with agi pipe to
Controlled Fil]
{7 zo oulet,
{7/7 2
Ey
Sfob mesh lowered to bottom TL fH | BL w both directions location] and depth as
{40 cover). Cut every second 190 Block N20 1 N12 @ 400 ctrs 4506 Cancrete piers,
wire along line of joint. grout fi il Ni2 @ 400 {mex} (min) Natural Ground noted oh plan.
TOOLED JOINT DETAIL debris and mortar fl Horizonta). 1200 800 12-400 Ul reinforcement Y12 @ 450
All cores cleaned of iL A Bars. 1500 1000 fY12-490 Waterproof wall. Longitudinal
2400 1200 |Y16~-400 —
500 typ. fins vio cleanout af M
ST
500 typ
ir pd blocks, prior to pour. Noli? Sob mesh os per N12 @ 400 190 Hollow block - grout filled core \e/
& at J footing plan. Longitudinal N20 compacted concrete bors as Hy NIG @ 400 centro.
noted.
12 comer bars as 200mm free draining an Lt
back#ill with agi pipe to
outlet.
Top 2 Bottom N12-400 290 Hollow block ~ grout filled core il
300 long legs.
St11TM N20 compacted concrete bars os
TED FOOTING CORNER DETAIL 3506 Concrete} piers, noted , 1200 tH) oe
: ae
location and depth os K ee!
+
noled on plan. 200mm free draining t N16 @ 200 with 55
backfill with agi pipe to L cover to back face. MUST BE READ IN CONJUNCTION WITH THE
Lap 3 - N12 bors outtet. rf Slab mesh as per footing THIS DRAWING AND ASSOCIATED DETAILS
All cores cleaned of
500mm with beam Vapour borrier — debris and mortor yA Longitudinal
trench mesh, continuous under slab fins via cleanout At plan on bar chairs @ reinforcement N12 NOTES CONTAINED ON 16115-N.
beam, blocks, prior to pour. 800mm centres, @4
ft ae & Botlom i
Vy Te SLB2 Top Pw een ee ee
ti,
wr er eee
i Lae Ground Level beeen i] N12 Storter Bars @ 400mm centres DEI CLD NG. S
Levelling Trench mesh 3L11TM (Class ’S’ or ‘M’ Site) or —— — — cogged 200mm top & bottom. SCG sinew ENGINEERS
Grade slab beam layer Trench Mesh 3L12TM (Class 'H’ Site), SLM Levelling layer such as sand ABN 40 098 481 899 civil - geotechnical
a3} base to perimeter Typical Secti Loy 4-~--J of crusher dust 18 DUKE STREET SUNSHINE BEACH OLD.4567
footing base, in 150mm kayess.
LL ZZ
nection to ti Strip footing hatched, a 3506 Concrete piers, Ph (07) 5447 5544 Fax (07) 5447 2634
location and depth os
As per plan. continued through WF. noted on plan. Title: Footing and Siab Details.
1500
TYPICAL SECTION ~ WF ~ (RW-0 oan | oe wise
Date: MSection 22
DRAWING SIZE - A2
po
|
SSE |
Mott 14/08/2008 11:30 AM 96115~S3-$0 dug
AUL LINTELS TIMBER FRAME SPECIFICATION N3
U.N.0. TO BE UPPER FLOOR - LOAD BEARING
90x45 (F17) Ko | MEMBER | SZE7GRADE™ [COMMENT
Top Plate 90x45 FB) + Not trenched
90x35 FB,
Studs ® 450 90 x 35 (F8) 2400(H) Mox.
Bim. Plate 90 x 45 (FB) Not trenched
90 x 35 (F8) Where on slab
Naggins 90 x 35 (FB) At 1100cts max.
co 1 yg) LOWER STOREY OF 2 - LOAD BEARING
gro a Top Plate 90 x 45 (FB Not trenched
o i | SAREE EUS URSA SUPT ET Studs © 450} 90 x 35 (FB 2700(H} Max.
Not notched
wee me en | Bim. Plate 90 x 35 (F8) Not trenched
mew LL
a! Noggins 90 x 35 (F8) At 1100cts max.
S| POOL BY NON-LOAD BEARING
Hp wig RC BEAM OVER 2/N16 } x (WB) Floor bearer over. OTHERS [EMBER [ SIZE7GRADE | COMMENT
_—S eer et Top Picte 90 x 35 (FB)
-_—— -—f Studs @ 450 | 90 x 35 (Fa)
Bim. Plate 90 x 35 (F8}
Noggins 90 x 35 (F8)
eI
> |
2/N16 y 14 7~
Ete
Frees
=] x! (V8)
Faipee 48)
@ |
=} Zi wee ie (WB) (We)
4evaue
14.4
2! a
wl
a |
19 NIG
— ae eae ae oe ee
y RC BEAM OVER _ + * cg) Floor bearer over.
2/N16
POOL BY
oo + LL ees 5 OTHERS
we eee
ace SresveerecvaneTistes
‘~~~ Tey
\ She fue)
Desa
A NU ri JOR Lie’ oh DOWN
EAE} VEEN
LEGEND
(P1) 89 x 89 x 5.0 Post (Galy} Position end plate os
shown where post
° Additional Vertical rod in grout filled block core supporting slab/beam
size and number os noled. ge. 250 Sq x 12 End THIS DRAWING AND ASSOCIATED DETAILS
BL! Block lintel refer to detois. Plate, 5.0 C.F.W 4/N12 MUST BE READ IN CONJUNCTION WITH THE
ties butt weld & cost NOTES CONTAINED ON 16115-N.
* (we) 3{No.) M10 Masonry bolts from bracing wall stud 7
to core filled block wall, equally spaced up stud.
SHS Post (Galyy>—- Issue
190 Grout Filled Block Wolls, N12 Verticals ond CONSTRUCTION
Horizontols at 800 ctrs and full perimeter of oll VERA
_ additional vertice's where noted on 10mm M.S. End 1/N12 S CONSULTING ENGINEERS
Plates, 5.0mm
190 Grout Filed Block Walls, N12 Verticals and bolts to slob, 65 CPW. A Compacted N20 ABN 40 098 481 899 fal ~ evil - nical
Horizontals at 400 ctrs ond fult perimeter of ail 2/Mt2 Chemset Concrete (hatched)
openings, additional verticals where noted on Min. slab edge hae 2/Ni2 18 DUKE STREET SUNSHINE BEACH QLD.4567
RCB Over plan. clearance. —_— 190 Ph (07) 5447 5544 Fax (07) 5447 2634
Reinforced concrete beam over refer 16115-S4
190 Grout Filled Block Retaining Walls, refer \=/ DETAIL Pity J | UN ¢ ea Te ~ BLi Title: Walt Framing, Bracing & Tie Down Plan.
footing details/sections for reinforcing detaits.
g
5
1
3Section 23
be A AIA _—_——
Ee
Malt 14/06 /2008 11:31 AM 16115-S1~S2.dey
Jt 245 x 45 (FI7) KD doists @ 400 ctrs.
FBI 240 x 63 (LVL) Floor Bearer.
FB2 230 x 85 HYNE 17C Floor Beorer
WP Joists size wall plate
DJ Double Joist, Naw laminate
— Hyspan LV ond Hybeom by Corler Holt Harvey
— All exposed timber 1o be H3 treoted.
PROVIDE DOUBLE JOISTS UNDER ALL LOAD
BEARING AND BRACING WALLS RUNNING
PARALLEL TO JOISTS.
PR
= Ryspan LVL and Hybeam by Corler Holt Harvey Trussed roof over
- MM exposed timber to be H3 treated conerete slab. Doubie joist located
Agfa fh ine et he hI AS AA hh Lh halle et ah ah hh he te | under bracing
——
_ wall and post
pei h hh ch ty te be hn ha hn +A}
JZ i.
| 4 ~ Loe 'TR
— OY Hs
4 —
—_—-— fi tet ee tenn
1
wl i i
”
it L/B
ea ethan nn be anhan a nena = a
——
— —_ eee eee a ee TAS 7 ae SS r =e a
ae
tA li aT 1
— (a " " it
RCB-01 (4 uy W
4
1 a| DU 1/8 S|) n
PeFSRTes Sor TSS — u
p34 ri ri il Lh TTTAE u WP
Lit I "1
4
breplbous ou A SOT TT TT, 200 THK
-
va! Pr
PIATI ITT Ss SAL OL EBE FEA FEIT Y ee a tt 6
tot a ail all Ae a oe 4 eon et eee 2 oad,
vA orl a (A) U "
{A) TI + ORL u uw
ra
fA il Wt
iS
bs lt
4 eLitebtes if 9
Sseessrt=
L | Du L/8 |"
RCB-01 _ 4 ul il FBI
u
u Ww fl
—— eee ae aie eee ere ¥2 ar Jenna anna 3 ee
— eae eae eae eee NaS +4] bm ewe eee i/B T SSS ee (a)
7 fot hem —— == == SIA SSe
fae "la H
I
"
i
il
al
| Loreen rrr
__f — ayes
PSs q --J 1 TR Erte
RR
Per
| Doudie pist located
i
LEGEND RP LTITA AVIA TT TET ILL TT TT PITT EITLA LAL ID under brocing
wall and post
Indicates the minimum structural depth of
200 THK the suspended stob offer falls for drainage.
THIS DRAWING AND ASSOCIATED DETAILS
tl Indicates foad bearing structure under MUST BE READ IN CONJUNCTION WITH THE
supporting the suspended slab. SLAB ARRANGMENT & FLOOR FRAMING PLAN NOTES CONTAINED ON 16115-N.
5O Step Indicates fine of stepdown to top surface
of the suspended slab.
Issue
"CONSTRUCTION
RCB-01 Reinforced concrete beam, refer DESUILD
16115-S5S for details 5 CONSULTING | '&
S ENGINEERS
Y Denotes 3/N12 bars 2000(L) fixed to structural - civil - geetechnica
bottom ond top steel. ABN 40 098 481 899
48 DUKE STREET SUNSHINE BEACH QLD.4567
“ 125x75x10 Angle cleats for timber beam Ph (07) 5447 5544 Fax (07) 5447 2634
connections, 2/MI6 each eg, BOmm Min. end
cleorance on afl timber holes.
(Pu) indicates support post under refer lower bracing
plan for size.
(LU) Indicates Linte! under refer lower bracing plon 5
for type/size. # Drg No. 16115-S4
L/B Indicates toad bearing wall under. 3The text continues on section 24.
Used in these records
00156930.001.pdfRelated documentPublic source context ↗
07/0386 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.