Council archive · source document
00156930.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
- INTEGRATED PLANNING ACT 1997 __ IDAS Assessment Ghecklist, Version 18.0, 10 November 2006
Integration of land use and public |22. The application involves: (tick the applicable box/es)~
; ia es refer to Guide 23, schedule 8A (] (i) a material change of use assessable against the planning scheme for a purpose
of the IPA, & schedule 2 of the IP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered ‘none of the above’, the schedule. ‘ :
‘ application triggers referral to QT as aconcimence | ’ . .
agency. CJ (ii) reconfiguring a lot—
. Lo. (] (a) on land that is completely or partly within a public transport corridor, and the
4 o _ total number of lots increases;
| eae . 4, ee (_](b) on land that is completely or partly within a future public transport corridor or .
sO an airport's public safety area;
- SL (J (c) on land that is within 400m of a public passenger transport facility or a future
- ne _ ite me public passenger transport facility, and the total site area is 5000m? or greater;
: wer ve [-] (4) _ for a residential purpose within the 25 ANEF contour for an airport:
. [}{e) for a residential purpose resulting in 100 or more allotments.
" ey [1] (iii) operational work assessable against the planning scheme, but not associated with a
mo material change of use mentioned in (i) above or reconfiguring 2 lot mentioned in (ii)
above, on land that—
So (J (a) is completely or partly within a public transport corridor or a future public
BA transport corridor; :
- . Se {J (b) _ will result in work that encroaches into an airport's operational airspace.
Let eo . (eh) none of the above, . @ os
Railway safety and efficiency 23. The application involves: {tick the applicable box/es\—~
Oe ee b cchetae oath See conta 8A {ia material change of use assessable against the planning scheme for a purpose
Unless you answered ‘none of the above", the mentioned in schedule 13D of the |P Regulation and exceeding the thresholds set by that
application triggers seferral 1o QT as a concurrence schedule. . '
agency. (_] (ii) reconfiguring a lot—
: (} (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) — on land that is within 400m of a Citytrain passenger railway station or a future .
Citytrain passenger railway station, and the total site area is 5000m2 or ‘
: greater;
(J (c) on tand that abuts rail corridor iand, commercial corridor tand or future railway :
; land, and the total number of lots increases;
(_] (d) - on land that abuts raif corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
[_J {e) on land that is completely or partly within 100m of, and abutting an approach :
to, a railway level crossing, and the total number of lots increases; ;
(J (f} for a residential purpose resulting in 100 or more allotments.
{_] (ili) operational work assessable against the planning scheme, but not associated with a © “
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on iand that—
(} (a) is completely or partly within rail corridor and or commercial corridor tand, and ;
the work is not for rail transport infrastructure or other rail infrastructure;
‘ (_] (b) is completely or partly within future railway land, or a railway tunnel easement;
CJ (c) abuts rail corridor land, commercial corridor land or future railway land, and \
an the work is within 25m of the railway boundary. .
{iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to - :
For more information refer to schedule 2of the !P Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
Unless you answered ‘none of the above", the CI) a material change of use assessable against the planning scheme and not associated
equation. . . ° . : : Lf
apptication triggers referral to the holder of pipeline with reconfiguring a tot, and any structure or work will be located wholly or partly in the ;
licence No 1 issued under the Petroleum Act 1923, easement. :
currently Santos QNT Ply Lid, for advice. 0 (i) reconfiguring a lot ;
L_] (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the '
ae ofthe above.
ork is located wholly or partly in the easement. ‘
t
t
Page 8See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156930.001.pdfRelated documentPublic source context ↗
07/0386 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.