AU SM —_ depending on weather and moisture content. “IMPORTANT”
ARC = Do not scale from drawings due to variation in paper,
CL) Wh l ELD
qe INNOVATIVE Use written dimensions only. MEASURE ON SITE TO CHECK ALL IMENSIONS
BY DrSTGmw
DISCREPANCIES
ANY DISCREPANCIES IN DIMENSIONS OF THESE DRAWINGS
SHOULD BE POINTED OUT TO THE DESIGNER AND ANY DETAILS
NOT SHOWN SHOULD BE REQUESTED BY THE BUILDER IN WRITING.
GENERAL NOTES
NO RESPONSIBILITY IS IMPLIED FOR ANY INACCURACIES
OR OMISSIONS FROM THESE DRAWINGS
MEASURE ON SITE TO CHECK ALL DIMENSIONS
PRIOR TO SETTING OUT
WATERPROOFING: Waterproofing to wet areas are to be carried out
The builder shall verify location of all services, in accordance with Standard AS 3740 & relevant BCA codes and requirements.
all dimensions and levels prior to commencement of any work .
TERMITE PROTECTION: The Builder shall provide for Termite protection
This building shall be constructed in accordance with the to be carried out by an approved licensed Pest control specialist in accordance
Australian Domestic Construction Manual (ADCM), Building Act
with AS 2057-1986 or the latest AS 3660-1
and Building Codes of Australia (BCA) relevant codes
and regulations, and in accordance to the Construction shall be in accordance to AS 1170.1, AS 1170.2 AS 1664,
TRADAC Timber Framing Manual and in accordance to AS 2870, AS 3600, AS 1480, AS2870-1996 and the standard Building Laws
all Manufacturer's specifications and installation details. and Building Code of Australia and relevant Codes and
the Australian Domestic Construction Manual
Set-out dimensions shown on the Site plan shall be confirmed
for the Terrain Category W41N
by the Builder before commencement of construction
& ordering of materials to be delivered on site.
TIE - DOWN information and Details
Positions of Down Pipes (DP) & storm water drains and levels are Refer to Structural Engineers
to be confirmed before final grading. The builder is to ensure that
surface water (rain water) is to be diverted from the envelope of RUBBISH & DEBRIS
the building on all sides at all times even during construction. All materials deemed to be unusable shall
be placed in a rubbish compound or a industrial
Sanitary drainage shall be in accordance to the local authority bin and removed from the site at the earliest opportunity.
requirements & with the prepared hydraulics drawings.
Check position of overflow relief gully & top of slab level if required. SCAFFOLDING
All scaffolding shall be in accordance to the
A final as build drawing shall be provided to the owner on Queensland Heath and Safety obligations
completion showing position of all services. and the Workplace Health and Safety Act 1995
FLASHINGS & WATERPROOFING WINDOWS
Fix all Windows and Doors in accord to manuf.
specifications.
MICHAEL PETRASCU DESIGNS No Description Date Lot 2 Orealla Cres GENERAL NOTES
—.. ——
Tel/Fax 07, 54472996 Email:[email protected] —— ee ee Sunrise Beach Qld Project number ~ 3006-SRB-AUH — —= — m_ -_— —
—-—— — ‘APRIL 2006 A12
Date
—
osa Heads 4567 Qld. BSA 703 843 — Peoposed Residences
——_—_-—_——
. P.O.Box 651 No -- —— — — ee Drawn by Author ~~ + ee
| Checked by : Checker —_. o
Scale ea
—See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156930.001.pdfRelated documentPublic source context ↗
07/0386 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.