Council archive · source document
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094
Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
BHA Report forLot 4 Noosa Civic, Hoffman Drive, Noosaville
APPENDIX 1
POTENTIAL BUSHFIRE ATTACK LEVEL
The Australian Standard, Construction of Buildings in Bushfire Prone Areas (AS 3959-2018) provides a suitable methodology
for identifying assessable vegetation and determining the requirements for the construction of buildings in order to improve
their resistance to bushfire attack from burning embers, radiant heat, flame contact and a combination of the three attack forms.
Method for Determination of BAL
The BAL was determined in accordance with Appendix B of AS 3959-2018, Detailed Method for Determining the Bushfire
Attack Level (BAL) – Method 2 (Normative):
Step 1: Determine the relevant FDI.
Step 2: Determine the vegetation classification, fuel loads.
Step 3: Determine the effective slope in degrees under the classified vegetation.
Step 4: Determine the slope in degrees of the land between the site and the classified vegetation.
Step 5: Determine the distance of the site from classified vegetation.
Step 6: Calculations.
Determination of BAL
Step 1. Relevant Fire Danger Index
The PSBA bushfire hazard mapping identifies the FFDI as 48.
Step 2. Vegetation Classification - Fuel Loads
The vegetation on Lot 4 has been cleared for development.
Available fuel weights were derived from PSBA State – Wide Bushfire Hazard (Bushfire Prone Area) Mapping. Fuel weight
was determined as: 28.4 tonne/hectare. Fuel weights were determined as:
• 15.4 tonne/hectare surface fuels
• 8.0 tonne/hectare near surface fuels
• 2.0 tonne/hectare elevated fuels
• 2.0 tonne/hectare bark fuels
• Total fuel weight = 28.4 tonne/hectare.
+ Bushfire assessments
+ Property vegetation assessments
+ Site planning for bushfire
+ Property management for bushfire
+ Bushfire management plans
42
Bushfire Planning Specalists - qldbushfireplanning.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.