Fencing and Walls
18. Any street fencing (which does not include the proposed internal fencing between the
landscaped buffer and outdoor play area) must not exceed 1.8 metres in height, be set back
an average of 1 metre and articulated to provide visual interest by stepping the design. Any
fencing on the front boundary must either:
a. not exceed a maximum height of 1.2 metres; or
b. be of open construction.
19. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Landscaping Works
20. The site must be landscaped generally in accordance with the approved Sanctuary Noosa
Landscape Concept and Plant Palette plans prepared by Jeremy Ferrier Landscape
Architect.
21. The landscape works must be undertaken in accordance with an Operational Works approval
and the Noosa Plan (subject to the approved plans which prevail to the extent of any
inconsistency with the Noosa Plan) for that specific area and must include in particular:
a. a vegetated landscape buffer on the Hofmann Drive frontage of the development site,
with a minimum width of 7 metres, to the extent provided for on the approved plans;
b. a minimum of one mature tree planted within the outdoor play area adjoining the
Hofmann Drive frontage; and
c. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage (subject to ensuring traffic safety and sight lines from the driveway
access are maintained).
22. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Bushfire Management
23. The development must be carried out in accordance with the approved Bushfire Hazard
Assessment.
24. Certification must be submitted to Council from a qualified person1 which certifies that the
development has been constructed in accordance with the bushfire management conditions
of this development approval.
Waste Management
25. Prior to Council issuing a Development Permit for Operational Works, submit to, and have
approved by Council a Waste Management Plan that allows for all waste collection and
servicing to occur on site. The Waste Management Plan must be prepared by a suitably
qualified person who is experienced in waste management and include in particular:
a. onsite collection of refuse/recycling must be undertaken using 1,100 litre, low noise
waste containers with regular servicing weekly to reduce the bin numbers on site;
b. onsite collection must be sympathetic to adjacent land uses and occur during hours
that will minimise amenity impacts to adjacent properties;
1 For the purpose of preparing a Bushfire Management Plan, and for certifying compliance with the bushfire
requirements of this development approval, a qualified person is considered to be an ecologist with a
minimum of 3 years current experience in the field of bushfire assessment and management.
Page 3 of 6
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.