Skip to the record
Every meeting, every word.

Council archive · source document

Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094

of 101

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 60, section 1. The text section number identifies this passage in the reader.

5 > Site Data

Site data has been obtained from the following sources of information:
•     Survey Data
•     Noosa Shire Council (NSC)
•     Satellite imagery
•     Relevant reports
•     Dial Before You Dig (DBYD).



6 > Stormwater

6.1       Flooding
Based on Noosa Shire Council flood mapping, the site is not subject to flooding from any sources.

6.2       Lawful Point of Discharge
The lawful point of discharge for the development site is the Noosa Civic stormwater network, South-
West of the site within the road corridor and the existing stormwater pipe running along the pedestrian
pathway to the east of the site. The existing Noosa Civic lawful point of discharge is the Creek tributary to
the South of the site, off Eenie Creek.

6.3       Site Based Stormwater Management Plan
The aim of the Stormwater Management Plan outlined below is to:
•     Prevent or minimise adverse social or environmental impacts from stormwater runoff originating
      from the proposed development.
•     Achieve acceptable levels of stormwater runoff quality and quantity.

The Stormwater Management Plan aims to identify Stormwater Quantity and Quality Best Management
Practice for the site and demonstrate that water quantity and quality impacts will be minimised in
receiving waters.




                                                                                                                                                           9
Inspired engineering

10 April 2025
                                                                                                                                             58
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx

Used in these records

About this file

File size
21.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdf · 21.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.