Stormwater collected from the roof will be harvested within the proposed 3kL slimline rainwater tank. This
volume will have the capacity for year-round toilet flushing reuse, meeting the water demand of
1070L/day. This approximation of water demand has been calculated using the information within Table
4 below.
Rainwater Tank Assumptions
Time 8 hours a day, 5 days a week
98 children
People
17 adults
Flush (L) 12L/single flush (adult)
Table 4 - Rainwater Tank Calculations
Pits and pipes will collect stormwater runoff within the childcare play areas, where the play areas slope
away from the proposed building and carpark. Pit and pipe network will convey runoff into the
bioretention basin and Jellyfish filters for treatment.
Treated water will discharge off site via two proposed stormwater connections. The treatment plan for
the proposed development is depicted on MPN Plan 9307-CP.1.01 attached in Appendix C, with MUSIC
excerpt in Figure 3.
Figure 3 – Treatment Plan
14
Inspired engineering
10 April 2025
63
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.