Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094

of 101

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 65, section 1. The text section number identifies this passage in the reader.

Stormwater collected from the roof will be harvested within the proposed 3kL slimline rainwater tank. This
volume will have the capacity for year-round toilet flushing reuse, meeting the water demand of
1070L/day. This approximation of water demand has been calculated using the information within Table
4 below.
                                                        Rainwater Tank Assumptions
                                   Time                                                          8 hours a day, 5 days a week
                                                                                                              98 children
                                  People
                                                                                                                17 adults
                                 Flush (L)                                                            12L/single flush (adult)
                                                  Table 4 - Rainwater Tank Calculations

Pits and pipes will collect stormwater runoff within the childcare play areas, where the play areas slope
away from the proposed building and carpark. Pit and pipe network will convey runoff into the
bioretention basin and Jellyfish filters for treatment.

Treated water will discharge off site via two proposed stormwater connections. The treatment plan for
the proposed development is depicted on MPN Plan 9307-CP.1.01 attached in Appendix C, with MUSIC
excerpt in Figure 3.




                                                            Figure 3 – Treatment Plan




                                                                                                                                                           14
Inspired engineering

10 April 2025
                                                                                                                                             63
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx

Used in these records

About this file

File size
21.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdf · 21.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.