Council archive · source document
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094
Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 67, section 1. The text section number identifies this passage in the reader.
6.4.3.9 Surfactants
Washing of cars is not expected on site for the proposed development, as a result surfactants should not
be an issue for the drainage system.
6.4.3.9.1 Heavy Metals
Heavy metals in stormwater runoff generally become attached to fine sediment. The bioretention basins
and the Jellyfish filters will remove the majority of this fine sediment. The removal of the fine sediment
should effectively remove most of the heavy metals in the runoff.
6.4.3.9.2 Pathogens/Faecal Coliforms
Domestic animals within the development will be under the control of their owners at all times and the
owners will be expected to clean up after them.
6.5 Proposed Stormwater Quality Treatment Devices
6.5.1 Locations
The location of the proposed stormwater quality treatment device is shown on MPN Plan 9307-CP.1.01,
attached in Appendix C.
6.5.2 Device and Size
The device type and size are depicted on MPN Plan 9307-CP.1.01, attached in Appendix C.
6.5.3 Operation
The bioretention basins operate by filtering runoff through densely planted surface vegetation, then
percolating the water through a sandy loam filter media with details as per MPN Plan 9307-CP.1.01,
attached in Appendix C. As the water is percolated through the soil, pollutants are captured by fine
filtration, adsorption and biological uptake.
The OceanProtect Jellyfish filters operate by using a high flow membrane cartridge filtration at low
driving head, with a large surface area to effectively filter stormwater. As the stormwater percolates
through the cartridges, pollutants, particulates, surface scums and floating oil and greases are captured
within the filter media. Once filtered through the media, the treated stormwater is directed to a collection
pipe.
16
Inspired engineering
10 April 2025
65
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.