Original PDF page 7, section 1. The text section number identifies this passage in the reader.
b. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels; and
c. a minimum of 10 bicycle spaces to be provided on site with provision made for end of
trip cycle facilities including 15 lockers and 1 shower cubicle with ancillary change room
available and accessible to all staff.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual.
34. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and Water by
Design’s Bioretention Technical Design Guidelines 2014, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in Stormwater Treatment Plan (Drawing No. CP. 1.01 Rev H) dated
10.04.2025;
b. bioretention device(s) which:
i. are designed generally in accordance with IPWEAQ Standard Drawing DS-073,
DS-075 and DS-076; and
ii. are provided with a free-draining outlet from the sub-soil drainage system;
c. the northern bioretention basin being replaced with a proprietary device (such as an
Ocean Project Jellyfish) located beneath carpark pavement;
d. the upstream property stormwater connection being rerouted so that it avoids
transversing through the site and aligns with stormwater infrastructure within the
pedestrian path; and
e. the footbridge over the bio-basin at the south-western corner being removed and a
pedestrian link being provided adjacent to the bio-basin (without the loss of car
parking).
35. The development shall be provided with approved permanent signage to educate the public
on the function of the bioretention basin. The wording for the signage for the bioretention
basin is to include: “BIORETENTION BASIN – This bioretention basin reduces the pollution
of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
nutrients discharged to Lake Weyba”.
36. All bioretention basins must be maintained in accordance with Water by Design’s Maintaining
Vegetated Stormwater Assets (Version 1) 2009. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
Easements
37. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
38. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
39. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 5 of 6
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.