Sealed Judgement Neate 1219 of 2020 · MCU18/0015
Very large file (94.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
i. contact details for the on-site manager;
ii. dispute resolution procedures;
h. for haulage operations involving significant volumes of fill material or excavated
material being transported onto or off the site: details on the location of external fill
sites/sources, the haulage route, type of vehicle to be utilised during filling operations
and frequency of usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense
It is acknowledged that the preliminary Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor employed to
construct the works and a final document will be required to be submitted at the Pre-Start
Meeting for the project.
Community Title Scheme - Private Infrastructure
12. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority.
Qualified Person
13. For the purpose of certifying geotechnical stability for the development, a qualified person is
considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
14. For the purpose of preparing a rehabilitation report or undertaking rehabilitation works, a
qualified person is considered to be a person with five years current experience in
revegetation and regeneration.
15. For the purpose of managing fauna protection, a qualified person is considered to be a
person who is a certified Fauna Spotter Catcher.
16. For the purpose of certifying sewerage infrastructure, a qualified person is considered to be
a person who is a RPEQ and has a minimum of 5 years experience in the field of stormwater
engineering.
Sustainability
17. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Performance Bond
18. Where the works include Council assets (construction of new or modifications to existing) a
portion of the performance bond will be retained as a “maintenance bond” as described in
Council’s Planning Scheme Policy 6 Engineering Design Standards. Alternatively, the
developer may submit a separate “maintenance bond” at the completion of the works.
The bond amount will be:
a. 5% of the agreed value of the works; or
b. $1500, whichever is the greater amount.
Performance Bond agreement
19. An applicant for a development application may make an agreement with an assessment
manager, referral agency or other person to establish the responsibilities, or secure the
performance, of a party to the agreement about a development condition.
17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sealed Judgement Neate 1219 of 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 94.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.