Sealed Judgement Neate 1219 of 2020 · MCU18/0015

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (94.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

11 August 2023
620.30359-L04-v0.1.docx



Connor O'Meara Solicitors
Level 4
10 Eagle Street
BRISBANE QLD 4000


Attention:       Alastair Storie


Dear Alastair

DAVID WILLIAM NEATE v NOOSA SHIRE COUNCIL
PLANNING & ENVIRONMENT COURT APPEAL No 1219 OF 2020
RESPONSE TO MEDIATION AGREEMENT
I refer to our recent discussions in respect of this matter, and the Mediation Agreement of 20 July 2023. In
accordance with the requirements of that agreement, I have prepared the following information relevant to the
construction of the sewer and stormwater drainage solutions for the site.

The construction methodology for the project will involve the following requirements:
•    Two directional drilling exercises will be required to install the sewer and stormwater drainage infrastructure
     needed to service the development.
•    In the first instance, it is expected that the sewer lines from each residence will connect to a private sewer
     running along the western boundary of the site either directly adjacent to the driveway or beneath it. Each
     residence will require a private pump to lift the sewage to the level of the driveway. Alternatively, it may
     be possible to have a single collection manhole at the northern end of the site which would collect all sewage
     from the contributing units using gravity flow, with then a single pump lift back to the main sewer. However,
     installation of this system will depend on the space available within the site outside of the building
     footprints.
•    The private sewer will be required to be installed during the construction phase for the driveway. At the
     northern end of the driveway, the sewer will be directionally drilled in a north to north-westerly direction
     to connect to existing sewer manhole SM2668739. The sewer line within the boundaries of the site will be
     the responsibility of body corporate, while that part west of the property boundary will be in public
     ownership. A possible alignment for this sewer is shown on the following plan.




                          SLR Consulting Australia Pty Ltd Level 16, 175 Eagle Street Brisbane QLD 4000 Australia (PO Box 26 Spring Hill QLD 4004)
                                                                                                T: +61 7 3858 4800 E: [email protected]
                                                                                                      www.slrconsulting.com ABN 29 001 584 612
                                                                                                                                       35

Used in these records

About this file

File size
94.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Sealed Judgement Neate 1219 of 2020.pdf · 94.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.