Council archive · source document
Sealed Judgement Neate 1219 of 2020 · MCU18/0015
Very large file (94.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
C B A D
9.0 20 25 30 32
15 25 34 36 38 40 42 45 48
49
Construction Plant & Equipment Only
(ecological rehabilitation area) outline of
9.0
50 adjacent
2.0
13.3
approved
2
125 m
16.4
development
10
2.0
3.0 2.0
3.2
Lot 2
34.3
5 m2 2.0 53
39.2
39.3
Stormwater 1,040 m2
42.0
Discharge Headwall 8.0 54
approx. 62 m2 dense planting
47.7
10 Allowable Building area with native species to
Envelope* 406 m2 screen
55 built form but not views
above built form. 60
(max. ht. NGL+ 8m)
14,159 m2 2.0 *The roof of any building/s on 59
Lot 256
must be57treated
58 to
2.0
reduce reflectivity.
3.0
# 151
2.0 Gate A
2.0
2.0
2.0
15
# 181
2.0
# 183
2.0
2.0
2.0 Blue outline denotes 10.2m
# 390
2.0
MRV swept path
2.0
5 2 1 (waste bin collection truck)
V1
2.0
2.0
V2 58 59
# 291
2.0
20
4 3
2.0 3,842 m2
6
6.6
Driveway
5.5
5.5
2.0
25 Gate B
4.0
30
5.0
31 3.0
2.0
32 33 34 V3
35 36 37
# 493
3.0
38 39
3.6
41 42 45 46 47 48 49 50 51 52 54 55 56 57 58
# 462
40
43
44
# 546
C B A D
Sewer Gravity Line to Manhole SM2668739 Red Shaded area denotes
8.8m MRV swept path
(fire or removals truck)
Indicative Construction Footprint
(includes area for scaffolding around building perimeter.)
I NNO V A T IV E Proposed Residential D e v e l o p m e n t - 27 Attunga Heights, Noosa, Q L D
P L A NNING
no t f or c o ns t r uc t io n Site Plan - Indicative Construction Footprint
S O L UT IO NS
www.townplanningsunshinecoast.com.au 1:750 @ A 3 / 26 June 2025 / 165 - DA - 0 58 - P
51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sealed Judgement Neate 1219 of 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 94.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.