Plan No. Rev. Plan/Document Name Date
165-DA-019 D Unit 3 – Level 3 (upper) Floor & Roof 14 May 2024
Plans
165-DA-020 D Unit 3 East Elevation 14 May 2024
165-DA-021 D Unit 4 – Level 1 (lower) Floor Plan 14 May 2024
165-DA-022 D Unit 4 – Level 2 & 3 Floor Plan 14 May 2024
165-DA-023 D Unit 4 – East Elevation 14 May 2024
165-DA-024 D Unit 5 & 6 – Level 1 (lower) Floor Plan 14 May 2024
165-DA-025 D Unit 5 & 6 – Level 2 (mid) Floor Plan 14 May 2024
165-DA-026 D Unit 5 & 6 – Level 3 (upper) Floor Plan 14 May 2024
165-DA-027 D Unit 6 – West Elevation 14 May 2024
- - Western Interface Setback and Path 2 May 2025
Separation Analysis
- - Report of Dr Trevor Johnson 11 August 2023
- - Report of Mr Jim Dixon 11 August 2023
- - Arbor Australis Consulting report 25 July 2024
- - Koala Tree Planting (v3.0) – Figures 26 June 2025
1, 1a, 1b and 1c
- - Impact to Trees on Site (v3.0) – 26 June 2025
Figures 2a, 2b and 2c
- - Nominal Maintenance Path Route 19 May 2025
Plan
Note: Any amended plans approved by the Chief Executive Officer in writing as required by
these conditions of approval will become Approved Plans for the purposes of this condition
and those Approved Plans will replace the corresponding superseded versions noted above
as relevant.
Performance Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $250,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee, less any costs incurred by Council in respect of enforcing performance of this
permit, will be returned following the commencement of the use and construction in
accordance with the Approved Plans is completed, provided that compliance has been
achieved with the conditions of approval at that time. Council reserves the right to call upon
the bond or guaranteed sum to effect compliance with conditions.
Building Envelope
5. All future dwellings on the approved lots must be sited and constructed in accordance with
the approved building envelopes and dwelling controls for each dwelling (BLE Footprint)
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sealed Judgement Neate 1219 of 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 94.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.