        (rig weight <2 tonne) should be considered. Rigs such as the M-Track or Belpile’s CFP
        rig would be suitable and provide more manoeuvrability.
        This will also allow all equipment movement to remain within the disturbance footprint.
    8. Provide tie between contiguous piles to maintain stability and allow excavation of lower
        platform.
        Local excavation using 5 tonne excavator.
        Stability analyses to assess requirements.
    9. Excavate lower platform with recommendations as for Step 6.
    10. Piling to retaining wall and structures on lower platform.
        Use of small rig (<2 tonne) is recommended. Rig to sit totally in cut.
        Where the finished floor level is above natural ground level, i.e., suspended floor, local
        preparation of a platform is recommended to suit small rig size. To minimise
        disturbance, cantilever construction is recommended for the structures in this area.
        Piling rig to be craned out on completion.

Reference to Figure 4 produced by Dr Philip Shaw highlights the locations of cut, fill and
retaining structures.

At each stage/step of development, it is recommended that the experienced on-site
geotechnical engineer provides certification of the stability.


We trust this meets the requirements of the mediation agreement. If there are any questions
on the above, please contact Jim Dixon of this office.



Yours faithfully,




P. J. DIXON (RPEQ 4150)
PRINCIPAL GEOTECHNICAL ENGINEER

for and on behalf of
SOIL SURVEYS ENGINEERING PTY LIMITED

Attachments.           1) Figure 1
                       2) Figure 2
                       3) Figure 3
                       4) Figure 4
                       5) Attachment C of Supplementary Joint Expert Report
                       6) Mediation Agreement




                                                                                               72

Used in these records

About this file

File size
94.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Sealed Judgement Neate 1219 of 2020.pdf · 94.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.