Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

1856-S01_S18

of 18

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                                                                                                                   WORKPLACE AND HEALTH SAFETY
     SEWER RETICULATION NOTES
                                                                                                                                                                                                                                                                                                   ALL WATER AND SEWER CONSTRUCTION WORK IS TO
                                                                                                                                                                                                                                                                                                   COMPLY WITH THE REQUIREMENTS OF QUEENSLAND WORK
     VEGETATION PROTECTION                                                                                                                                                                                                                                                                         HEALTH AND SAFETY ACT 2011
                                                                                                                                                                                                                                                                                                   CONTACT YOUR NEAREST OFFICER OF THE DIVISION OF
     A.         TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR TO                                                                                                                                                                                                                   WORKPLACE HEALTH & SAFETY FOR INFORMATION
                CONSTRUCTION, OR REPLACE IF DESTROYED.                                                                                                                                                                                                                                             PHONE:1300 362128
     B.         WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL
                BE CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED
                VERTICALLY FROM GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES
                                                                                                                                                                                                                                                                                                                    NOTE FOR OWNER
                PRIOR TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.
                                                                                                                                                                                                                                                                                                    SURVEY/BOUNDARY PEGS TO BE IN GROUND BEFORE
     C.         TREE ROOTS SHALL BE TUNNELED UNDER, RATHER THA.N SEVERED. IF ROOTS
                                                                                                                                                                                                                                                                                                    SEWER CONSTRUCTION
                ARE SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE
                FUNGICIDE. CONTACT RELEVANT ARBORIST FOR FURTHER ADVICE.
     D.         ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED
                ARBORIST.                                                                                                                                                                                                                                                                                                   TRAFFIC PLAN

                                                                                                                                                                                                                                                                                                    PRIOR TO COMMENCEMENT OF WORK, ARRANGE FOR
     SOIL                                                                                                                                                                                                                                                                                           APPROVED TRAFFIC PLAN AND SEEK APPROVAL FROM
                                                                                                                                                                                                                                                                                                    PLANNING & TRAFFIC BRANCH. TELEPHONE 340 34180 FOR
     A.         TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.                                                                                                                                                                                                                                 DETAILS. WORK MAY BE REQUIRED TO BE CARRIED OUT
     B.         CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE                                                                                                                                                                                                                           DURING WEEKENDS AND/OR LATE AT NIGHT ONLY”
                STORMWATER SYSTEM. THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT
                CONTROLS AROUND STOCKPILES.
     C.         ACID SULPHATE SOILS EXIST IN THE WORKS AREA. THE OUTPUTS FROM THE RISK
                                                                                                                                                                                                                                                                                                                          DBYD **CAUTION**
                ASSESSMENT BASED ON THE QUEENSLAND ACID SULPHATE SOIL TECHNICAL
                                                                                                                                                                                                                                                                                                   Approx. location of public utilities only. Exact location and depth
                MANUAL REQUIRES THAT ACID SULPHATE SOILS BE MANAGED AS FOLLOWS.
                                                                                                                                                                                                                                                                                                   to be determined on site by relevant authority personnel prior to
                                                                                                                                                                                                                                                                                                   commencing work.
     CREEK CROSSINGS                                                                                                                                                                                                                                                                                      TELSTRA        - Ph 1800 653 935
                                                                                                                                                                                                                                                                                                          ENERGEX        - Ph 3664 5400
     A.         SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM OF ANY                                                                                                                                                                                                                               UW            - Ph 1300 086 489
                EXCAVATION WORK.                                                                                                                                                                                                                                                                          GAS            - Ph 3323 7684
     B.         APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT SEDIMENT
                FROM ENTERING THE CREEK.
     C.         NO SOIL SHALL BE STOCKPILED WITHIN 5M OF THE CREEK.                                                                                                                                                                                                                                 DISCLAIMER
                                                                                                                                                                                                                                                                                                    WHILST EVERY EFFORT HAS BEEN MADE TO ENSURE THAT
                                                                                                                                                                                                                                                                                                    THE INFORMATION PROVIDED IN THIS DRAWINGS/DESIGN
     REHABILITATION                                                                                                                                                                                                                                                                                 WAS ACCURATE AT THE TIME IT WAS COMPILED, AS PART OF
                                                                                                                                                                                                                                                                                                    THE COUNCIL'S "AS CONSTRUCTED" RECORDS, IT REMAINS
     A.         PRE-DISTURBED SOIL PROFILES AND COMPACTION LEVELS SHALL BE                                                                                                                                                                                                                          THE RESPONSIBILITIES OF PROPERTY OWNERS AND THEIR
                REINSTATED.                                                                                                                                                                                                                                                                         CONTRACTORS, SUB- CONTRACTORS, EMPLOYEES,
     B.         PRE-DISTURBED VEGETATION PATTERNS SHALL BE RESTORED.                                                                                                                                                                                                                                SERVANTS AND AGENTS AS APPROPRIATE IN THE
                                                                                                                                                                                                                                                                                                    CIRCUMSTANCES TO MAKE ALL REASONABLE EFFORTS TO
     GENERAL NOTES                                                                                                                                                                                                                                                                                  ASCERTAIN THE PRECISE LOCATION OF EXISTING
                                                                                                                                                                                                                                                                                                    INFRASTRUCTURE INCLUDING WATER MAINS, SEWERS AND
                                                                                                                                                                                                                                                                                                    DRAINS BEFORE UNDERTAKING EXCAVATION OR
     G1  ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH EAST
         QUEENSLAND SEWERAGE CODE SPECIFICATIONS AND STANDARDS.                                                                                                                                                                                                                                     CONTRACTION WORK.
     G2 UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH THE                                                                                                                                                                                                                     USERS OF THE INFORMATION SHOULD BE AWARE THAT
         RELEVANT AUSTRALIAN STANDARDS.                                                                                                                                                                                                                                                             SINCE THE ORIGINAL RECORDING OF THE DEPTHS IN
     G3 THE CONSTRUCTION OF THE SEWERAGE WORK SHOWN ON THIS DRAWING SHALL BE                                                                                                                                                                                                                        RELATION TO GROUND LEVELS, CHANGES MAY HAVE
         SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. SEWERAGE WORKS NOT                                                                                                                                                                                                                    OCCURRED AS A RESULT OF SUBSEQUENT WORK OR
         COMPLYING WITH THIS REQUIREMENT WILL NOT BE PERMITTED TO CONNECT INTO THE SEQ                                                                                                                                                                                                              ACTIVITIES INVOLVING FILLING OR EXCAVATION.
         SERVICE PROVIDER SEWERAGE SYSTEM.                                                                                                                                                                                                                                                          CONSEQUENTLY, QUU TAKES NO RESPONSIBILITY FOR ANY
     G4 ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE CARRIED
                                                                                                                                                                                                                                                                                                    APPARENT ERROR OR INACCURACIES THAT ARE SHOWN TO
         OUT BY THE SEQ SERVICE PROVIDER AT THE DEVELOPER'S COST.
                                                                                                                                                                                                                                                                                                    EXIST AS AT THE DATE INFORMATION WAS PROVIDED OR AT
     G5 ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE "ACCEPTED
         PRODUCTS AND MATERIALS" LIST.                                                                                                                                                                                                                                                              A LATER DATE.
     G6 EACH NEW ALLOTMENT SHALL BE SERVED BY A DN150 PVC PROPERTY CONNECTION.                                                                                                                                                                                                                      THE ABOVE ALSO APPLIES TO LOCATION AND DEPTH OF
     G7 PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN IN THE                                                                                                                                                                                                                   OTHER PUBLIC UTILITIES.
         DRAWING.
     G8 PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A MINIMUM OF
         750MM. UNITY WATER REQUIRES MINIMUM EXTENSION OF 500MM INTO PROPERTY.
     G9 WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS NOT                                                                                                                                                                                                                  ALL ENVIRONMENTAL PROTECTION MEASURES SHOULD
         EXCEEDING 300MM (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE COMPACTION IS                                                                                                                                                                                                              BE IMPLEMENTED PRIOR TO COMMENCING ANY
         NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION WHEN TESTED IN                                                                                                                                                                                                                         CONSTRUCTION WORK INCLUDING CLEARING.
         ACCORDANCE WITH A.S/ 1289 (MODIFIED COMPACTION). TESTING SHALL BE CARRIED OUT
         AFTER EACH ALTERNATE LAYER, IN ALL SUCH CASES APPROVAL OF CONSTRUCTED SEWERS
         WILL NOT BE ISSUED BY THE SEQ SERVICE PROVIDER UNLESS CERTIFICATES ARE PRODUCED
         CERTIFYING THAT THE REQUIRED COMPACTION HAS BEEN ACHIEVED.
     G10 WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR STEEPER, BULKHEADS SHALL BE
         CONSTRUCTED IN ACCORDANCE WITH THE SEQ SEWER CODE.
     G11 THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING SERVICES WITH
         RELEVANT AUTHORITIES BEFORE COMMENCING WORKS.
     G12 SEWERS SHALL BE DISUSED/ABANDONED IN ACCORDANCE WITH PROCEDURES SET OUT IN
         THE SEQ SEWER CODE.
     G13 BENCH MARK AND LEVELS TO AHD.                                                                                                                                                                                                                                                        CAUTION -
     G14 PLACE DETECTABLE MARKER TAPE OVER ALL SEWER MAINS.                                                                                                                                                                                                                                   EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT
     G15 ALL SEWER MAINS OF 150DIA OF GREATER TO UNDERGO CCTV INSPECTION.                                                                                                                                                                                                                     LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE
                                                                                                                                                                                                                                                                                              PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
     CONSTRUCTION NOTES                                                                                                                                                                                                                                                                       THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
     1.         ALL PIPEWORK SHALL BE IN ACCORDANCE WITH SEQ                                                                                                                                                                                                                                  EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.
                ACCEPTED CIVIL PRODUCTS AND MATERIALS .
     2.         CONTRACTOR TO CONFIRM WITH UNITYWATER
     3.         SUPERINTENDENT FOR ANY REQUESTED CHANGES TO
                MATERIALS/CONSTRUCTION.
     4.         DESIGN TO COMPLY WITH CURRENT SEQ CODE AND
                UNITYWATER REQUIREMENTS.

                                                                                                                                                                                                                                                                       PROJECT:                                                                     JOB NUMBER
REV DATE DESCRIPTION                                 BY    CHKD DRAWN
                                                                    I GDETAL
                                                                           IS                                                  SCALE                                                APPROVED                                                                           PROPOSED SUBDIVISION                                                            1856
 A   18-03-20     FOR APPROVAL                        MS      CL                                                                                                                                                                                                       AT NOOSA CIVIC, WALTER HAY DRIVE, NOOSAVILLE
                                                                   DATUM               AHD                                                                                                                                                                                                                                                    SHEET:    2   OF    20
                                                                                                                                                                                                                                                                       FOR STOCKWELL PTY LTD
                                                                   DESIGN              MM                                                                                          .................                                                                                                                                         DRAWING NUMBER         REV
                                                                                                                                                                                                                                                                       DRAWING TITLE:
                                                                   DRAWN               MS                                                                                      Director: CAMERON LANDRETH
                                                                   DESIGN CHECK                                                                                                      (RPEQ 19358)           p 07 5443 8285                                             GENERAL NOTES                                                                S02                  A
                                                                                           CL
                                                                                                 This drawing is not to be copied or amended without written permission from                                e [email protected] w www.barlowshelley.com.au
                                                                   DATE               18-03-20   Barlow Shelley Consulting Engineers                                                                        a PO Box 899, Maroochydore,4558 ABN 89 215 591 077
Log in to download the original file

1856-S01_S18.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.