NOOSA COUNCIL IDAS Development Application Decision Notice 15 of 51
65. The EMP shall detail the Developer’s environmental policy and the proposed environmental management
system for the Site.
66. The EMP shall specify to the reasonable satisfaction of the Manager – Land Development:
66.1. the performance targets, including those derived from the Conditions and other requirements
arising from legislation and other approvals;
66.2. how the performance targets are to be achieved;
66.3. who is responsible;
66.4. when the performance targets will be satisfied;
66.5. how performance will be monitored;
66.6. reporting arrangements;
66.7. auditing arrangements;
66.8. how the requirements are to be incorporated into construction and works contracts;
66.9. how the Developer’s employees, contractors and the contractor’s employees will be informed and
trained with respect to the environmental protection requirements;
66.10. enforcement; and
66.11. penalties for non-compliance.
67. The EMP shall include a construction management plan for the Development prepared for the Site by a
suitably qualified consultant. This construction management plan shall be specific for the resort
construction and shall address the following issues to the reasonable satisfaction of the Manager – Land
Development:
67.1. construction staging and timing;
67.2. access and construction vehicle parking and traffic management;
67.3. water quality protection;
67.4. vegetation management & protection of vulnerable plant species;
67.5. fauna habitat and fauna corridor management;
67.6. environmental management in accordance with the Conditions and the EMP;
67.7. environmental protection requirements to be specified in all construction, rehabilitation,
landscaping and works contracts;
67.8. environmental safeguards and contingency plans to deal with accidental events and acts of god (ie
floods, landslides etc);
67.9. ensure that disturbed areas are confined to development areas and shall not encroach into the 10
metre setback to the creek (including stockpiling and temporary works);
67.10. safety;
67.11. responsibilities;
67.12. induction and training, including environmental protection requirements;
67.13. staged sediment and erosion control;
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8112a9b\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/823 - SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 303 KB (small file)
- File type
No other editions are linked here.