NOOSA COUNCIL IDAS Development Application Decision Notice 26 of 51
161.4. The garbage rate for the compactor bin will be based on a component for each unit or residence
equivalent to a private residence to cover costs other then the waste contractors service fee, a
component for provision and servicing of the compactor bin.
161.5. Council’s waste contractors will own, service and maintain the compactor bin and clean during
service for a price to be specified by Council.
161.6. The developer shall enter a lease agreement with the waste contractor for the supply and
maintenance of this compactor bin.
161.7. The compactor shall be serviced at a minimum frequency of once per week and Council will
nominate the service day to ensure service provision and be structured within existing runs for the
Ro-Ro collection vehicle. Additional services can be organised with 24 hours notice.
161.8. The compactor bin shall be refrigerated or more frequently serviced to avoid odours and fly
problems.
161.9. The developer will be responsibility for cleaning of all other bins.
161.10. The developer shall purchase and maintain all other bins.
161.11. The developer must provide a suitable bin wash area for the cleaning of all types of bins and
waste collection vehicles used on the site. The area is to be roofed and the floor is to fall to a
bucket trap with the waste pre-treated by a grease arrestor prior to discharge to sewer.
161.12. All street litter bins located throughout the development are to be supplied and serviced by the
developer.
162. Prior to the approval of various stages of works, the following additional details are required to be supplied
and approved by Council Officers:
162.1. A Waste Management Plan (construction) shall be submitted to Council as part of the Construction
Management Plan and approved by Manager Land Development prior to the issue of operational
works.
A Waste Management Plan (construction) is also required for construction of 15 or more dwelling
units or for any business use of greater than 500m².
Waste Management Plans (construction) is required to be submitted in accordance with Planning
Scheme Policy 11, Waste Management Plans see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste
materials. These shall be located so that they are convenient and safe to use. (Refer to Noosa
Council Waste Management Code).
The Plan shall contain the following information:
162.1.1. The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
162.1.2. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify contractor
materials volume (m³) *specify *specify and landfill site or
proposed re-use contractor and other disposal site
or on-site recycling outlet
recycling
methods
Excavation
material
Green waste
Bricks
Concrete
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8112a9b\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/823 - SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 303 KB (small file)
- File type
No other editions are linked here.