NOOSA COUNCIL IDAS Development Application Decision Notice 30 of 51
186. The Developer must, promptly after written request by the Council, carry out any necessary rectification
works, at the Developer’s cost, on roads in the vicinity of the Site where it can be reasonably
demonstrated that such roads have been damaged by construction vehicles involved in carrying out the
Development.
187. There shall be no pile driving on Site.
188. There shall be no diesel powered crane structures erected or used on Site other than mobile cranes.
189. There shall be no encroachment into the 10 metre creek setback zone. This requires that no construction
works can occur in this 10 metre setback, for example no batters, no excavations, no pipelines, no silt
fences or sediment controls, no diversion drains, no foundations, no retaining walls, no scaffolding, no
access for construction etc are permitted within the 10 metre setback, except for the three stormwater
outlets as shown on Drawing No. 05B320 SK.15 Issue A titled “Proposed Stormwater Headwall Layout
Plan” dated April 2006 and prepared by Qantec McWilliam. The construction works required to construct
these outlets will be minimised and shall be contained within a 6 metre wide corridor.
Construction Sequencing
190. A Construction Sequencing Management Plan shall be submitted in conjunction with an Operational
Works application for civil works. The report shall detail each stage required to construct the proposed
civil works and methods of stabilisation and erosion controls to ensure that sediments do not enter the
intermittent creek and Noosa Sound.
This management plan shall be prepared in conjunction with operational works drawings which shall
reflect the civil works staging. The plan shall also include detailed erosion and sediment control staging
plans, to be submitted with Operational Works application.
191. Building works shall not commence until services, one coat primer seal on roadways, building platforms
and retaining walls are completed and stabilised. These works shall be stabilised with turf or hydromulch
in high risk area, grass seeding with 80% cover in low risk areas and with mulch or geotextile in areas that
will be disturbed during building works. The applicant shall submit with the sediment and erosion control
plans, details of the various risk areas across the site and associated methods of stabilisation for those
differing risk areas.
192. The construction sequences are to be more or less sequential, although the construction period of some
of the elements may overlap and there may be advance works which are common to all sequences and to
the various separate components of the Development.
193. At all times the sequencing of construction and building works shall ensure that any areas that will be
exposed for more than 10 business days shall be stabilised. Erosion and sediment control measures must
be maintained for each stage and are of prime importance and shall be established prior to any other
works being undertaken.
Sediment and Erosion Control Plan
194. A detailed staged Sediment and Erosion Control Management Plan shall be prepared specifically for the
resort site by a Registered Professional Engineer of Queensland, having proper regard to the
Environmental Values of the Site and requirements of the EMP and shall be submitted in conjunction with
an Operational Works application for approval by the manager Land Development. The management plan
shall detail at a minimum, the following:
194.1. Staging of erosion and sediment control measures;
194.2. Sizing of sediment basins and control measures;
194.3. Clean water diversion provision around construction activity zones on- site;
194.4. Locations of all interceptor drains and cut-off drains;
194.5. Rehabilitation and remediation requirements; and
194.6. Contingency plans.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8112a9b\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/823 - SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 303 KB (small file)
- File type
No other editions are linked here.