NOOSA COUNCIL IDAS Development Application Decision Notice 35 of 51
224. A qualified geo-technical engineer shall undertake further assessment of areas of fissured clays and
provide details of engineering support that will reduce the risk of slope instability for the subject buildings.
The type of engineering support shall be designed to ensure no impacts on existing vegetation,
particularly within the 10 metre setback zone to the creek. An RPEQ shall design and certify that all
footing excavations have been undertaken to best practice and are structurally sound for the site
conditions.
225. An RPEQ shall design the footings for all building works that require earthworks within the fissured clay
areas as identified by Golder Associates. The RPEQ shall certify that these footing designs are
structurally sound for the site conditions.
226. The Developer shall provide to Council an assessment of the effects of de-watering of any basement
excavations for the Resort buildings.
Filling and Excavation
227. Detailed plans and specifications based on and generally in accordance with the Engineering Drawings in
relation to earthworks (and prepared after consultation with the Manager – Land Development) are to be
submitted with the relevant applications for either plumbing, drainage, building or operational works.
228. All filling and/or excavation works are to be carried out strictly in accordance with any development
permits for plumbing, drainage, building or operational works, and approved management plans.
229. Retention systems for the Resort Central Facilities Building and the Resort Residential Buildings are to be
as per details of geotechnical reports prepared by Golder Associates. Where required, excavated faces
in rock should have appropriate ground support measures to contain potentially unstable rock wedges.
These could include shotcrete, rock bolts, rock anchors or alternative engineering support systems.
Certification shall be submitted to Council following building works detailing that the engineering support
systems are stable and satisfactory for the life of the project.
230. Detailed plans and specifications detailing earthworks for all roads (and prepared after consultation with
the Manager – Land Development) are to be submitted with the relevant applications for either plumbing,
drainage, building or operational works.
231. Earthworks associated with all roads are to be completed in accordance with any development permits for
plumbing, drainage, operational or building works, and approved management plans.
232. Retaining walls in the resort area are to make provision for Koala movement through the area, where
applicable.
233. All proposed fill material is to be tested by an approved geotechnical testing authority (NATA registered)
and the results submitted for approval by the Manager - Land Development. Compaction and fill is to be
carried out under Level 1 supervision in accordance with Australian Standard – AS 3798 – 1996.
Following completion of filling, compaction tests are to be certified by an RPEQ and certification submitted
to Council. Development permits for building works will not be issued for areas of filling unless the fill
compaction tests are to the reasonable satisfaction of the Manager – Building Services.
234. Filling that will result in the pondage of water on or off the Site (other than any works associated with the
approved drainage system) will be prohibited.
235. All disturbed areas are to be revegetated within 10 days following completion of earthworks to reduce
erosion and transport of sediments.
236. All material removed from the Site is to be disposed of in an appropriate manner and only at locations
approved by a Local Government or the Environmental Protection Agency.
237. Contaminated soil currently contained within the containment cell on the site, shall be removed in
accordance with Environmental Protection Agency requirements.
238. All material stockpiles on the Site must be in a location approved in the Environmental Management Plan
or otherwise approved by the Manager – Land Development, which approval is not to be unreasonably
withheld.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8112a9b\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/823 - SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 303 KB (small file)
- File type
No other editions are linked here.