Lanscaping Specification URB-P0003847-000-SP-240719

of 60

Page text shows just the words. Original shows the document exactly as it was published.

        LANDSCAPE
        SPECIFICATION
        Sunrise Retirement Village
        6 Grasstree Court, Sunrise Beach, QLD 4567




Prepared for
BALMAIN & CO ON BEHALF OF KEYTON
DATE: 18.07.2024


URB-P0003847-000-SP
Log in to download the original file

Lanscaping Specification URB-P0003847-000-SP-240719.pdf · 1.5 MB (small file)

Full text of the other 59 pages

Page 2

 URBIS STAFF RESPONSIBLE FOR THIS REPORT WERE:
 Director                   Glen Power
 Associate Director         Cindy Pester
 Consultant                 Cassandra Friday
 Project Code               P0003847
 Report Number              000-SP


 DOCUMENT CONTROL
         REVISION                      DATE             DESCRIPTION                      WRITTEN BY                APPROVED BY
                                                              70% Design
              A                      20.02.2024                                        Cassandra Friday              Cindy Pester
                                                              Development
              B                      28.06.2024              For Information           Cassandra Friday              Cindy Pester
              C                      19.07.2024              For Approval              Cassandra Friday              Cindy Pester




                                Urbis’ Economic and Social Advisory team has received ISO 20252 Certification
                                for the provision of Economic and Social Research and Evaluation.
                                Certificate No.: MSR 603559



All information supplied to Urbis in order to conduct this research has been treated in the strictest confidence.
It shall only be used in this context and shall not be made available to third parties without client authorisation.
Confidential information has been stored securely and data provided by respondents, as well as their identity, has been treated in the
strictest confidence and all assurance given to respondents have been and shall be fulfilled.


© Urbis Pty Ltd
50 105 256 228

All Rights Reserved. No material may be reproduced without prior permission.

You must read the important disclaimer appearing within the body of this report.

urbis.com.au


 URBIS

 URB-P0003847-000-SP.docx                                                                                                                ii

Page 3

CONTENTS
CONTENTS ........................................................................................................................................................3

1.            NOTES TO THE CONTRACTOR .......................................................................................................1
              1.1.   Scope of Work .....................................................................................................................1
              1.2.   Definitions ............................................................................................................................1
              1.3.   Site Conditions .....................................................................................................................1

2.            QUALITY AND RESPONSIBILITIES .................................................................................................3
              2.1.   Environmental Protection .....................................................................................................3
              2.2.   Existing works ......................................................................................................................3
              2.3.   Quality & Regulations ..........................................................................................................3
              2.4.   Products and Materials ........................................................................................................4
              2.5.   Plant Procurement ...............................................................................................................4

3.            EXECUTION OF WORK .....................................................................................................................5
              3.1.   Earth works ..........................................................................................................................5
              3.2.   Setting Out ...........................................................................................................................5

4.            CRITICAL HOLD POINTS ..................................................................................................................6
              4.1.   Hold point schedule .............................................................................................................6

5.            EXISTING TREE PROTECTION ........................................................................................................8
              5.1.   General Specifications .........................................................................................................8

6.            TREE / PALM TRANSPLATING ........................................................................................................9
              6.1.    General Specifications .........................................................................................................9

7.            DRAINAGE .......................................................................................................................................10
              7.1.  General Specification .........................................................................................................10

8.            EDGES ..............................................................................................................................................11
              8.1.    General Specifications .......................................................................................................11
              8.2.    Edge Types ........................................................................................................................11

9.            PAVEMENT ......................................................................................................................................12
              9.1.  General Specifications .......................................................................................................12
              9.2.  Timber works .....................................................................................................................13
              9.3.  Concrete Works .................................................................................................................14
              9.4.  Pavement Profiles – Concrete ...........................................................................................14
              9.5.  Pavement Profiles - Pavers ...............................................................................................19
              9.6.  Pavement Profiles – Porous pavement .............................................................................20

10.           WALLS ..............................................................................................................................................21
              10.1.   General Specifications .......................................................................................................21
              10.2.   Wall Types .........................................................................................................................21

11.           FURNITURE ......................................................................................................................................22
              11.1.  General Specifications .......................................................................................................22
              11.2.  Furniture Types ..................................................................................................................22

12.           FENCES/ Gates ................................................................................................................................29
              12.1.  General Specifications .......................................................................................................29
              12.2.  Fence types .......................................................................................................................29
              12.3.  Gate types ..........................................................................................................................31


URBIS

URB-P0003847-000-SP.docx                                                                                                                                          iii

Page 4

13.          SOIL ..................................................................................................................................................32
             13.1.      General Specification .........................................................................................................32
             13.2.      Soil Types ..........................................................................................................................33

14.          GARDENS ........................................................................................................................................37
             14.1. General Specification .........................................................................................................37
             14.2. Garden Profiles ..................................................................................................................37

15.          TURF .................................................................................................................................................40
             15.1.     General Specifications .......................................................................................................40
             15.2.     Turf Profiles ........................................................................................................................41

16.          PLANTING ........................................................................................................................................42
             16.1.  General Specifications .......................................................................................................42
             16.2.  Plant Installation.................................................................................................................43

17.          IRRIGATION SYSTEM .....................................................................................................................47
             17.1.   General Specifications .......................................................................................................47
             17.2.   Irrigation types ...................................................................................................................48

18.          INSPECTIONS ..................................................................................................................................49
             18.1.  Inspection schedule ...........................................................................................................51

19.          ESTABLISHMENT MAINTENANCE ................................................................................................52
             19.1.  General ..............................................................................................................................52
             19.2.  Tree transplanting / protection maintenance .....................................................................52
             19.3.  Establishment Maintenance Log ........................................................................................53
             19.4.  Establishment Maintenance Tasks ....................................................................................54

Appendix                    ...........................................................................................................................................57




URBIS

URB-P0003847-000-SP.docx                                                                                                                                               iv

Page 5

1.            NOTES TO THE CONTRACTOR
The following specification outlines the tender, construction and maintenance instructions for the Contractor
to undertake Landscape Works as documented by the URBIS document set.


1.1.          SCOPE OF WORK
The scope of works is described in the Landscape Works Package which includes:

•      These Specification Notes
•      Plant Schedule
•      Drawings;

and any other documentation, which may be issued during the tender period and the construction of the
works. Refer also to documentation prepared for the project by other Consultants.

The Contractor shall be responsible for and shall provide all necessary materials, labour and equipment to
carry out the works shown in this package.


1.2.          DEFINITIONS
    ‘Contractor’                   means a person, business or company who has entered into a Contract with the
                                   Head Contractor or Client to provide landscape works as described in the Contract,
                                   the contract drawings and contract specification. This includes employees, sub-
                                   contractors and agents of the person, business or company

    ‘Landscape Architect’          means the nominated representative of URBIS working on behalf of the client
                                   through whom all communications in relation to work under the contract shall be
                                   given

    ‘Superintendent                means the nominated representative of the Head Contractor or Client through whom
                                   all communications in relation to work under the contract shall be provided

    ‘The Works’                    the activities included in the Contract that have been outlined in the tender
                                   documentation inclusive of this specification

    ‘The Site’                     the area where the contracted works are to be undertaken

    ‘Establishment Period’         equivalent to the specified maintenance period

    ‘Defects Liability Period’     equivalent to the specified maintenance period

    ‘Sub grade’                    means the level at the underside of garden topsoil




1.3.          SITE CONDITIONS
The Contractor shall inspect the site, and examine all plans, drawings and reports, and check all aspects of
work under the Contract and refer any discrepancies to the Superintendent for decision, prior to
commencement. Failure to do so will not be taken as a reason to claim a variation.

•      Existing site conditions;
URBIS
URB-P0003847-000-SP.DOCX                                                                                           PAGE   1

Page 6

•    Site access and storage requirements.
•    Check all relevant dimensions on site before proceeding with work.
•    No claim for extras arising from failure to obtain measurements and other information on site will be
     allowed.
•    It is the Contractor's responsibility to thoroughly inspect the site and to assess the quantity of cut and fill
     of earthworks required to achieve the grades indicated on the grading plans.




URBIS
URB-P0003847-000-SP.DOCX                                                                                       PAGE   2

Page 7

2.          QUALITY AND RESPONSIBILITIES

2.1.        ENVIRONMENTAL PROTECTION
The Contractor will ensure that all materials and the execution of the work are ecologically sound,
environmentally benign and consistent with the principles of sustainable development.

The Contractor is to ensure that no damage occurs to any existing trees or other plants which:

•      Are specified to be retained;
•      Are beyond the extent of works;
•      Need not be removed or damaged during the course of the works.

The Contractor will prevent the spread of dirt and mud along roads and paths. The Contractor will install silt
and sedimentation control for the work.

At all times the Contractor shall ensure that dust resulting from work in progress including excavation,
backfilling, grading and dust from stockpiles is kept to an absolute minimum by use of a water truck or other
approved methods.

Construction works shall be undertaken pursuant to the Environmental Protection Policy – Noise (EPP) in
relation to control of noise from construction activities.

The Contractor will be responsible for assessing any potential wildlife problems when tendering and during
the course of the works. Allowance must be made for any protection or control of such pests the Contractor
deems necessary including the prevention of Fire Ants entering the site via equipment, machinery, materials
or plant stock.

Subsequent wildlife damage to planting or other works will be deemed as defective work and subject to
replacement as per the normal contract conditions. Any proposed method of protection or control of pests
must be agreed with the Superintendent prior to use on site.

Landscape works must not obstruct overland flow paths and must include adequate drainage to minimise
ponding. Mulch or any floatable material must not be located in swales, overland flow paths or around grated
drains; and must not encroach onto kerb and channel, footpaths, pedestrian or vehicular/ circulation areas.


2.2.        EXISTING WORKS
Where works are adjacent to existing works, the Contractor is responsible for making the proper junction
between new and existing works. The Contractor shall not disturb the existing ground surface outside of
areas or locations shown on the Drawings.

The Contractor is to repair or replace any damaged softscape, paving, kerbing, walls, fences, services,
building facades or structures inside or outside the extent of works, which were damaged due to the
Contractors.


2.3.        QUALITY & REGULATIONS
Performance of work is to be in accordance with all applicable laws, rules and regulations required by
authorities having jurisdiction over such work. All work needs to comply with the National Construction Code
(NCC) and Australian Standards.

Further the Landscape works need to be compliance is with the:

•      Conditions of Approval

URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   3

Page 8

•    Approved Plan of Development
•    Approved Infrastructure Master Plan
•    Approved Concept Landscape Report

Any work which is not complying need to be notified to the Landscape Architect.

The landscape works must be coordinated with all relevant authorities and required development permits.

If fire ants are suspected on the development site or locality, the relevant authorities must be contacted,
being at the time of printing - the Department of Primary Industries & Fisheries Call Centre on 13 25 23.

If Myrtle Rust is suspected on the development site or locality, the relevant authorities must be contacted,
being at the time of printing – Biosecurity Queensland on 13 25 23

Any work or materials, which, in the opinion of the Landscape Architect, do not meet appropriate industry
standards of workmanship or quality will be rejected. It will be the Contractor’s responsibility to remove
rejected work and reinstall it to an acceptable standard at no additional cost to the Head Contractor / Client.


2.4.        PRODUCTS AND MATERIALS
Substitutions, product details and technical information for all materials and proprietary items are to be
submitted to Balmain&CO responsible for vetting substitutions, with Urbis engaged on a case-by-case basis.
Substitutions to be approved by Keyton. Obtain and submit reports on relevant tests by an independent
testing authority as per this Specification or as requested by the Landscape Architect and/or Superintendent.

All materials and products are to be without sharp protrusions or abrasive edges, obtrusive fitting or fixtures.
Each colour is to be a uniform finish and there is to be no staining of adjacent materials. All materials are to
be corrosion free.

All materials liable to deteriorate by exposure to the weather shall be kept under cover at a location approved
by the Superintendent and the Contractor shall be held responsible for loss or deterioration occurring in the
course of loading, unloading, transit or storage, no matter what the cause.

Following approval, all remaining works are to match the quality of the sample.


2.5.        PLANT PROCUREMENT
The Contractor will provide photographic evidence of the trees and plants to be supplied immediately upon
award of the Contract. At award all trees and plants are to be secured immediately, with confirmation in
writing accompanied by photographic evidence of plant stock. All trees and palms are to be tagged and
numbered and photos have to be supplied from at least 3 different angles of the specimen. Notification is to
be provided to the Landscape Architect to enable nursery site visit to be carried out for final approval.

If suitable plant species stock is not available due to ordering not occurring immediately upon award of
construction contract, the Contractor is responsible for supplying suitable matching species in a larger stock
format at the approval of Balmain &Co.
It is the Contractors responsibility to inspect all plant stock delivered to site, prior to unloading from delivery
truck. Any plant stock not suitable for installation will be rejected and sent back for replacement. Any stock that
is unsuitable for installation due to poor form, heat, wind or water shock, overgrown form, disease, root binding
or other damage is to be rejected. If any unsuitable stock is installed, and then rejected by the Landscape
Architect, the rejected stock will be replaced by the Contractor at their expense.




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   4

Page 9

3.          EXECUTION OF WORK

3.1.        EARTH WORKS
General
Assumption that civil earthworks will provide finished levels from required landscape levels.

The Contractor will be required to achieve smooth even grading to landscape areas. The Contractor shall
allow to remove existing plant matter, debris, rubble or other loose materials likely to interfere with the new
work, and consolidate the filling to all resulting excavations. The Contractor is required to carry out final
trimming of the entire works of the grades. Any areas of discrepancy from the Drawings should be brought to
the attention of the Landscape Architect.

Earth Mounds
Planting mounds shall be formed from topsoil to the depths as required. The profile shall be such that the
placement of topsoil, soil mix and mulch shall bring the mounds to the finished levels shown on the drawings.
Slopes to mounds shall be no greater than 1:3 unless otherwise shown on the drawings. Ensure existing
ground levels in locations of mounds are deep ripped 150mm prior to formation of mounds.

Rake over all mounds for smooth profile.

Filling in layers as stated above.


3.2.        SETTING OUT
Prior to commencing each stage of the Landscape works, set out alignments of all paths, walls and planting
must be inspected and approved by Balmain & Co. This may include key set-out points for pavement
pattern.




URBIS
URB-P0003847-000-SP.DOCX                                                                                 PAGE   5

Page 10

4.          CRITICAL HOLD POINTS
The Contractor must request the Landscape Architect to attend inspections or provide approval at the
required critical hold points noted in this document. It is the Contractor’s responsibility to adequately notify
the Landscape Architect.

Sufficient allowance of timing needs to be provided for to allow for rejection of works and re-work or re-
ordering of materials, to then not affect the overall project delivery timeframes.

Lead times for ordering of all components in addition to and allowing for hold point inspections or shop
drawing reviews must be organised by the Contractor.

Any failure to co-ordinate these points resulting in delays, or demolition and re-construction of works,
extension of maintenance periods or ability for handover certification to be undertaken, are the responsibility
of the Contractor.




4.1.        HOLD POINT SCHEDULE
         HOLD POINTS

     1   Council / Authority approvals conditions have been supplied to Contractor / Head Contractor, and
         incorporated into the Construction Documentation set

     2   Tree, palm and plant species stock ordering, upon award of construction contract. Early approval is
         critical to avoid construction delays

     3   Tree protection fencing in place

     4   Sample, shop drawings for all balustrade/ handrails / fence / gates provided for all balustrade / handrail
         / fence / gates types – sogn off from Balmain & Co

         HOLD POINTS                                                                         CHKD DATE / NOTES


 Soil Testing

     5   Soil testing of proposed imported soils supplied to Landscape Architect for
         approval. Early testing and approval critical to avoid construction delays
     6   Soil testing of retained site soils carried out. Soil testing of ameliorated site
         soils supplied for approval. Early testing and approval critical to avoid
         construction delays
     7   Soil delivery dockets showing Soil Supplier and batch information.


 Set out

     8   Set out of hardscape areas.

     9   Set out for walls and edges




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   6

Page 11

         HOLD POINTS


 Grading

  10     On-Grade subsoil drainage installed and tested prior to backfilling.

  11     Pavement areas compacted prior to spreading base material.

  12     Planters clean of all rubbish and construction debris prior to soil placement.


 Planting

  13     Written confirmation from nurseries that any plant stock located within
         shade houses have been relocated to allow for full sun hardening 4 weeks
         prior to delivery date
  14     Cultivated subgrade to all turf and planting areas to specified depths.

  15     Site fencing installed to exclude all site traffic from cultivated areas. Ensure
         no cultivated areas are recompacted by site traffic. This is critical to ensure
         long term plant growth success.
  16     Plants / transplant when delivered to site, prior to being unloaded from the
         truck Contractor to check for transport related damage, plant form and
         suitability for installation.




URBIS
URB-P0003847-000-SP.DOCX                                                                    PAGE   7

Page 12

5.          EXISTING TREE PROTECTION

5.1.        GENERAL SPECIFICATIONS
The Contractor shall be responsible for protecting all existing vegetation to be retained from malicious or
accidental damage including provision of temporary protective fencing where necessary and shall ensure
that no branches are lopped and no roots over 25mm are severed from trees without the express prior
permission of the Landscape Architect.

The landscape contractor is responsible that all other contractors on or entering the site are aware of
prohibition of works within the tree protection zone. The contractor must ensure any works within this
area are controlled and in line with this specification.

Tree protection zone and Pruning
All tree protection areas, root zone protection and canopy pruning works are to be done in accordance with
AS4970 ‘Protection of trees on development sites’ and AS 4373, ‘Pruning of Amenity Trees’.

Work prohibited within the Tree protection zone
Within the tree protection zone excavation any work other than specified, storage or placement of facilities
are prohibited, such as:

•      Machine excavation for underground services or footings
•      Storage or stockpiling of materials, soil, construction material, rubbish, diesel
•      Placement of site sheds / facilities
•      Mixing materials (e.g. concrete)
•      Cleaning of equipment / tools (e.g. paint brushes, wheel barrows)
•      Light bonfires in any situation unless authorised and situated where they will not cause damage to
       existing trees, shrubs or hedges.
•      Prevent drainage run-off from adjacent construction areas as they are most likely toxic for the existing
       vegetation
•      Washing out of materials
•      Alternation of existing ground levels other than specified

Work within the Tree Protection and Canopy Zone
All work within the tree protection and canopy zone of existing trees are to be exercised with extreme care.
No damage shall be caused to the canopy of the existing trees. Where necessary tie back branches.

Allow for hand-working only within this zone.

If hand-working is not possible, use mat protection for load spreading. Within the tree protection zone no
compaction is allowed. Use system in accordance with AS4970 ‘Protection of trees on development sites’.
Propose system to Landscape Architect and obtain approval prior to any work.

Prior to any excavation works for footings, piling etc. 600mm deep pot holing using vacuum excavation need
to be undertaken for each location to look for structural roots. A horticultural or arborist is to review the
potential damage and submit a report for approval and instruction to the Landscape Architect. After obtaining
the arborist report the contractor shall submit an action plan for the completion of the construction works.

Two weeks prior to commencing works notify the Landscape Architect. Submit photographic evidence for
each hole identified with numbering system and located on a plan.




URBIS
URB-P0003847-000-SP.DOCX                                                                                     PAGE   8

Page 13

6.          TREE / PALM TRANSPLATING

6.1.        GENERAL SPECIFICATIONS
Relevant Standards
All work must be done in strict accordance with AS 4970




URBIS
URB-P0003847-000-SP.DOCX                                  PAGE   9

Page 14

7.          DRAINAGE

7.1.        GENERAL SPECIFICATION
All drainage grates to be lockable.

All bends or curves of drainage channels to be built with a mitre cut at the end of each channel.

All grates to be heel safe with a max. slot width of 7mm.

All grates to be compliant with the slip resistant requirements of the National Construction Code (NCC) and
Australian Standards AS/NZS 4586 2013, AS HB 198 2014.

All grates to meet the wheelchair and walking cane safety requirements as per AS 1428.2

All grates to be flush with adjacent floor finishes.

All sizes have to be approved by a hydraulic engineer and approved calculations.

Load classifications are specified as per AS 3996.




URBIS
URB-P0003847-000-SP.DOCX                                                                              PAGE   10

Page 15

8.          EDGES

8.1.        GENERAL SPECIFICATIONS
Samples
Install a minimum 2.5m long typical portion of each different edge type showing materials, colour, finish and
joints for approval by the Landscape Architect. If acceptable, this sample should be retained as a quality
benchmark and shall form part of the finished works.


8.2.        EDGE TYPES

 ED01: Edge Type – Concrete edge

 Material - In-situ concrete (grey Portland cement), 25 mpa
 Dimension - 150mm wide x 150mm deep, 5mm rounded chamfer to top edges
 Sub-base depth/material - 100mm compacted road base
 Expansion joints - 10mm wide Abelflex, max. 5m spacing. Connection reinforcing rod between expansion
 joints
 Surface Finish - Smooth trowel finish
 Colour - Plain grey
 Levels - Top surface is to finish flush with the adjacent kerbs or pavement
 Note: Refer Institute of Public Works Engineering Australia standard works, Detail ER1

 ED02: Edge Type– Timber Edge

 Material - CCA treated pine, rough sawn, treatment Class H5
 Material dimensions - 100mm tall x 50mm wide
 Stakes / support - Hardwood stake support. 50x50x350mm. Galvanise nail stake to timber edge. Stake fixed
 20mm below top of timber edge. Stakes every 2m centres & all junctions. Minimum1 stake per 2 Lm.
 Joins - Connect individual edge timbers with a 1m length of edging set down 20mm below the main edge
 pieces and fixed to them to achieve a smooth line
 Colour - None to be applied
 Levels - Top surface is to finish flush with the adjacent kerbs or pavement




URBIS
URB-P0003847-000-SP.DOCX                                                                               PAGE   11

Page 16

9.          PAVEMENT

9.1.        GENERAL SPECIFICATIONS
Drainage
Ensure positive drainage to the kerb and drainage inlet grates to prevent ponding. Grout for direct bond
granite to be water repelled. Ensure there is less than 5mm deep water ponding 15 minutes after rain has
stopped,

Falls are to be achieved in the base slab or topping slab not via variations in the depth of the mortar bed or
sand bed.

Ensure a threshold grade change or ramp is maintained at every known door to allow for minimum
50mm difference between lower external levels and internal floor level (refer to grading plans).

Ensure positive drainage to the kerb and drainage inlet grates to prevent ponding.

Slip resistance
Ensure pavement finishes including sealers, tactiles and directional pavers are compliant with the slip
resistance requirements of the National Construction Code (NCC) and Australian Standards AS/NZS 4586
2013, AS HB 198 2014.

Ramp surfaces must have a slip resistance classification of minimum R11 rating for the oil-wet ramp test as
per Table 5 of AS / NZS 4586-2013.

Provide complying slip resistance test results to the Superintendent.

     Location                                                 Wet pendulum test        Oil-wet inclining platform
                                                                                       test / Wet-Barefoot test

 External pavements, Ramps steeper than 1:20 gradient but    P4                      R11
 not steeper than 1:14

 Ramps steeper than 1:14 gradient but not steeper than 1:8   P5                      R12

 Stairs treads and landings                                  P4                      R11

 Swimming pool surrounds and communal shower rooms           P4                      B

 Swimming Pool ramps and stairs leading into water           P5                      C


Luminescence contrast testing
Contrast between stair thread paver and stair nosing to be tested and approved as per AS1428. Contrast
between tactile indicators and adjacent pavement to be tested and approved as per AS1428.

Efflorescence
Take all necessary measures to ensure no efflorescence occurs. Select base materials and include
admixtures to prevent the occurrence of efflorescence.

Structural Requirements
Refer to Engineer's Specifications for slab thicknesses, cover to reinforcing, reinforcing, concrete MPa and
base course requirements. Engineers Specifications take precedence over the requirements noted in this
item. Structural slab to be fully cured to the current curing recommendations.


URBIS
URB-P0003847-000-SP.DOCX                                                                                    PAGE   12

Page 17

Levels
Ensure there is no more than 2mm different in height between adjoining pavement segments, other adjoining
pavements, top of kerbs or pit covers (unless specified otherwise).

Spot levels take precedence over contour lines and existing ground profile lines.

Concrete Joints
All joints to be laid out as indicated on the construction drawings. If the location and type of construction
joints are not shown on the drawings, submit proposed location and detail of construction joints to the
Landscape Architect for approval prior to the start of formwork placement. Periods of stoppage in concrete of
3/4 hour or more are deemed to be construction joints.
Ensure that joint widths between pavers at dowelled construction joints are equal to the underlying concrete
pavement joint widths. The concrete base slab should not be designed solely as a jointed reinforced
concrete pavement (JRCP) but must be designed and detailed to avoid differential strains between the
pavers and the concrete slab. Pavers to be laid immediately following construction of concrete base to avoid
shrinkage of slab.

Expansion joints
All visible expansion joints to be 10mm wide zipped polyethylene foam (e.g. Abelflex) sealed with an
approved coloured sealant (e.g. Sikaflex or equivalent). Colour to match the lightest coloured adjacent
pavement. Expansion joints in structural slab underneath (both basement and single slab) are to be carried
through to the surface in the same dimensions.

Control joints
To be 20mm deep cut saws. Make the joint straight and true, and free from blemishes impermissible for its
surface finish class.


9.2.        TIMBER WORKS
Sawn / Dressed Timber
All timber shall be hardwood to AS 2082 to the stress grade nominated. All timber is to be ‘appearance’ or
dressed grade. All hardwood timber specified is to be Durability 2 class except where in contract with ground
surface where it shall be Durability Class 1. All sawn timber to be branded as complying with the
requirements of AHQC (Australian Hardwood Quality Council).

Timber Connections
Structural fasteners shall be located in sound timber avoiding timber defects. Fasteners shall be installed in
accordance with Manufacturer’s instructions. All bolts, nuts, washers, nail plates and brackets to be hot
dipped galvanised to AS 1650.

Additionally, bolt shanks and washers bearing against timber shall be protected with Dulux Amercoat 385
applied in accordance with the manufacturers specification and properly cured before installation. Bolt holes
to be 10% greater than the nominal bolt sizes. Position bolts to facilitate tightening. Coat all bolt shanks with
CN Emulsion before installation. Bolts to be snug tight (do not over tighten). Washers to be placed under all
bolt heads (except where cuphead bolts specified) and nuts.

Timber Quality
Timber shall be graded and audited under the Australian Hardwood Quality Control Program.

At the time of grading, the bottom and sides of the plank shall conform to Structural Grade No. 2 (for Forest
Red Gum Structural Grade 1) (AS 2082)

Preservative Treatment



URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   13

Page 18

Treatment, natural durability classes and combinations thereof shall conform to AS 1604, TUMA (Timber
Utilisation and Marketing Act Qld 1987) and TMA (Timber Marketing Act NSW 1977).

A certification of treatment shall be provided.

Timber pavement finish
Where timber is used as a floor finish ensure timber decking coating comply with the slip resistance
requirements of the National Construction Code (NCC) and Australian Standards AS/NZS 4586 2013, AS
HB 198 2014. Provide complying slip resistance test results to the Superintendent.


9.3.        CONCRETE WORKS
General
This specification sections applies for insitu-concrete and pre-cast concrete elements.

All components of concrete works such as concrete mix, water-cement ratio, concrete strength, pigment
quantities, formwork types, release agent, sand type and sealer shall be kept consistent throughout the
project to avoid differences between the elements.

Regulatory Standards & Industry Association Reference Publications
The relevant Industry Association reference publications and guide standards should be use for the relevant
work:

•     CCAA Cement Concrete & Aggregates Australia www.concrete.net.au
•     CCAA Guides series, including the following as applicable:
•     CCAA T57 Guide to Off-Form Concrete Finishes
•     CCAA T59 Guide to Concrete Flatwork Finishes
•     CCAA Data Sheets series, including the following as applicable:
•     CCAA Data Sheet – Avoiding Surface Imperfections in Concrete
•     CCAA Data Sheet – Removing Stains from Concrete
•     CCAA Data Sheet – Cleaning Concrete
•     NPCAA - Precast Concrete Handbook
•     AS 3610 – Formwork for Concrete
•     AS 3600 – Concrete Structures
•     AS 1379 – Specification and Supply of Concrete
•     Local Authorities Applicable Regulations
•     Building Code of Australia including Standards referenced in the NCC/BCA.


9.4.        PAVEMENT PROFILES – CONCRETE

    PA01: Pavement Profile –Concrete – On Grade – BY CIVIL

    Material – In-situ concrete. 125mm thickness. Normal class. Minimum grade N32.
    Supplier – Boral or approved equivalent.
    Colour – Grey cement
    Surface Finish – Broomed. Apply finish after control joints have been tooled
    Slip rating – Wet Pendulum Class rating ‘P4’ and slip resistant R11. All areas steeper than 1:14 to be Wet
    Pendulum Class rating ‘P5’ and slip resistant R12.
    Sealer – Penetration, non-yellowing protective sealer for concrete floors. CCS Streetscape or approved
    equivalent.




URBIS
URB-P0003847-000-SP.DOCX                                                                                    PAGE   14

Page 19

 Sub-base depth / material – As per structural engineer’s documentation. Remove any soft areas that could
 lead to settlement and cracking and replace with suitable compacted material capable of supporting the base
 material
 Reinforcing – F72 mesh, min. 50 mm top cover as per structural engineer’s documentation
 Expansion joints - 10mm thick bitumen impregnated fibreboard. Locate expansion joints at 5m intervals unless
 shown otherwise on the drawings
 Control joints - Tooled control joints at 3m intervals unless shown otherwise on the drawings


 PA02: Pavement Profile – Carparking Bays - Coloured Concrete – On Grade – BY CIVIL


 Material – In-situ concrete. Vehicular grade at 175mm thickness. Normal class. Minimum grade N32.
 Supplier – Boral or approved equivalent.
 Colour – Full depth Coloured Concrete - colour "CCS Cactus" - broom finish (vehicular depth)
 Aggregate - no
 Surface Finish – Broomed. Apply finish after control joints have been tooled
 Slip rating – Wet Pendulum Class rating ‘P4’ and slip resistant R11. All areas steeper than 1:14 to be Wet
 Pendulum Class rating ‘P5’ and slip resistant R12D.
 Sealer – Penetration, non-yellowing protective sealer for concrete floors. CCS Streetscape or approved
 equivalent.
 Sub-base depth / material – As per structural engineer’s documentation. Remove any soft areas that could
 lead to settlement and cracking and replace with suitable compacted material capable of supporting the base
 material
 Reinforcing – F72 mesh, min. 50 mm top cover as per structural engineer’s documentation
 Expansion joints - 10mm thick bitumen impregnated fibreboard. Locate expansion joints at 5m intervals unless
 shown otherwise on the drawings
 Control joints - Tooled control joints at 3m intervals unless shown otherwise on the drawings




 PA03: Pavement Profile – Driveways - On Grade – BY CIVIL

 Material – In-situ concrete. Vehicular grade at 175mm thickness. Normal class. Minimum grade N32.
 Supplier – Boral or approved equivalent.
 Colour – no
 Aggregate - no

 Slip rating – Wet Pendulum Class rating ‘P4’ and slip resistant R11. All areas steeper than 1:14 to be Wet
 Pendulum Class rating ‘P5’ and slip resistant R12D.



URBIS
URB-P0003847-000-SP.DOCX                                                                                 PAGE   15

Page 20

 Sealer – Penetration, non-yellowing protective sealer for concrete floors. CCS Streetscape or approved
 equivalent.
 Sub-base depth / material – As per structural engineer’s documentation. Remove any soft areas that could
 lead to settlement and cracking and replace with suitable compacted material capable of supporting the base
 material
 Reinforcing – F72 mesh, min. 50 mm top cover as per structural engineer’s documentation
 Expansion joints - 10mm thick bitumen impregnated fibreboard. Locate expansion joints at 5m intervals unless
 shown otherwise on the drawings

 Control joints - Tooled control joints at 3m intervals unless shown otherwise on the drawings


 PA04: Pavement Profile – Exposed Aggregate Coloured Concrete – On Grade
 Material – In-situ concrete. 125mm thickness. Normal class. Minimum grade N32.
 Supplier – Boral or approved equivalent.
 Colour – Full depth colour "CCS Black 44"
 Aggregate - 'Night Sky'
 Surface Finish – Exposed aggregates, Light depth exposure
 Slip rating – Wet Pendulum Class rating ‘P4’ and slip resistant R11. All areas steeper than 1:14 to be Wet
 Pendulum Class rating ‘P5’ and slip resistant R12D.
 Sealer – Penetration, non-yellowing protective sealer for concrete floors. CCS Streetscape or approved
 equivalent.
 Sub-base depth / material – As per structural engineer’s documentation. Remove any soft areas that could
 lead to settlement and cracking and replace with suitable compacted material capable of supporting the base
 material
 Reinforcing – F72 mesh, min. 50 mm top cover as per structural engineer’s documentation
 Expansion joints - 10mm thick bitumen impregnated fibreboard. Locate expansion joints at 5m intervals unless
 shown otherwise on the drawings
 Control joints - Tooled control joints at 3m intervals unless shown otherwise on the drawings




 PA05: Pavement Profile – Exposed Aggregate Grey Concrete – On Grade

 Material – In-situ concrete. 175mm thickness. Normal class. Minimum grade N32.
 Supplier – Boral or approved equivalent.
 Colour – no
 Aggregate – ‘Eclypse'
 Surface Finish – Exposed aggregates, Mid depth exposure




URBIS
URB-P0003847-000-SP.DOCX                                                                              PAGE   16

Page 21

 Slip rating – Wet Pendulum Class rating ‘P4’ and slip resistant R11. All areas steeper than 1:14 to be Wet
 Pendulum Class rating ‘P5’ and slip resistant R12D.
 Sealer – Penetration, non-yellowing protective sealer for concrete floors. CCS Streetscape or approved
 equivalent.
 Sub-base depth / material – As per structural engineer’s documentation. Remove any soft areas that could
 lead to settlement and cracking and replace with suitable compacted material capable of supporting the base
 material
 Reinforcing – F72 mesh, min. 50 mm top cover as per structural engineer’s documentation
 Expansion joints - 10mm thick bitumen impregnated fibreboard. Locate expansion joints at 5m intervals unless
 shown otherwise on the drawings
 Control joints - Tooled control joints at 3m intervals unless shown otherwise on the drawings




 PA06: Pavement Profile – Concrete – Vehicular for Pickle Ball Court

 Pickle Ball Court
 Dimensions: Length – 13,41m long, 6,10m wide
 Material – In-situ concrete. 175mm thickness. Normal class. Minimum grade N32.
 Colour – Grey cement
 Aggregates – no
 Supplier –– Boral or approved equivalent.
 Surface Finish – broom finish
 Slip rating – Wet Pendulum Class rating ‘P4’ and slip resistant R11. All areas steeper than 1:14 to be Wet
 Pendulum Class rating ‘P5’ and slip resistant R12.
 Base depth / material - 125mm thick as per structural engineers’ documentation
 Sub-base depth / material – As per structural engineer’s documentation. Remove any soft areas that could
 lead to settlement and cracking and replace with suitable compacted material capable of supporting the base
 material
 Reinforcing – F72 mesh, min. 50 mm top cover as per structural engineer’s documentation
 Expansion joints - 10mm thick bitumen impregnated fibreboard. Locate expansion joints at 5m intervals unless
 shown otherwise on the drawings
 Control joints - Tooled control joints at 2m intervals unless shown otherwise on the drawings.

 Surface Colour:
 Colour – Full surface colour application
 Installation- Installed to manufactures specification (StreetBond150™), and Australian standards.
 Provide installation certificate specifying product type and specification.




URBIS
URB-P0003847-000-SP.DOCX                                                                              PAGE   17

Page 22

 Colour Coating Supplier: Brick N Pave or approved equivalent. ph: 1300 729 758, Website:
 http://www.bricknpave.com.au/Home.htm
 Samples: Provide 100mm x 100mm paint sample to Landscape Architect for approval prior to installation of
 site sample. Provide 1 x 1 m2 min. site sample panel for project Landscape Architect's approval prior to
 installation of final pavement area. This sample panel is not to be provided as a part of the final construction
 area.
 Coating colour: Applied colour coating on the surface as details on FI dwgs
 General Notes: Application will / has been undertaken by a licensed applicator, applicator to undertakes a
 moisture test and slip test.

 Note refer to 900-DE for detailed setout, dimensions and colours.

COLOUR TO MATCH COLOURS AS PER BELOW:
Line marking – Colour white
Dark blue – Cobalt Blue
Light blue – Heavenly




 PA07: Pavement Profile –Concrete – On Grade

 As per PA01




URBIS
URB-P0003847-000-SP.DOCX                                                                                    PAGE   18

Page 23

9.5.        PAVEMENT PROFILES - PAVERS
 PA21: Pavement Profile – Pavers – On Grade

 Material - precast reconstituted concrete unit paver. Cashmere colour. Honed grit 120 finish
 Supplier - Eco Concepts, Ph: 1300 13 14 13 or approved equivalent
 Dimensions - 500 x 500 x 38mm. Tolerance +0 and -2mm max.
 Stepper joint width - 150mm typical or as shown
 Bedding - Approx. 150mm deep, approx. 25mm smaller than the stepper surface area wet concrete bed.
 Individual bed for each stepper




URBIS
URB-P0003847-000-SP.DOCX                                                                         PAGE   19

Page 24

9.6.        PAVEMENT PROFILES – POROUS PAVEMENT

 PA31: Pavement Profile – Gravel
 Material – Tumbled sandstone 20-90mm. Washed free of all fines.
 Depth – 100mm depth of gravel coverage.
 Supplier - Centenary Landscape or approved equivalent
 Weed Mat – 100% polypropylene non-woven fabric ‘Weed Gunnel’, Black in colour 50 gsm, UV and
 hydrophilic treated, water permeable
 Installation - Rake the existing surface to a smooth even grade removing building debris, sticks and stones.
 Lay permeable weed mat on existing site soil. Lay with a 200mm overlap at joints. Spread gravel to achieve a
 smooth even surface. 75mm depth. Unless otherwise noted finish flush with adjacent edges and finishes.




 PA32: Pavement Profile – Decomposed Granite – Pedestrian, At-Grade

 Material – Decomposed Granite with Soilbond stabiliser
 Supplier – Soilbond Pty Ltd (NSW) or approved equivalent
 Material dimensions – 50mm thickness
 Colour – Sand

 Note: Edequate amount of stabilisier to be used to provide firm surface.

 PA33: Pavement Profile – Gravel

 Material – Drainage Gravel 20mm. Recycled Concrete.
 Depth – 50mm depth of gravel
 Supplier - Centenary Landscape or approved equivalent
 Installation - Spread gravel to achieve a smooth even surface. Infill over existing rocks to provide walkable
 path. Finish flush with adjacent edges and finishes.




URBIS
URB-P0003847-000-SP.DOCX                                                                                   PAGE   20

Page 25

10.         WALLS

10.1.       GENERAL SPECIFICATIONS
All concrete works to comply with Concrete Works Section of this specification.
Walls are to be constructed true to the documented line, levels and detail. Capping is to have a fall inwards
to allow water shedding. There is to be no more than 2mm difference in height between adjoining facing
segments or between adjoining capping segments.

Expansion joints, facing and wall capping segments are to be set out as indicated on the drawings and as
directed on site by the Landscape Architect. Unless otherwise documented cuts are to be carried out to
achieve a gap of no more than 3mm between adjoining segments or other adjoining surfaces or structures.
Slip resistance for the capping is to be to AS 3661.1. Select materials and include admixtures to prevent the
occurrence of efflorescence.

Walls are to be less than 1% from detailed face angles with zero subsidence. Horizontal wall members are
to not sag.


10.2.       WALL TYPES

 WA01: Wall Type – Rendered Wall

 CIVIL SCOPE
 Material –Rendered blockwork wall (by civil)
 Dimensions – 1,80m high, 200 series blockwork (Body) as per structural engineer’s detail.
 Waterproofing – Bituminous barrier to back of wall with coreflute to protect (subterranean only).
 Drainage - 90m Ø perforated PVC pipe "Ag Line" without "sock". Connect to stormwater. Backfill with 20mm
 drainage gravel and Atlantis "Hydro net", "Filter Fabric 3002" (subterranean only).
 Structural Requirements & Footings - Refer to structural engineer's documentation

 LANDSCAPE SCOPE
 Surface finish – Rockcote coloured renders
 Colour- Monument
 Supplier – Rockcote (QLD & NSW)
 Sealer – To be sealed and treated to manufacturers specification




URBIS
URB-P0003847-000-SP.DOCX                                                                                PAGE   21

Page 26

11.         FURNITURE

11.1.       GENERAL SPECIFICATIONS
Alternatives and substitutes
to be approved by Landscape Contractor prior to manufacturer or purchase of materials.

Ensure all furniture items are treated with an anti-graffiti paint, such as Dry treat 'Stain-Proof Original' or
approved equivalent. Coating is to be applied prior to site delivery and installation.

Sample
Install product sample of each different furniture type showing materials, surface pattern, colour, finish and
joints for approval by the Balmain & Co. If acceptable, this sample should be retained as a quality
benchmark and shall form part of the finished works.

Footings
Install footings in accordance to manufactures specification. Shallow foundation for areas on structure and
over services chambers are to be installed in accordance to a structural engineer’s specification.


11.2.       FURNITURE TYPES

 FU01: Furniture Type – Bench Seat

 Product: Parkway Seat with two armrests to both ends or approved equivalent
 Supplier: Terrain Group
 Dimensions: 1.8m length x 520mm high
 Material Frame: Aluminium in Powdercoated Black
 Legs – Freestand leg, fixed to surface
 Material Seat: Aluminium, Colour Champagne
 Fixing - Surface mount
 Installation - Install in accordance with manufacturer's specifications




 FU02: Furniture Type – Bollard - fixed

 Model – Hardwood timber bollard
 Installation- As per suppliers specification at 1500mm centres
 Materials- Hardwood timber, CCA treated


URBIS
URB-P0003847-000-SP.DOCX                                                                                     PAGE   22

Page 27

 Notes – Refer to Industry of Public works Engineering Australia standard drawings GS-042


 FU03: Furniture Type – Bird Bath freestanding
 Model – Willy Wagtail Bird Bath or approved equivalent
 Installation- As per suppliers specification at 1500mm centres
 Materials- Australian Bronze
 Dimensions – 600mm dia, 60mm depth, 750mm height
 Fixings - Fixed to concrete plinth as per manufacturers specification.




 FU04: Furniture Type – Shed

 Product – Handi Mate Hinged Door Shed or approved equivalent
 Product Code – SKU: SHMSHSDHM9GU
 Supplier – Stratco or approved similear
 Dimensions – HM09 – 3.62m wide x 2.17m long
 Finishes & Colour – Gun Metal Grey
 Installation - as per manufacturers specification

 Character Image:




URBIS
URB-P0003847-000-SP.DOCX                                                                    PAGE   23

Page 28

 FU05: Furniture Type – Raised Garden beds

 Product – A-Size series or approved equivalent
 Supplier: Birdies Garden Products or approved equivalent. E: www.birdiesgardenproducts.com.au
 Soil – refer GA07
 Dimensions – 2100mm long x 900mm wide x 740mm high
 Material: Aluzinc steel, Stainless Steel Fasteners, All Weather PVC safety edge
 Colour: Woodland Grey


 FU06: Furniture Type – Bins
Product- Temora Waste Bins or approved equivalent
Supplier- Terrain Group
Dimensions- 240 Litre
Material Hood- Anodised aluminium
Material Body- Slatted powdercoated aluminium, colour black
Colour- Powdercoated Black


 FU07: Furniture Type – Pickle ball net

 Product – Pickle Ball post and net package
 Supplier - Play n Sport or approved equal, https://www.playnsports.com.au/form/contact-us/
 Pickleball Posts - round Posts with ground sockets and plastic cap lids (posts concreted into the surface of
 court by a qualified professional).
 Pickleball Net - 2.5mm braided HDPP twine measures the regulation 22ft wide and 3ft high.
 Net has quadruple stitched polyester headband and fitted headline wire for extra durability.

 INSTALLATION ADVICE: Pickleball nets are hung at 36 inches high at each end, with a height of 34 inches at
 the centre.


 FU08: Furniture Type – Shelter
Product: Akiva Shelter or approved equivalent, including solar down lights
Supplier: Terrain Group
Dimensions: 6m x 3m
Material posts: Anodised aluminium in Powdercoated Black

Character Image:




URBIS
URB-P0003847-000-SP.DOCX                                                                                 PAGE   24

Page 29

 FU09: Furniture Type – Picnic Setting

 Product: Garden Table Setting or approved equivalent
 Supplier: Terrain Group
 Dimensions: 1.8m length
 Material Frame: Aluminium, Powdercoated Black
 Legs: Flange leg
 Material Seat: Aluminium, Colour Champagne
 Fixing - Surface mount
 Installation - Install in accordance with manufacturer's specifications


 FU10: Furniture Type – Bollard - fixed
 Model - 'Dek' (DEK6-F-F) - Stainless Steel Bollard - fixed. Flat top fixed
 Supplier - Street & Garden Australia
 Installation- As per suppliers specification
 Materials- Grade 304 stainless Steel, brushed finish.
 Fixings -As per suppliers specification
 Sample- provide one example for approval
 Notes – refer to appendix for product details


 FU20: Furniture Type – Miniature sculptures




URBIS
URB-P0003847-000-SP.DOCX                                                      PAGE   25

Page 30

 Types as per below:

 Type 20 – Frog 1

     1.   H70x W120 x D110mm approx.




 Type 21 – Frog 2

     2.   H50x W210 x D90mm approx.




 Type 22 – Echidna

     3.   approx H45 x W100 x D55mm




URBIS
URB-P0003847-000-SP.DOCX               PAGE   26

Page 31

 Type 23 – Kangaroo 1

     4.   H85 x W165 x D40mm approx




 Type 24 – Kangaroo 2

     5.   H95 x W140 x D40mm approx.




 Type 25 – Koala 1

     6.   H130xW75xD45mm




URBIS
URB-P0003847-000-SP.DOCX               PAGE   27

Page 32

 Type 26 – Koala 2

     7.   H115xW95xD70mm




 Type 27 – Possum

     8.   H70 x W65 x D75mm




URBIS
URB-P0003847-000-SP.DOCX      PAGE   28

Page 33

12.         FENCES/ GATES

12.1.       GENERAL SPECIFICATIONS
Handrails and Balustrades to be compliant with AS1428

All steelwork to be hot dip galvanised and powder coated as specified in this specification. Each connection
between aluminium and steel must be fully isolated with neoprene washer, plates and sleeves or similar

Sample
Install a minimum 2.5m long sample area of each different balustrade, handrail and fence type showing
materials, surface pattern, colour, finish and joints for approval by the Landscape Architect. If acceptable,
this sample should be retained as a quality benchmark and shall form part of the finished works.

Shop drawings for all nonstandard items need to be provided.


12.2.       FENCE TYPES

 FE01: Fence Type 1 – Solid Colour Bond Fence

 Product – Standard Colorbond Steel Fencing – CS2418-CNF
 Dimensions – 1800mm high x 2400mm long (typical).
 Supplier- Oxworks or approved equivalent
 FE01A – FIXED TO TOP OF CIVIL RETAINING WALL
 FE01B – FIXED TO GROUND
 Material – Genuine Colorbond® Steel
 Sheet Base Metal Thickness - 0.35mm BMT
 Post & Rail Base Metal Thickness - 0.8mm BMT
 Profile – Sawtooth
 Colour – Monument for all components
 Notes – Refer manufacturers recommendation




URBIS
URB-P0003847-000-SP.DOCX                                                                                 PAGE   29

Page 34

 FE02: Fence Type - Pool fencing

 Material - Aluminium Radiator Batten Fence
 Dimensions - 1800mm high x 2400mm long.
 Batten Size – 32 x 32 x 1.2mm tubes
 Tube Spacings – 90mm
 Supplier – Oxworks or approved equivalent, E: www.oxworks.com.au
 FE02A – ON CIVIL RETAINING WALL
 FE02B – ON GROUND
 Colour- Monument
 Concrete footings- In ground @ 2400mm centres
 Posts – 50mm x 50mm posts.
 Fixings- All fixings to be non-corrosive and salt resistant.
 Note – Refer to appendix for product specification.




 FE03: Fence Type 3 – Aluminium Batten Fence

 Material - Aluminium Batten Fence
 Dimensions - 1800mm high x 2400mm long.
 Batten Size – 32 x 32 x 1.2mm
 Tube Spacings – 30mm
 Supplier – Oxworks or approved equivalent, E: www.oxworks.com.au
 FE03A – ON CIVIL RETAINING WALL
 FE03B – ON GROUND
 Colour- Monument
 Concrete footings- In ground @ 2400mm centres
 Posts – 50mm x 50mm posts.
 Fixings- All fixings to be non-corrosive and salt resistant.
 Note – Refer to appendix for product specification.




URBIS
URB-P0003847-000-SP.DOCX                                            PAGE   30

Page 35

 FE04: Fence Type - Pool fencing

 Material - Aluminium Panel
 Dimensions - 1200mm high x 2400mm long.
 Supplier - ARC Fences (ph) 1800 336 237 www.arcfences.com.au
 Types: Pool fence Sturt, flat top or approved equivalent
 FE04B – FIXED TO GROUND
 Dimensions- Horizontal Rail - 38 x 26 x 1.6mm, Vertical tubes -16mm diameter. ARC Fences,
 Colour- Black
 Concrete footings- In ground @ 2400mm centres
 Surface Finish- Powdercoated Black
 Fixings- All fixings to be non-corrosive and salt resistant.




12.3.       GATE TYPES

   GT01: Gate type – Pedestrian gate
   Description – Single gate to match Aluminium Batten Fence FE03
   Supplier- Oxworks or approved equivalent
   Dimension – Single gate - 1800mm (H) x 900mm (W)
   Lock – No lock, gate latch only

   GT02: Gate type – Pedestrian gate

   Description – Double gate to match Aluminium Batten Fence FE03
   Supplier- Oxworks or approved equivalent
   Fixing – Subsurface fixing
   Dimension – Double gate - 1800mm (H) x 1800mm (W)
   Lock – Drop bolt arrangement and typical gate hardware (no strikes or electronic controls, closers or
   similar)




URBIS
URB-P0003847-000-SP.DOCX                                                                                   PAGE   31

Page 36

13.         SOIL

13.1.       GENERAL SPECIFICATION

Quality assurance and control
Soil sample testing results are to be provided to ensure soils meet the specification requirements prior to
installation. If the samples do not meet the performance specification corrective actions have to been
undertaken with no additional cost to the Superintendent. Samples reports are to be submitted to the
Landscape Architect, and written approval to be obtained before using the soil.

All testing as required by the product specifications must be arranged by the Contractor, and carried out by
an accredited laboratory. The test certificate will be accompanied by a statement of compliance from a
competent person (e.g. qualified agronomist horticulturist or soil scientist). Testing facility shall be SESL
Laboratories.

Compliance certificates will be in the form of a report clearly stating the material is compliant, with an
attachment showing the test results. In the case of minor non-compliance or substantial compliance, a clear
statement must be obtained from a qualified independent agronomist waiving the compliance and certifying
the sample is compliant with or without conditions.

Manufacturer’s product representation
For imported soils from manufacturers, a ‘product representation’ document produced by the supplier may
be accepted as a compliance certificate if:

•     it is an off-the-shelf product line, not a custom mix
•     a representative test certificate is available and is acceptably recent (within 1 month)
•     the testing covers all those criteria in the URBIS performance specification and complies
•     the manufacturer’s quality assurance system is externally certified.

Quality control during construction
The contractor must submit samples of blended soils or imported soil mixes at regular intervals during
construction for the purposes of demonstrating continued compliance of quality control.

Minor non-compliance
The Contractor will make corrective procedures to bring any soil that has been placed within compliance in
accordance with the agronomist’s advice.

Record keeping
Growing media initial compliance certification records must be kept in an easily retrievable manner that
provides for traceability of purchase and location on site. Each compliance certification for all the product
specifications used on site must be identified by date, quantity to be supplied and a copy of the formulation
used to reach compliance. Each batch of soil must be identified by date of manufacture, quantity and a
corresponding test result and must link into when the material was delivered and where the material was
placed.

Unwanted material
The soil must be free from any debris, existing plant matter, rubble, waste or other contaminated materials
likely to interfere with the quality of the soil. Visible contaminants smaller than 2mm shall not exceed 0.5 % of
the soil mass.




URBIS
URB-P0003847-000-SP.DOCX                                                                                 PAGE   32

Page 37

13.2.       SOIL TYPES
The following soil test result requirements meet or exceed the current AS 4419 – 2018 requirements.
All test results must comply with the below testing requirements.


 On Grade Soil Media - Turf


 Quality – Soil must be free from any ‘unwanted materials’
 Physical properties particle sizes

         Property                        Units                 Target Range

         2.0 mm (fine gravel)            % retained by         < 10
         1.0 mm (very coarse sand)       mass                  < 10
         0.5 mm (coarse sand)                                  10 - 30    30 - 50
         0.25 mm (medium sand)                                 20 - 40
         0.1 mm (fine sand)                                    10 – 30
         0.05 (very fine sand)                                 5 – 15 (max 25 % combine vfs, Si + Clay combined)
         0.002 mm (silt)                                       5 – 10 (< 12 % Si + Clay combined)
         < 0.002 mm (clay)                                     3 – 8 (< 12 % Si + Clay combined)
         Large particles                                       2 – 20 mm = < 10 %, > 20mm = 0 %
         (OM) Organic matter             % dwb (dry            Underlay Range 2 – 10%
         content                         weight basis)
         Permeability                    mm/hour               > 20 (@32 drops by McIntyre Jakobsen)
         Wettability (AS4419)            mm/min                >5
         Dispensability in water                               1 or 2 (AS 4419 Category)


Chemical Properties
         Property                        Units           Target Range

         pH in water (1:5)               pH units        5.4 – 7.5
         pH in CaCl2 (1:5)               pH units        5.2 – 7.5
         Electrical conductivity (1:5)   dS/m            < 0.75
         (EC)
         Exchangeable Na                 % of eCEC       <6
         percentage
         Exchangeable Ca/Mg ratio        Ratio           3-9
         Available phosphorus            mg/kg           20 – 100
         Mehlich 3
         Olsen                                           20 - 50
         Available nitrogen (nitrate     mg/kg           20 - 60
         N + ammonium N)




URBIS
URB-P0003847-000-SP.DOCX                                                                                       PAGE   33

Page 38

  On Grade Soil Media – Gardens


 Quality – Soil must be free from any ‘unwanted materials’
 Physical properties particle sizes

    Property                                Units          Target Range

    Texture, preferred range                n/a            Sandy loam to clay loam
    (OM) Organic matter content             % dwb (dry     Medium Organic Range 10 -15%
                                            weight
                                            basis)
    Permeability                            mm/hour        > 20 (@ 32 drops by McIntyre Jakobsen)
    Wettability (AS4419)                    mm/min         >5
    Dispensability in water                                1 or 2 (AS 4419 Category)
    Large particles (naturally occurring)
    2 – 20mm                                % w/w          < 20
    > 20mm                                  % w/w          < 10
    Visible contaminants > 2mm (glass,      % w/w          < 0.5
    plastic and metal

Chemical properties

    Property                                Units        Target Range

    pH in water (1:5) standard range        pH units     5.4 – 6.8
    pH in CaCl2 (1:5) standard range        pH units     5.2 – 6.5
    pH in CaCl2 (1:5) alkaline range        pH units     6.8 – 8.0
    pH in CaCl2 (1:5) alkaline range        pH units     6.5 – 7.5


    Electrical conductivity (1:5) (EC)      dS/m         < 0.75
    Phosphorus – P-tolerant / standard      mg/kg        30 - 100
    plants
    Phosphorus for P-sensitive plants,      mg/kg        < 20
    alkaline soil methods 9B1 or 9C1
    Sodium (NA)                             % of eCEC    <7%
    Potassium (K)                           % of eCEC    3 – 15 %
    Calcium (Ca) method 18F1 (or 15A1       % of eCEC    50 - 80
    in alkaline soils)
    Exchangeable magnesium (Mg)             % of eCEC    10 - 30
    Exchangeable aluminium (Al)             % of eCEC    <5
    Exchangeable Ca/Mg ratio                w/w          3-9
    Available iron (Fe)                     mg/kg        100 - 400
    Available manganese (Mn)                mg/kg        25 - 100
    Available zinc (Zn)                     mg/kg        5 - 30
    Available copper (Cu)                   mg/kg        1 - 15
    Available boron (B)                     mg/kg        0.5 - 5
    Available nitrogen (nitrate N +         mg/kg        > 20
    ammonium N)



URBIS
URB-P0003847-000-SP.DOCX                                                                            PAGE   34

Page 39

 On Slab Soil Media A - Garden Upper Horizon


 Quality – Soil must be free from any ‘unwanted materials’

 Physical Properties

                                                   Units                     Target range
        Property
        Texture, preferred range                   n/a                       Gravelly loamy sand to organic
                                                                             sandy loam
        Air-filled porosity (AFP)                  %                         ≥ 10
        Chloride                                   %                         ≥ 40
        Water holding capacity                     %                         ≥ 30
        Permeability (@ 32 drops by McIntyre       mm/h                      > 40
        Jakobsen)
        Saturated Density                          kg/L                      < 1.8
        (OM) Organic matter content                % dwb (dry weight         Medium Organic Range 10 -
                                                   basis)                    15%
        Wettability                                min                       <5
        Dispensability in water                                              1 or 2 (AS4419) Category
        Large particles in the largest dimension
        < 2 mm                                     % w/w                     30–70
        2–10 mm                                    % w/w                     10 –20
        10–20 mm                                   % w/w                     5–10
        20–50 mm                                   % w/w                     <5
        > 50 mm                                    % w/w                     0


 Chemical Properties

                                                   Units      Target range
        C2. Chemical properties
        pH in water (1:5) Standard range           pH units   5.4–6.8
        Electrical Conductivity (1:1.5)            dS/m       < 2.2
        Chloride                                   mg/L       ≤ 200
        Ammonium-N (NH4)                           mg/L       ≤ 100
        Ammonium-N + nitrate-N (NH4 + NO3)         mg/L       ≥ 50
        Nitrogen draw-down index (NDI)             -          ≥ 0.7
        Toxicity index                             mm         ≥ 70
        Phosphorus – P standard range              mg/L       8–40
        Low phosphorus – P (P-sensitive plants)    mg/L       <3
        Potassium (K)                              mg/L       50–250
        Sulphate (SO4)                             mg/L       ≥ 40
        Calcium (Ca)                               mg/L       ≥ 80
        Magnesium (Mg)                             mg/L       ≥ 15
        Ca:Mg ratio                                –          1.5–10
        K:Mg ratio                                 –          1–7
        Sodium (Na)                                mg/L       ≤ 130
        Iron (Fe)                                  mg/L       ≥ 35
        Cooper (Cu)                                mg/L       0.4 - 15
        Zinc (Zn)                                  mg/L       0.3 - 10
        Manganese (Mn)                             mg/L       1 - 15
        Boron (B)                                  mg/L       0.02 – 0.65




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   35

Page 40

 On Slab Soil Media B - Gardens Lower Horizon


 Quality – Soil must be free from any ‘unwanted materials’

 Physical Properties

                                                   Units                     Target range
        Property
        Texture, preferred range                   n/a                       Gravelly loamy sand to organic
                                                                             sandy loam
        Air-filled porosity (AFP)                  %                         ≥ 10
        Chloride                                   %                         ≥ 40
        Water holding capacity                     %                         ≥ 30
        Permeability (@ 32 drops by McIntyre       mm/h                      > 40
        Jakobsen)
        Saturated Density                          kg/L                      < 1.2
        (OM) Organic matter content                % dwb (dry weight         Low Organic Range 3 – 5%
                                                   basis)
        Wettability                                min                       <5
        Dispensability in water                                              1 or 2 (AS4419) Category
        Large particles in the largest dimension
        < 2 mm                                     % w/w                     30–70
        2–10 mm                                    % w/w                     10 –20
        10–20 mm                                   % w/w                     5–10
        20–50 mm                                   % w/w                     <5
        > 50 mm                                    % w/w                     0


 Chemical Properties

                                                   Units      Target range
        C2. Chemical properties
        pH in water (1:5) Standard range           pH units   5.4–6.8
        Electrical Conductivity (1:1.5)            dS/m       < 2.2
        Chloride                                   mg/L       ≤ 200
        Ammonium-N (NH4)                           mg/L       ≤ 100
        Ammonium-N + nitrate-N (NH4 + NO3)         mg/L       ≥ 50
        Nitrogen draw-down index (NDI)             -          ≥ 0.7
        Toxicity index                             mm         ≥ 70
        Phosphorus – P standard range              mg/L       8–40
        Low phosphorus – P (P-sensitive plants)    mg/L       <3
        Potassium (K)                              mg/L       50–250
        Sulphate (SO4)                             mg/L       ≥ 40
        Calcium (Ca)                               mg/L       ≥ 80
        Magnesium (Mg)                             mg/L       ≥ 15
        Ca:Mg ratio                                –          1.5–10
        K:Mg ratio                                 –          1–7
        Sodium (Na)                                mg/L       ≤ 130
        Iron (Fe)                                  mg/L       ≥ 35
        Cooper (Cu)                                mg/L       0.4 - 15
        Zinc (Zn)                                  mg/L       0.3 - 10
        Manganese (Mn)                             mg/L       1 - 15
        Boron (B)                                  mg/L       0.02 – 0.65




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   36

Page 41

14.         GARDENS

14.1.       GENERAL SPECIFICATION
Samples
Supply soil sample testing reports as per soil section 18.1 in the frequency specified.

Supply 1 litre bag of each different soil type. Testing to include specific ingredient percentages, as specified
in AS 4419-2003: "Soils for landscaping and garden use" Table 1 on page 8 and "Documentation" on page
11.


14.2.       GARDEN PROFILES

 GA01: Garden Bed Profile – On Grade with organic mulch

 Mulch –100mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines
 Soil A - 400mm depth ‘On Grade soil media A’
 Soil B - where trees are planted, 600mm depth ‘On Grade soil media B’
 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA02: Garden Bed Profile – On Grade Revegetation

 Mulch – 50mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines
 Soil - 200mm depth ‘On Grade soil media - Gardens’ Refer to Section – Soils, for test results criteria
 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA03: Garden Bed Profile – Mulch only – On Grade
 Mulch –100mm depth, ‘Medium’ grade, aged / composted "Forest Blend" (100 x 20mm max. particle size)
 Soil – existing

 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 150mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA04: Garden Bed Profile – Basin Batter




URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   37

Page 42

 Mulch – 50mm depth, composted "Forest Blend" (100 x 20mm max. particle size)
 Soil - 100mm depth imported topsoil
 Coir Mesh- 750gsm gsm, biodegradable open weave approx. smaller than 25 x 25 mm mesh, Colour: natural,
 Pinning: Ensure the matting strips are firmly placed with one row of pins, with additional pinning along each
 edge, overlap and each row along the middle. Space pins no more than 500mm apart in each row and
 centrally to alternate with previous row. Ensure ends and overlapping joints are pinned no more than 450 mm
 apart. Pins are to be flush with ground.

 Topsoil Preparation – Cultivate and ameliorate subgrade. Install fertiliser and ameliorate topsoil insitu to meet
 AS.

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA05: Garden Bed Profile – Basin Floor - TO FUTURE INSTALLATION

 Installation of sacrificial turf by civil.
 Planting to future:
 Note: Landscaping to the surface of the bioretention basin filter media area must not commence
 until 80% of building work within each contributing catchment is complete or after 3 years,
 whichever occurs first.

 Mulch – 50mm depth, ‘fine’ grade, Sugar Cane Mulch.
 Jute Mesh - 750gsm, biodegradable open weave approx. 50 x 50 mm mesh, Colour: natural, Pinning: Ensure
 the matting strips are firmly placed with one row of pins, with additional pinning along each edge, overlap and
 each row along the middle. Space pins no more than 1.0 m apart in each row and centrally to alternate with
 previous row. Ensure ends and overlapping joints are pinned no more than 450 mm apart. Pins are to be flush
 with ground.
 Subgrade Preparation - Stripping temporary turf & geo-fab matting, remove & dispose off site

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA06: Garden Bed Profile – On Structure
 Mulch – 75mm depth, Polished Black Pebble Small 10-20mm
 Soil - 300mm depth ‘On Slab soil media A’ Refer to Section – Soils, for test results criteria
 Sand filter - 50mm depth (depth varies) fine washed sand, placed over filter fabric
 Filter fabric - Bidim A12 or approved equivalent, to have 150mm overlap at joints over drainage layer
 Drainage layer - 30mm thick Elmich VersiDrain 30 or approved equivalent
 Topping – minimum 40mm depth cementitious topping to fall to drains placed over waterproof membrane
 Waterproof membrane – Refer to architect’s documentation.

 To planter sides – 3mm 500gsm corflute protection board

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA07: Garden Bed Profile – On Grade with organic mulch




URBIS
URB-P0003847-000-SP.DOCX                                                                                    PAGE   38

Page 43

 Mulch –100mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines
 Soil A - 300mm depth ‘On Grade soil media A’
 Soil B - where trees are planted, 600mm depth ‘On Grade soil media B’

 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA07: Garden Bed Profile – Community Garden Planter beds
 Mulch - 50mm depth, Sugarcane mulch
 Soil - 300mm depth ‘On Slab soil media A’. Refer to Section – Soils, for test results criteria,
 300mm depth ‘On Slab soil media B’. Refer to Section – Soils, for test results criteria.

 Sand filter - 50mm depth (depth varies) to bottom of planter

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA08: Garden Bed Profile – On Grade without mulch
 Mulch – no
 Soil A - 200mm depth ‘On Grade soil media A’ - Optimum Soil Type is Sandy Loam
 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 150mm depth.

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.

 Note that these areas are for seeding application:
 Optimum Sowing Temperature: Between 15 and 25 degrees celsius
 Watering:
 All landscaped areas need water in dry periods.
 Dichondra will need additional irrigation in hot Summer months. Water at least twice a week – more frequently
 in extreme weather weeks.
 *During the first 30 days after seeding watering may be necessary 3-4 times a day. Seed should not be
 allowed to dry out.
 Starter Fertiliser:
 We recommend KickStart - a Starter Fertiliser to ensure successful germination.
 Apply 3kg of fertiliser per 100sqm (30 g/m2)
 Sowing Rate:
 New Sowing: 1kg per 100m2




URBIS
URB-P0003847-000-SP.DOCX                                                                               PAGE   39

Page 44

15.         TURF

15.1.       GENERAL SPECIFICATIONS
Samples
Supply soil testing reports as per Soil section in this specification in the frequency specified.

Garden Soil specification
All soil types are specified in the soil specification section in this specification.

All garden soil is to be consolidated yet not compacted. All soil is to be installed to heights which allow for
settlement, so that at off-maintenance all surface levels are to those detailed in the documents.

All garden soil is to be free of deleterious material such as sticks, tree roots, stones, weed seeds and is to be
non-toxic to living organisms. On-structure planters are to be free from any debris/rubble immediately prior to
drainage and soil placement.

Evenly grade between reduced levels i.e. (spot levels).

Inside Planter Walls
Wrap the waterproofing up the inside of the planter walls and/or and building façade. Use a protection board
to protect the waterproofing membrane. Lay nonwoven, needle punched filter fabric to base and up the sides
of the planter walls. Secure filter fabric between wall body and internal cladding (cladding to be min 150mm
depth). If rendering is use apply 150mm wide steel flashing in the same colour as rendered finish to fix filter
fabric to wall. Fix flashing through neoprene washer and seal flashing with flexible sealant on the top.

Turf pattern / joints
Lay a perimeter strip and then lay infill sods with staggered tightly butted joints. Dress joints and edges with
soil (the same soil as used under turf) as required to prevent the turf drying and to provide a smooth
transition to adjacent levels.

Watering
Water twice daily for the first week after laying to ensure rapid root establishment.

Top Dressing
Spread 10mm depth of medium washed river sand approximately 6 - 8 weeks after laying turf.

Quality
All turf must be AusGAP certified turf.




URBIS
URB-P0003847-000-SP.DOCX                                                                                   PAGE   40

Page 45

15.2.       TURF PROFILES

 TU01: Turf Profile – Turf on Grade
 Turf Type- Wintergreen Couch DNA certified
 Roll type - 600mm x 1.7m rolls (recommended for minimal wastage)
 Soil - 100mm depth ‘On grade soil media -Turf’
 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation).
 Installation - To finish flush with adjacent surface levels. Top-dress with 10mm layer of clean washed river sand
 to achieve uniform surface if uneven. Top-dressing only to be undertaken in growing seasons (September to
 March)




URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   41

Page 46

16.         PLANTING

16.1.       GENERAL SPECIFICATIONS
Quality
All plants 45L and over are to conform to NATSPEC's ‘Specifying Trees - a guide to assessment of tree
quality’, Second Edition 2003 by Ross Clark. The Contractor is to supply the Landscape Architect with a
written compliance certificate from a qualified Arborist.

All plants are to be vigorous and appropriately acclimatised with a rootball that is full but not restrained.

The root ball and canopy of all plants are to be balanced and the stem / trunk sufficiently developed so that
the plants stay upright without staking and/or guying.

The Contractor must inspect plants / transplants immediately after being unloaded to check quantity, quality,
vigour, health, crown balance (+/ - 20% from stem axis) and symmetry, crown density, pests (< 10% of
foliage), growth uniformity (max. internode <1.2 x shortest internode), included bark, sun scald, root division /
direction (>90% down and / or outwards) and occupancy (> 90% rootball intact when removed from
container) and rootball soil volume.

Sampling
Partial destructive sampling as outlined in NATSPEC's "Specifying Trees - a guide to assessment of tree
quality" is likely to be carried out on some trees and plants. Trees and plants that fail may cause entire
batches of trees and plants to be rejected.

Plant Substitutions
Any potential species substitutions or changes to nominated container or canopy sizes are to be noted in the
tender as potential alternatives. Specified tree species and size to be provided as the submitted tender.

Palm Heights
Palm heights are measured from the rootball surface to the base of the frond shaft for smooth trunk palms
such as Bangalow, Alexander and Royal Palms. Heights are measured to the base of the lowest fronds
(after any required frond pruning / removal) for rough trunk palms such as Canary Island Date Palms,
Livistonas and Washingtonias. Palm heights are never measured to the tip of the fronds.

Installation
Plants are to be installed in the locations shown on the planting plan. The tops of root balls of plants 45L and
over are to be level with or up to 50mm higher than the surrounding soil level. Create watering "saucers"
around all plants from containers larger than 5 litres (ie 200mm diameter). Do not pile up mulch against the
base of the plant stem/trunk.




URBIS
URB-P0003847-000-SP.DOCX                                                                                    PAGE   42

Page 47

16.2.       PLANT INSTALLATION

 Plant Installation: Ex-Ground + 1000L – On Grade
 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 100mm high, 1600mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Root Anchor – Platipus tree anchoring system.
 Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit,
 allowing for main trunk and canopy movement, which will provide wind support and promote root and stem
 growth.


 Plant Installation: 400L – On Grade

 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 100mm high, 1400mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots.
 Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the
 height of the main stem. Others as necessary to stabilise the plant.
 Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit,
 allowing for main trunk and canopy movement, which will provide wind support and promote root and stem
 growth.


 Plant Installation: 200L – On Grade

 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 100mm high, 1400mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots.
 Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the
 height of the main stem. Others as necessary to stabilise the plant.
 Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit,
 allowing for main trunk and canopy movement, which will provide wind support and promote root and stem
 growth.




Plant Installation: 100L – On Grade

 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 4 times the diameter of the
 rootball. Rip the sides of the hole prior to planting without disturbing the interfacing road sub-base.
 Watering dish - Form a 100mm high, 1000 mm diameter mounded soil watering dish around the tree. Infill the
 water dish with mulch.



URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   43

Page 48

 Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots.
 Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the
 height of the main stem. Others as necessary to stabilise the plant.
 Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit,
 allowing for main trunk and canopy movement, which will provide wind support and promote root and stem
 growth.


 Plant Installation: 75L – On Grade

 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 4 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 50mm high, 1000mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots.
 Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the
 height of the main stem. Others as necessary to stabilise the plant.
 Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit,
 allowing for main trunk and canopy movement, which will provide wind support and promote root and stem
 growth.


 Plant Installation: 45L – On Grade

 Planting Hole - Excavate a hole no deeper than the rootball. The hole is to be 5 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering Dish - Form a 50mm high, 600mm diameter mounded soil watering dish around the tree. Infill the
 water dish with mulch.
 Staking - Drive stakes into the ground, to approximately one third of their length, avoiding damage to roots.
 Install 3 times 50mm x 50mm x 2400mm stakes. Provide ties fixed securely to the stakes, one tie at half the
 height of the main stem. Others as necessary to stabilise the plant.
 Installation – Install as per manufacturers details. Re-tension after planting to provide a slightly loose fit,
 allowing for main trunk and canopy movement, which will provide wind support and promote root and stem
 growth.




 Tree and Palm Root Anchor & Foam Block: All Trees and Palms – On Structure
 Root Anchor product – Platipus tree anchoring systems – Specialist fixing system C/W Plati-Mat –
 RF2SPECIALP. Confirm right size for each rootball on site as per manufacturers documentation. Galvanised
 wire chokes, two-way ratchets tensioner with galvanises wire, 3x roper grips per leg, Plati-Mat rootball
 protection. Welded steel mesh (min 12mm 0.5” diameter) 100mm larger than the rootball to all sides.
 Installation – Place welded steel mesh on top of drainage cell over the geo fabric. Add rope grips. Add Sand
 filter layer. Fill soil as per manufacturers details. Re-tension after planting.

 Foam – Trees requiring to be elevated in order for the top of the root ball to sit flush with the surrounding
 finishes soil levels are to sit on foam block out. Trees are not to be elevated using soil or sand.




URBIS
URB-P0003847-000-SP.DOCX                                                                                     PAGE   44

Page 49

 Plant Installation: Ex-Ground + 1000L – On Structure
 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 100mm high, 1600mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above




 Plant Installation: 400L – On Structure
 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 100mm high, 1400mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above




 Plant Installation: 200L – On Structure
 Planting hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball. Rip the sides of the hole prior to planting.
 Watering dish - Form a 100mm high, 1400mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above




 Plant Installation: 100L – On Structure
 Planting hole - Excavate a hole no deeper than the rootball. Place course sand layer under tree or palm
 rootball to ensure the top of rootball is level with finished top of soil level.
 Watering dish - Form a 100mm high, 1000 mm diameter mounded soil watering dish around the tree. Infill the
 water dish with mulch.
 Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above




 Plant Installation: 75L – On Structure
 Planting hole - Excavate a hole no deeper than the rootball. Place course sand layer under tree or palm
 rootball to ensure the top of rootball is level with finished top of soil level.
 Watering dish - Form a 50mm high, 1000mm diameter mounded soil watering dish around the tree. Infill the
 watering dish with mulch. Fill the dish with water regularly during the initial plant establishment period.
 Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above




 Plant Installation: 45L – On Structure




URBIS
URB-P0003847-000-SP.DOCX                                                                               PAGE   45

Page 50

 Planting Hole - Excavate a hole no deeper than the rootball. Place course sand layer under tree or palm
 rootball to ensure the top of rootball is level with finished top of soil level.
 Watering Dish - Form a 50mm high, 600mm diameter mounded soil watering dish around the tree. Infill the
 water dish with mulch.
 Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above


 Plant Installation: 400mm – 140mm pot – On Grade and On Structure

 Planting Hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the
 rootball.
 Watering Dish - Form a mounded soil watering dish around the plant. Infill the water dish with mulch ensuring
 no mulch is in contact with the plant crown.


 Plant Installation: 75mm tubes– On Grade and On Structure
 Planting Hole - Hole diameter: The hole is to be 3 times the diameter of the rootball. Hole depth: Subsurface
 material at the bottom of the hole shall be decompacted to a depth of 100 mm and lightly compacted
 Watering Dish - Form a mounded soil watering dish around the plant. Infill the water dish with mulch ensuring
 no mulch is in contact with the plant crown.




URBIS
URB-P0003847-000-SP.DOCX                                                                                PAGE   46

Page 51

17.         IRRIGATION SYSTEM

17.1.       GENERAL SPECIFICATIONS
It is the Head Contractors responsibility to co-ordinate all required Approval Authorities connection
approvals and certificates.

Individual courtyards / levels / areas are to be capable of being individually programmed.

Water meter to common areas per Hydaulic Design by Balmain & Co.

All irrigation designs within all landscape and turf areas must apply a distribution uniformity equal to or
greater than 75% (DU).

The scheduling of the irrigation system (Automatic Control Programs) shall be set to achieve the maximum
efficiencies possible. The application rate of the system must not be greater than the infiltration rate of the
soil. Pooling of irrigation water on the surface will not be accepted. Adding “cycle & soak” to the irrigation
programs will eliminate this scenario where the application rate of the irrigation system exceeds the
infiltration rate of the soil.

All irrigation conduits on basement and podium are to be cast into the structural slab. This and all
penetration through the structural slab are to be closely coordinated with structural engineer and
hydraulic engineer.

Full description of the required system and its components are to be listed in the submitted documentation.
This documentation should include drawings and schedule of quantities. It is the responsibility of the
Irrigation Contractor to ensure they have all the relevant documentation and to provide a detailed Schedule
of quantities. If a "Lump Sum" submission is tendered it will be presumed that all the required items have
been included in the Tender price.

If existing Services are located on site, it is the contractor’s responsibility to source all existing as constructed
information for all services for local authorities or/and client before commencement of works. The contractor
must obtain approval from the client prior to commencement of any excavation in the vicinity of existing
services.

Submit all documents to the Landscape Architect for review and approval. Locations of meter boxes,
mains connections and valve and meter box locations to be approved by Landscape Architect.

The equipment and installation processes described are intended to produce an irrigation system which
complies with all applicable industry and local authority and Australian standards.

The Irrigation Contractor will inspect the site and verify the available water flow and pressure, prior to
lodgement of design and Tender. The Irrigation Contractor will be responsible for all works required. Items
not specifically described in this Specification, but which would normally be required to produce a fully
functioning irrigation system are to be considered part of the required works.

It is the Irrigation Contractor’s responsibility to bring to the Superintendent’s attention any concerns, potential
obstacles or possible improvements before construction commences.




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   47

Page 52

17.2.       IRRIGATION TYPES

   Permanent automated sub-surface and surface spray irrigation system (D&C)
   Description – Design, supply, installation and commissioning of a permanent automated sub-surface
   irrigation system. To include pump, controller and all electricals.
   Water supply - From the on-site rainwater collection tank(s) and from the potable main water connection.
   Extent - The system is to cover all new gardens beds, trees/palms and lawns
   Capacity - The system is to be capable of supplying 32mm of water/week/m2 over all areas. It is to be
   designed to operate for 10 years (minimum).
   Installation – For planting areas water is to be delivered via sub-surface (ie. under the mulch but above the
   soil) drip lines. Conduits are to be provided under paving, walls etc by the Head Contractor. Individual trees
   (100 litre and over) are to be fitted with a drip line around the root ball. For turf areas, water is to be
   delivered via pop up sprays, with a minimum overlap of 30 degrees to irrigation zones.
   Pit Installation - Valve pits are to be set on a 200mm deep bed of gravel for drainage. Pit covers are to be
   level with the soil surface.
   Plumbing - Include plumbing connection to the main line, all valves and backflow prevention. Install a
   suitably sized pump and housing to provide the necessary flow rates and pressure. Incorporate the ability to
   automatically switch to mains water (if allowed) when the rainwater tank is dry. A dedicated GPO is to be
   provided by the Head Contractor.
   Controller - Locate a central multi-station controller in a lockable box as directed by the Superintendent.
   Allocate 1 station for each private lawn, 1 for any communal lawn, 1 for each private garden area and
   several for the different communal garden areas to accommodate different microclimates and plant water
   requirements. A dedicated GPO is to be provided by the Head Contractor.
   Rain sensor – Locate a rain sensor in an adequate spot and connect it to the controller
   Authority Approvals - All work is to be approved by the regulatory authority.
   As Builts - Prepare and supply as installed drawings and commission the system.

   Notes:
       - A meter is to be installed to measure the amount of water used by the system.
       - Water is to be delivered to lawns and gardens via pop up sprays. All sprays to be pop-up on swing
          arms and provide min. 200% cover.
       - Avoid over spray onto pavement, buildings or other structures.

   Notes – Refer to 750-IR (Irrigation Drawings for Garden Beds to be irrigated). Hose connection point to be
   provided by others.




URBIS
URB-P0003847-000-SP.DOCX                                                                                   PAGE   48

Page 53

18.         INSPECTIONS
The Contractor must request the Landscape Architect to attend inspections at the required inspections noted
in this document and as advised by the Landscape Architect. An Inspection schedule shall be developed in
conjunction with the Superintendent.

The Superintendent shall undertake inspections of construction work carried out by the Contractor
throughout the period of the Contract. Any delays or extensions to the program or maintenance period, and
associated costs arising from lack of notification to Landscape Architect by the Superintendent, are to be
borne by the Superintendent and Contractor. The Contractor is to provide at least 2 weeks notice to the
Superintendent prior to any inspection required.

Work is not to proceed without approval from the Landscape Architect. Failure to gain approvals may result
in rectification of substantial amounts of work at the Contractor’s expense.

The Landscape Architect may inspect the works without notice at any time.

Pre Start Meeting
The landscape pre-start meeting must be conducted prior to work commencing on site, giving at least 5
business days’ notice.

The pre-start meeting must be attended by the:

•     Superintendent;
•     Principal Contractor;
•     Landscape Contractor;
•     Landscape Architect;
•     Council and / or relevant stakeholder representative
•     All other relevant parties.

Structural Inspections during Construction
A Structural Engineer engaged by the contractor shall undertake inspections of structural construction work
carried out by the Contractor throughout the period of the Contract. The Contractor is to provide at least 48
hours-notice to the Superintendent prior to any inspection that the Structural Engineer will be on-site with all
reporting (Structural Certifications) due within 48 hours after the inspection.

Practical Completion Inspection
At Practical Completion the Contractor, the Landscape Architect, the Superintendent and the Superintendent
shall carry out a joint Inspection to ensure all landscape works have reached practical completion.

Items identified requiring attention, during the inspection are to be addressed immediately or as agreed.

The practical completion marks the start of the 52 weeks Establishment maintenance and Defects Liability
period.

Prior to the Practical Completion Inspection, the Contractor must provide the certificates below to the
Landscape Architect and Superintendent:

•     Certification that all landscaping works have been completed in accordance with the approvals
•     Soil Scientist certifications
•     Pavements slip resistance certifications.
•     Access certification that works meet all standard requirements.
•     Wall, furniture and surface certification of anti-graffiti treatment.
•     Maintenance manuals, parts and manufacture’s guarantees for all structures, furniture, pavement, seals,
      fixtures or other used products.



URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   49

Page 54

End of Establishment Maintenance Inspection
Four months prior to the agreed end of establishment period the Contractor, the Landscape Architect and the
Superintendent shall carry out a joint Inspection to ensure all landscape works are maintained as agreed.

Items identified requiring attention, during the inspection are to be addressed immediately or as agreed.

Quality Control Inspection
Two weeks prior to the agreed end of establishment period the Contractor and the Landscape Architect shall
carry out an Inspection to ensure all landscape works are ready for the hand-over.

Items identified requiring attention, during the inspection are to be addressed immediately.

Handover
At the end of establishment period the Contractor, the Landscape Architect and the Superintendent shall
carry out a joint Inspection to ensure all landscape works are maintained and cleaned to the client’s
expectation.

Prior to the Handover the Contractor must provide the certificates below to the Superintendent:

•    Arborist certification that all trees and palms in public land have been inspected and rectification works
     for public safety and longevity of the tree/s have been completed.
•    Prove of completion of all maintenance works which were required within the 52 weeks period by the
     manufacturers recommendation.




URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   50

Page 55

18.1.       INSPECTION SCHEDULE
         Inspections

1       Prestart Meeting (1x inspection)

2       Hold point inspections as per Hold point schedule (1x inspections)

3       Construction period inspections (1x inspections)

4       Practical Completion Inspection (1x inspection)

5       Defects Completion Inspection (1x inspection)

6       Council On-Maintenance Inspection (1x inspection)

7       End of Establishment Maintenance Inspection (1x inspection)

8       Client / Council Off Maintenance Handover Inspection (1x inspection)



No sub-staging, separable portions or trade packages have been allowed for during documentation or
construction. It is assumed that the landscape set is suitable for trade packages purposes.
No allowance has been made for changes to the plant schedules or drawings, nor for updated client / approval
authority approvals or contractor liaison arising from lack of early plant procurement by the contractor, leading
to unavailability of specified trees or plants. This work will be done on hourly rate basis, payable by the Head
Contractor.
No allowance has been made for us to make modifications to our CAD (2D) or Revit (3D) documentation during
construction based on site changes, or updates from other consultants for example. It is assumed that any
changes will be captured as part of the “As-constructed” scope.
No allowance has been made to attend regular site co-ordination meetings. If these meetings align with the
above listed site inspections, the Landscape Architect will assess if attendance is required.
If additional inspections to those listed above are required due to incorrectly installed works, or failure
to order materials and plant stock, or to maintain the completed works sufficiently to achieve
handover, the costs for additional Landscape Architects inspections are to the responsibility of the
Contractor / Head Contractor.




URBIS
URB-P0003847-000-SP.DOCX                                                                                 PAGE   51

Page 56

19.         ESTABLISHMENT MAINTENANCE

19.1.       GENERAL
The work contained in this section comprises the establishment maintenance of all works executed under
this contract. The Establishment Maintenance period begins at the issue of the Certificate of Practical
Completion. Maintain the contract areas for a period of 52 weeks.

Maintenance of the works prior to the date of Practical Completion shall not be included in this period.

If the maintenance period is extended, it is the Clients responsibility to meet the capital and maintenance
costs of elements that require refurbishment.

Promptly make good any defects or damage resulting from defective construction, materials or workmanship
to the complete satisfaction of the Superintendent during this period. The cost of replacement is the
responsibility of the Contractor. In the event of any failure to rectify defective work the Superintendent may
instruct that the work be carried out by another company, the cost of which will be charged to the Contractor.

Stolen items and plants are not included into the establishment maintenance. It is the Contractors
responsibility to source and plant or place them in coordination with the facility management.

It is the Contractors responsibility to highlight areas or items which may require additional maintenance
management to the facility management. These include emptying of rubbish bins, general regular cleaning
etc.

Prior to the Handover allow for a clean up to presentation standard of the entire landscape works area.

Tasks which are required on a 12-month interval are to be complete prior to the end of maintenance
compliance inspection. This includes all timber surfaces to be recoated with protective treatment as
specified.


19.2.       TREE TRANSPLANTING / PROTECTION MAINTENANCE
The start date for transplanted trees and palms begins the day the tree(s) or palm(s) are placed in their
proposed final location and backfilled. The period from the transplanting of all plants until the start of certified
On-Maintenance period is to be considered in addition to the required full maintenance period. The required
maintenance period is not completed until certified Off-Maintenance is granted.

Carry out all maintenance activities on the transplant(s) necessary to ensure they become fully re-
established within the Establishment Maintenance period and are returned to a healthy and vigorous state
with a min. 90% of the original foliage density (i.e. excluding epicormic growth).

Watering
The tree(s) may require large volumes of water to be applied by hand at the time of planting and repeated
twice weekly during the initial period (min. 6 weeks). Test, rectify and adjust the irrigation system or watering
regime as necessary to maintain optimum soil moisture levels in and around the root plate(s). The root plate
(and not the surrounding backfill soil) is the tree's main water source for many months after transplanting.
Ensure it is kept moist (but not over watered) at all times.

Wrapping
For thin or smooth bark trees, if more than 40% of the foliage is shed due to post-transplant stress then the
trunk and branches (greater than 50mm diameter) are to be wrapped with light coloured biodegradable
paper or hessian to reduce bark scalding. Wrap from the bottom of the trunk upwards so the layers overlap
and thus shed water.




URBIS
URB-P0003847-000-SP.DOCX                                                                                     PAGE   52

Page 57

Soil testing
Provide detailed chemical and physical test results of the root plate of each tree and backfill soil 2 weeks
prior to the completion of the Establishment Maintenance period. Rectify any identified chemical or physical
soil imbalances as per the testing laboratory recommendations prior to the completion of the Establishment
Maintenance period.


19.3.       ESTABLISHMENT MAINTENANCE LOG
Keep a detailed maintenance log of all activities undertaken including watering regimes and fertiliser
applications. This log is to be given to the Landscape Architect and Facility Manager at the completion of the
Establishment Maintenance period.




URBIS
URB-P0003847-000-SP.DOCX                                                                               PAGE   53

Page 58

19.4.       ESTABLISHMENT MAINTENANCE TASKS
   Task                        Standard

 Turfed areas              •     Test, rectify and adjust the watering regimes or water manually regularly as
                                 necessary to maintain optimum soil moisture levels in all areas
                           •     Fertilize at 3-month intervals
                           •     Aerate at 12-month intervals
                           •     Replace bare patches over 1m2 immediately
                           •     Trim edges to maintain straight lines
                           •     Check regularly for pest infection and apply pest treatment
                           •     Weed regularly to keep weed infestation to a minimum
                           •     Mow regularly as required
                           •     Apply 10mm deep clean washed river sand as a top dressing at 12-month intervals

 Garden beds               •     Test, rectify and adjust the watering regimes or water manually regularly as
                                 necessary to maintain optimum soil moisture levels in all areas
                           •     Replace failed plans immediately
                           •     Weed regularly (weekly)
                           •     Top up organic mulch at 6-month intervals
                           •     Top up gravel mulch as required
                           •     Mulched surfaces are to be kept clean and tidy and free of any deleterious material
                                 and foreign matter
                           •     Check plants weekly of pest and disease infestation
                           •     Spray for pests and disease infestations when the pest and fungal attack has been
                                 identified
                           •     Apply a balance of man-made and natural slow release fertiliser to all planting
                                 areas in a 3-month interval.
                           •     Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
                                 adapt fertiliser regime to suit. Treat as required
                           •     Aerate at 12-month intervals
                           •     Clean all leaves of plants which are undercover at a monthly interval

 Trees and shrubs          •     Trees may require up to 50L of water to be applied by hand at the time of planting
                                 and repeated twice weekly during the initial period (minimum 6 weeks). Test, rectify
                                 and adjust the watering regimes or water manually regularly as necessary to
                                 maintain optimum soil moisture levels in all areas
                           •     Replace failed plants immediately
                           •     Adjust and/or replace stakes and ties monthly. Remove staking and visible guying
                                 after 11 months.
                           •     Prune shrubs and trees in accordance to the maintenance manual. In general,
                                 shrubs and trees will be tip pruned to ensure a strong, sound form and dense,
                                 bushy appearance. Remove of overhanging branches or foliage that prevents
                                 proper function of a space e.g. pathways, seating areas, sightlines. Remove
                                 branches which are at risk of storm damage
                           •     All tree pruning to be carried out by a qualified arborist
                           •     Apply root hormone periodically once new roots have begun to grow (fertiliser is
                                 unlikely to be effective until new roots are absorbing water).
                           •     Clean all leaves of trees and shrubs which are undercover at a monthly interval
                           •     Weed regularly (weekly)
                           •     Top up organic mulch at 6-month intervals




URBIS
URB-P0003847-000-SP.DOCX                                                                                        PAGE   54

Page 59

                             •   Top up gravel mulch as required
                             •   Mulched surfaces are to be kept clean and tidy and free of any deleterious material
                                 and foreign matter
                             •   Check plants weekly of pest and disease infestation
                             •   Spray for pests and disease infestations when the pest and fungal attack has been
                                 identified
                             •   Apply a balance of man-made and natural slow release fertiliser to all planting
                                 areas in a 3-month interval.
                             •   Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
                                 adapt fertiliser regime to suit. Treat as required
                             •   Aerate at 12-month intervals

 Trellis System              •   Test, rectify and adjust the watering regimes or water manually regularly as
                                 necessary to maintain optimum soil moisture levels in all areas
                             •   Bind up climbing plants
                             •   Replace failed plans immediately
                             •   Weed regularly (weekly)
                             •   Check plants weekly of pest and disease infestation
                             •   Spray for pests and disease infestations when the pest and fungal attack has been
                                 identified
                             •   Apply fertilizer as per manufactures manual
                             •   Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
                                 adapt fertiliser regime to suit. Treat as required

 Irrigation                  •   Adjust irrigation control as required by the respective season
                             •   Check irrigation system of possible leaks and sound operation of automatic system
                                 monthly
                             •   Flush irrigation system at 12-month intervals.
                             •   Maintain irrigation component as required by the manufacturers manual

 External furniture and      •   Maintained in accordance to manufacturer’s instructions
 structure                   •   Apply sealer in accordance to manufacturer’s instructions



 Timber Works                •   Inspect monthly
                             •   Removal of splinters, the replacement of cracked, cupped or degraded boards as
                                 identified at inspection
                             •   Apply a light sand and preservative coat in accordance with manufacturers
                                 specification at 6-month intervals
                             •   Retightening and/or replacement of fixings at 12-month intervals

 Artificial Timber Works     •   Inspect monthly
                             •   Sweep deck and clean gaps between the boards regularly
                             •   Clean deck in the intervals and with a cleaning product recommended by the
                                 manufacturer
                             •   Do not use high pressure cleaners
                             •   Treat scuffs and scratches as per manufacturers recommendation

 Tree / Palm Transplanting   •   Monitoring / adjusting the irrigation system or watering regime in liaison with the
                                 Landscape Contractor, water if required
                             •   Test, rectify and adjust the watering regimes or water manually regularly as
                                 necessary to maintain optimum soil moisture levels in all areas



URBIS
URB-P0003847-000-SP.DOCX                                                                                         PAGE   55

Page 60

                           •   Spray for pests and disease infestations when the pest and fungal attack has been
                               identified
                           •   Apply fertilize once root growth & water uptake has begun
                           •   Wrap trunk/branch to prevent sun scald if necessary due to leaf loss >40%
                           •   Prune dieback
                           •   Top up soil and mulch
                           •   For thin or smooth bark trees, if more than 40% of the foliage is shed due to post-
                               transplant stress then the trunk and branches (greater than 50mm diameter) are to
                               be wrapped with light coloured biodegradable paper or hessian to reduce bark
                               scalding. Wrap from the bottom of the trunk upwards so the layers overlap and thus
                               shed water.
                           •   Organise soil testing
                           •   Adjust and/or replace stakes and ties monthly. Remove staking and visible guying
                               after 11 months.
                           •   Weed regularly (weekly)

   Swale / Bio Pods        •   Test, rectify and adjust the watering regimes or water manually regularly as
                               necessary to maintain optimum soil moisture levels in all areas
                           •   The uses of synthetic, granular blended fertilisers on the site are not permitted.
                               Slow release organic tree tablets shall be used at establishment.
                           •   Spray for pests and disease infestations when the pest and fungal attack has been
                               identified
                           •   Replace failed plans immediately
                           •   Weed regularly (weekly)
                           •   Top up gravel mulch as required
                           •   Sweep and/or remove from bio-pod area any fallen branches and leaf (including
                               any autumn leaf drop), grass clippings and other garden debris.
                           •   Maintenance of the bio-pods includes the detention area, 1:3 batters, kick edges,
                               bio-pod grate covers, and gutter in front of the bio-pod.
                           •   Subsoil drains are to be cleaned out and accumulated sediment manually removed
                               from the surface area of the bio retention device at Off Maintenance and as
                               required during the maintenance period.




URBIS
URB-P0003847-000-SP.DOCX                                                                                   PAGE   56

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.