Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Lanscaping Specification URB-P0003847-000-SP-240719

of 60

Page text shows just the words. Original shows the document exactly as it was published.

14.         GARDENS

14.1.       GENERAL SPECIFICATION
Samples
Supply soil sample testing reports as per soil section 18.1 in the frequency specified.

Supply 1 litre bag of each different soil type. Testing to include specific ingredient percentages, as specified
in AS 4419-2003: "Soils for landscaping and garden use" Table 1 on page 8 and "Documentation" on page
11.


14.2.       GARDEN PROFILES

 GA01: Garden Bed Profile – On Grade with organic mulch

 Mulch –100mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines
 Soil A - 400mm depth ‘On Grade soil media A’
 Soil B - where trees are planted, 600mm depth ‘On Grade soil media B’
 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA02: Garden Bed Profile – On Grade Revegetation

 Mulch – 50mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines
 Soil - 200mm depth ‘On Grade soil media - Gardens’ Refer to Section – Soils, for test results criteria
 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA03: Garden Bed Profile – Mulch only – On Grade
 Mulch –100mm depth, ‘Medium’ grade, aged / composted "Forest Blend" (100 x 20mm max. particle size)
 Soil – existing

 Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum
 two weeks prior to lawn installation). Rip to 150mm depth. Where clay conditions are found, incorporate
 gypsum or clay breaker at the rate of 100g/m2

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.


 GA04: Garden Bed Profile – Basin Batter




URBIS
URB-P0003847-000-SP.DOCX                                                                                  PAGE   37
Log in to download the original file

Lanscaping Specification URB-P0003847-000-SP-240719.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.