Original source · versioned page text
Lanscaping Specification URB-P0003847-000-SP-240719
Planting Hole - Excavate a hole no deeper than the rootball. Place course sand layer under tree or palm rootball to ensure the top of rootball is level with finished top of soil level. Watering Dish - Form a 50mm high, 600mm diameter mounded soil watering dish around the tree. Infill the water dish with mulch. Root Anchor and Foam Block – Platipus tree anchoring systems and Foam Block as above Plant Installation: 400mm – 140mm pot – On Grade and On Structure Planting Hole - Excavate a hole no deeper than the rootball. The hole is to be 3 times the diameter of the rootball. Watering Dish - Form a mounded soil watering dish around the plant. Infill the water dish with mulch ensuring no mulch is in contact with the plant crown. Plant Installation: 75mm tubes– On Grade and On Structure Planting Hole - Hole diameter: The hole is to be 3 times the diameter of the rootball. Hole depth: Subsurface material at the bottom of the hole shall be decompacted to a depth of 100 mm and lightly compacted Watering Dish - Form a mounded soil watering dish around the plant. Infill the water dish with mulch ensuring no mulch is in contact with the plant crown. URBIS URB-P0003847-000-SP.DOCX PAGE 46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original