Soil testing
Provide detailed chemical and physical test results of the root plate of each tree and backfill soil 2 weeks
prior to the completion of the Establishment Maintenance period. Rectify any identified chemical or physical
soil imbalances as per the testing laboratory recommendations prior to the completion of the Establishment
Maintenance period.


19.3.       ESTABLISHMENT MAINTENANCE LOG
Keep a detailed maintenance log of all activities undertaken including watering regimes and fertiliser
applications. This log is to be given to the Landscape Architect and Facility Manager at the completion of the
Establishment Maintenance period.




URBIS
URB-P0003847-000-SP.DOCX                                                                               PAGE   53
Log in to download the original file

Lanscaping Specification URB-P0003847-000-SP-240719.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.