Original source · versioned page text
2017-10-10 S&O Agenda - Attachment 1 to Item 6 - Sport and Active Recreation Plan
The original of this document is very large (21.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Sport and Active Recreation Plan
The Noosa Shire is home to three surf clubs: Noosa and horse riders. Due to the linear nature of trails, Trails used by mountain bikers also exist in the 8.10 Events
Heads Surf Life Saving Club, Peregian Beach Surf they invariably transverse multiple tenures which Noosa National Park linking Peregian and Noosa,
Lifesaving Club (under the management of Noosa can raise issues of liability, safety, connection, the Great Sandy National Park, Tinbeerwah, Noosa is home to a number of large scale sporting
Heads Surf Life Saving Club), and Sunshine Beach maintenance etc. Tuchekoi National Park and Woondum National events. It is estimated that sporting events
Surf Life Saving Club. Surf clubs have a vital role in Park. contribute approximately $25 million each year to
the community providing surf patrol and rescue The Noosa Trail Network will be the focus of a the local economy. The following is a list of these
services, surf sports competitions and education and Tourism Noosa led Noosa Trail Master Plan to be Feedback provided on the Draft Sport and Active annual events:
community service. developed in 2017/18. This Master Plan will aim Recreation Plan indicate that both approved and
to outline the future development, management, unapproved trails are being used by mountain • Noosa Summer Swim (Feb)
Surf clubs often use local swimming pools for flat opportunities and key actions necessary for walking bike riders across the Shire. • Noosa Festival of Surfing (March)
water training. Similarly to other volunteer based and bike trails on the Noosa Trail Network. • Ultraman Australia (May)
sports clubs, surf clubs are experiencing a rise in The Sunshine Coast Cycling Club which operates • Noosa Ultimate Sports Festival (May)
operational and equipment costs and an expectation Cyclists comprise users of varying age and abilities regionally, has expressed the need for a public • Sunshine Coastrek (July)
to provide year-round activities (winter lifesaving from competitive sports to commuter to the velodrome in the region to meet the training and • Pomona King of the Mountain (July)
sports competitions) with some clubs now patrolling family on a recreational ride. Cyclists have varying competition needs of track cyclists. The closest • Noosa Strade Bianche (August)
12 months of the year. skill levels and needs. When developing cycling/ velodrome is in Brisbane. A feasibility study would • Hydrothon Noosa (Sept)
pathways infrastructure, consideration should be be required in partnership with neighbouring • Noosa International Rugby Sevens Festival
The changing nature of volunteerism is affecting given to cyclists who have not developed their LGAs, Cycling Qld and local stakeholders to inform (October)
surf clubs with clubs reporting that volunteers are road sense (eg children and inexperienced adults) the demand and location of any future regional • Noosa Triathlon Multi Sports Festival (Oct-
not wanting to commit to extended periods of time through the provision of adequate off-road facilities velodrome. Nov)
which has forced training and patrol activities to and safe road crossing facilities (particularly around • Sunshine Coast Masters (Dec)
adapt. schools and sporting venues). Wayfinding signage Given the high participation numbers, the • World Series Swim Open Days
(in line with Noosa Design Principles) along walking increasing use of on-road and off-road trails
A survey of NFP sporting organisations was
8.9 Cycle Ways, Pathways and and cycle path networks is essential infrastructure and the requests for additional infrastructure
conducted in preparation for this Plan in which
that should be an inclusion when planning and for cycling, the Shire would benefit from the
Trails Network constructing any pathway to further encourage development of a cycle/bike plan that provided
they were asked about events hosted at their
venues.
regular use in addition to landscaping that provides an evidence-based and ‘master planned’
Noosa has an extensive walking and cycle network
natural shading along routes. Across the Shire ‘gaps’ approach to all types of cycling and the required Of the 38 clubs that responded to the survey 64%
that caters for a variety of fitness levels in both the
or ‘missing sections’ in trails and pathways have infrastructure to meet current and future demand. of clubs had hosted a major sporting event or
hinterland and coastal regions. Walking, mountain
biking, bushwalking and cycling were four of been identified which need to be addressed in line carnival at their grounds with 50% of respondents
This would require significant input and
the top five most popular physical activities for with the Noosa Transport Strategy, Principle Cycle also reporting hosting non-sporting events at
consultation with surrounding LGAs, QPWS,
residents according to the Noosa Physical Activity Network Plan SEQ and the Priority Routes identified their grounds in the last three years.
SLOs, and local stakeholders. This Plan
Participation Survey. Activities such as cycling, for Noosa.
would incorporate the findings and key Clubs reported that 65% of these events occurred
mountain biking, adventure racing and bush recommendations from other developed and
Mountain biking is experiencing a rapid growth, annually. There exists an opportunity to better co-
walking are major contributors to a continuously developing plans including the Noosa Trail
particularly in Noosa. The upgrade of tracks in the ordinate these events and develop partnerships
growing ‘adventure toursim market’ and provide the Network Master Plan and Noosa Transport
Tewantin National Park (Wooroi section) has seen with commercial operators and Tourism Noosa to
opportunity for nature-based tourism that can be of Strategy.
a significant increase in use, putting significant enhance the “Noosa experience” and economic
great economic benefit to hinterland villages.
pressure on trails and surrounding vegetation benefit to the broader community. This may
The Noosa Trail Network provides a series of eight with the need for amenities identified as a major also require capacity building for clubs in event
multi-use trails (total length approximately 90kms) concern for the public in the Noosa Physical Activity management.
suitable for bushwalkers, mountain bike riders Participation Survey.
Page 36 Page 37
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.